{"title":"以终为始:更确定的领域发展","authors":"D. McLachlan, J. Isherwood, Max Peile","doi":"10.4043/29804-ms","DOIUrl":null,"url":null,"abstract":"\n An industry study published by the Independent Project Analysis group in 2012 reported that 78% of upstream projects in 2011 faced either cost or schedule overruns (Merrow, 2012). A similar report, published by EY in 2014, found 64% of projects faced cost overruns and 73% of projects faced schedule overruns (EY, 2014). Similarly, in 2017, the UK Oil & Gas Authority (OGA) published a study of lessons learned from UKCS oil & gas projects between 2011-2016, which reported \"since 2011 fewer than 25% of oil and gas projects have been delivered on time with projects averaging 10 months' delay and coming in around 35% over budget.\" (OGA, 2017) This level of cost and schedule underperformance was not sustainable in the high oil price economic environment and is inconceivable in the lower oil price environment in which we now operate. We cannot continue to make the same mistakes, the need to learn is no more critical than in the deepwater arena: Wood McKenzie report the cost of developing a deepwater project has fallen by more than 50% since 2013 (Offshore, 2018), the increased investment in deepwater is likely to drive an upturn in cyclical costs meaning developments become increasingly marginal and unable to sustain overruns or delays and remain economic.","PeriodicalId":11089,"journal":{"name":"Day 2 Wed, October 30, 2019","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-10-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Starting with the End in Mind: More Certain Field Development\",\"authors\":\"D. McLachlan, J. Isherwood, Max Peile\",\"doi\":\"10.4043/29804-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n An industry study published by the Independent Project Analysis group in 2012 reported that 78% of upstream projects in 2011 faced either cost or schedule overruns (Merrow, 2012). A similar report, published by EY in 2014, found 64% of projects faced cost overruns and 73% of projects faced schedule overruns (EY, 2014). Similarly, in 2017, the UK Oil & Gas Authority (OGA) published a study of lessons learned from UKCS oil & gas projects between 2011-2016, which reported \\\"since 2011 fewer than 25% of oil and gas projects have been delivered on time with projects averaging 10 months' delay and coming in around 35% over budget.\\\" (OGA, 2017) This level of cost and schedule underperformance was not sustainable in the high oil price economic environment and is inconceivable in the lower oil price environment in which we now operate. We cannot continue to make the same mistakes, the need to learn is no more critical than in the deepwater arena: Wood McKenzie report the cost of developing a deepwater project has fallen by more than 50% since 2013 (Offshore, 2018), the increased investment in deepwater is likely to drive an upturn in cyclical costs meaning developments become increasingly marginal and unable to sustain overruns or delays and remain economic.\",\"PeriodicalId\":11089,\"journal\":{\"name\":\"Day 2 Wed, October 30, 2019\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-10-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Wed, October 30, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4043/29804-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, October 30, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/29804-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

独立项目分析小组在2012年发布的一项行业研究报告称,2011年78%的上游项目面临成本或进度超支的问题(Merrow, 2012)。安永2014年发布的一份类似报告发现,64%的项目面临成本超支,73%的项目面临进度超支(安永,2014年)。同样,2017年,英国石油和天然气管理局(OGA)发布了一份研究报告,总结了2011年至2016年间英国油气项目的经验教训,报告称:“自2011年以来,只有不到25%的油气项目按时交付,项目平均延迟10个月,超出预算约35%。”(OGA, 2017)在高油价的经济环境中,这种成本和进度表现不佳的水平是不可持续的,在我们现在运营的低油价环境中是不可想象的。我们不能再犯同样的错误,学习的必要性并不比在深水领域更重要:Wood McKenzie报告称,自2013年以来,深水项目的开发成本下降了50%以上(Offshore, 2018),深水项目投资的增加可能会推动周期性成本的上升,这意味着开发变得越来越边缘化,无法维持超支或延迟,同时保持经济效益。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Starting with the End in Mind: More Certain Field Development
An industry study published by the Independent Project Analysis group in 2012 reported that 78% of upstream projects in 2011 faced either cost or schedule overruns (Merrow, 2012). A similar report, published by EY in 2014, found 64% of projects faced cost overruns and 73% of projects faced schedule overruns (EY, 2014). Similarly, in 2017, the UK Oil & Gas Authority (OGA) published a study of lessons learned from UKCS oil & gas projects between 2011-2016, which reported "since 2011 fewer than 25% of oil and gas projects have been delivered on time with projects averaging 10 months' delay and coming in around 35% over budget." (OGA, 2017) This level of cost and schedule underperformance was not sustainable in the high oil price economic environment and is inconceivable in the lower oil price environment in which we now operate. We cannot continue to make the same mistakes, the need to learn is no more critical than in the deepwater arena: Wood McKenzie report the cost of developing a deepwater project has fallen by more than 50% since 2013 (Offshore, 2018), the increased investment in deepwater is likely to drive an upturn in cyclical costs meaning developments become increasingly marginal and unable to sustain overruns or delays and remain economic.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Territorial differentiation of the language situation in Sumy region as a factor of formation of regional identity Barrier-free tourism as a means of physical recreation for persons with disabilities on the example of the developed active tour «Conquering diseases» Causes and consequences of external labor migration in Ukraine (on the example of Ivano-Frankivsk region) Visibility analysis of the urbanistic environmet as a constituent of the urbogeosystems approach Possibilities of using tourist and recreational potential in the conditions of decentralization (on the example of UTC of Volyn region)
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1