约旦建筑部门的关系承包作为传统正式方法的替代品

Razan Aleasawi, Sultan Tarawneh
{"title":"约旦建筑部门的关系承包作为传统正式方法的替代品","authors":"Razan Aleasawi, Sultan Tarawneh","doi":"10.3844/ajeassp.2020.138.145","DOIUrl":null,"url":null,"abstract":"The socioeconomic policies within the Hashemite Kingdom of Jordan aim to enhance the Public-Private Partnership (PPP), one of the Relational Contracting models, to encourage investment, improve public services, upgrade infrastructure and boost financial resources, in line with Jordan 2025 Vision (Ministry of Municipal Affairs, 2014). The construction sector itself has a growth plan of 5% in order to meet this vision, however, it suffers many difficulties. This paper aims to highlight one of the main problems (i.e., wrong choice of the contracting model) that causes a significant effect on the project as well as create a practical project management tool that supports the decision-making process at the concept stage of projects in Jordan. The project context (internal and external factors) has been linked to different parts of the contracting model; contract forms, compensation forms and co-operation forms “Fig. 1”. The aim is to find the relationship between each factor within every part of the contracting model. Consequently, identify how all these relationships could affect the process of selecting the cooperation form, between the owner and the contractor(s). Semi-structured interviews with parties who have actual experience with relational contracting in the Jordanian construction sector have been conducted. The main findings of this research led to the creation of a project management tool that supports the decision-making process at the concept stage of projects in Jordan, regarding relational contracting. These findings suggest that relational contracting is the right choice for complex projects within the context of critical resources, critical resources and lead-time and uncertainties.","PeriodicalId":7425,"journal":{"name":"American Journal of Engineering and Applied Sciences","volume":"52 1","pages":"138-145"},"PeriodicalIF":0.0000,"publicationDate":"2020-03-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Relational Contracting in the Building Sector in Jordan as a Substitute to Conventional Formal Methods\",\"authors\":\"Razan Aleasawi, Sultan Tarawneh\",\"doi\":\"10.3844/ajeassp.2020.138.145\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The socioeconomic policies within the Hashemite Kingdom of Jordan aim to enhance the Public-Private Partnership (PPP), one of the Relational Contracting models, to encourage investment, improve public services, upgrade infrastructure and boost financial resources, in line with Jordan 2025 Vision (Ministry of Municipal Affairs, 2014). The construction sector itself has a growth plan of 5% in order to meet this vision, however, it suffers many difficulties. This paper aims to highlight one of the main problems (i.e., wrong choice of the contracting model) that causes a significant effect on the project as well as create a practical project management tool that supports the decision-making process at the concept stage of projects in Jordan. The project context (internal and external factors) has been linked to different parts of the contracting model; contract forms, compensation forms and co-operation forms “Fig. 1”. The aim is to find the relationship between each factor within every part of the contracting model. Consequently, identify how all these relationships could affect the process of selecting the cooperation form, between the owner and the contractor(s). Semi-structured interviews with parties who have actual experience with relational contracting in the Jordanian construction sector have been conducted. The main findings of this research led to the creation of a project management tool that supports the decision-making process at the concept stage of projects in Jordan, regarding relational contracting. These findings suggest that relational contracting is the right choice for complex projects within the context of critical resources, critical resources and lead-time and uncertainties.\",\"PeriodicalId\":7425,\"journal\":{\"name\":\"American Journal of Engineering and Applied Sciences\",\"volume\":\"52 1\",\"pages\":\"138-145\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-03-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"American Journal of Engineering and Applied Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3844/ajeassp.2020.138.145\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"American Journal of Engineering and Applied Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3844/ajeassp.2020.138.145","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

约旦哈希姆王国的社会经济政策旨在加强关系承包模式之一的公私伙伴关系(PPP),以鼓励投资,改善公共服务,升级基础设施并增加财政资源,符合约旦2025年愿景(市政事务部,2014年)。为了实现这一愿景,建筑行业本身有5%的增长计划,然而,它遇到了许多困难。本文旨在突出对项目产生重大影响的主要问题之一(即合同模式的错误选择),并创建一个实用的项目管理工具,以支持约旦项目概念阶段的决策过程。项目背景(内部和外部因素)与承包模式的不同部分相关联;合同形式、补偿形式和合作形式(见图1)。目的是找出承包模式中每个部分中每个因素之间的关系。因此,确定所有这些关系如何影响业主和承包商之间选择合作形式的过程。对在约旦建筑部门具有关系承包实际经验的各方进行了半结构化访谈。这项研究的主要发现导致了一个项目管理工具的创建,该工具支持约旦项目概念阶段关于关系合同的决策过程。这些发现表明,在关键资源、关键资源、交货时间和不确定性的背景下,关系合同是复杂项目的正确选择。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Relational Contracting in the Building Sector in Jordan as a Substitute to Conventional Formal Methods
The socioeconomic policies within the Hashemite Kingdom of Jordan aim to enhance the Public-Private Partnership (PPP), one of the Relational Contracting models, to encourage investment, improve public services, upgrade infrastructure and boost financial resources, in line with Jordan 2025 Vision (Ministry of Municipal Affairs, 2014). The construction sector itself has a growth plan of 5% in order to meet this vision, however, it suffers many difficulties. This paper aims to highlight one of the main problems (i.e., wrong choice of the contracting model) that causes a significant effect on the project as well as create a practical project management tool that supports the decision-making process at the concept stage of projects in Jordan. The project context (internal and external factors) has been linked to different parts of the contracting model; contract forms, compensation forms and co-operation forms “Fig. 1”. The aim is to find the relationship between each factor within every part of the contracting model. Consequently, identify how all these relationships could affect the process of selecting the cooperation form, between the owner and the contractor(s). Semi-structured interviews with parties who have actual experience with relational contracting in the Jordanian construction sector have been conducted. The main findings of this research led to the creation of a project management tool that supports the decision-making process at the concept stage of projects in Jordan, regarding relational contracting. These findings suggest that relational contracting is the right choice for complex projects within the context of critical resources, critical resources and lead-time and uncertainties.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Integration of Cyber-Physical Systems, Digital Twins and 3D Printing in Advanced Manufacturing: A Synergistic Approach Optoelectronic Characterisation of Silicon and CIGS Photovoltaic Solar Cells Identification of the Presence of the "Swollen Shoot" Disease in Endemic Areas in Côte d'Ivoire Via Convolutional Neural Networks Bi-Stable Vibration Power Generation System Using Electromagnetic Motor and Efficiency Improvement by Stochastic Resonance A Classical Design Approach of Cascaded Controllers for a Traction Elevator
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1