{"title":"探讨印度建设项目安全风险有效评估的障碍","authors":"V. Chellappa, U. Salve","doi":"10.1680/jmapl.22.00053","DOIUrl":null,"url":null,"abstract":"Risk assessment (RA) is a critical process that can help avoid costly incidents. However, RA is usually undertaken incorrectly due to a lack of construction experience. This study aimed to understand the challenges that users face during RA and users’ viewpoints to improve RA quality in the Indian construction sector. A mixed-methods approach was adopted to elicit the perspectives of safety heads (users) participating in Indian construction projects. The result shows that the users faced six challenges during RA including identifying significant hazards and steps involved in each activity, and selecting control measures. The users’ requirements were gathered to facilitate future RA processes. As a guide, the results of this study can be used by construction organizations to make an informed RA method.","PeriodicalId":44163,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","volume":null,"pages":null},"PeriodicalIF":1.3000,"publicationDate":"2023-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Exploring barriers to effective safety risk assessment on Indian construction projects\",\"authors\":\"V. Chellappa, U. Salve\",\"doi\":\"10.1680/jmapl.22.00053\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Risk assessment (RA) is a critical process that can help avoid costly incidents. However, RA is usually undertaken incorrectly due to a lack of construction experience. This study aimed to understand the challenges that users face during RA and users’ viewpoints to improve RA quality in the Indian construction sector. A mixed-methods approach was adopted to elicit the perspectives of safety heads (users) participating in Indian construction projects. The result shows that the users faced six challenges during RA including identifying significant hazards and steps involved in each activity, and selecting control measures. The users’ requirements were gathered to facilitate future RA processes. As a guide, the results of this study can be used by construction organizations to make an informed RA method.\",\"PeriodicalId\":44163,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Management Procurement and Law\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.3000,\"publicationDate\":\"2023-03-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Management Procurement and Law\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/jmapl.22.00053\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Management Procurement and Law","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jmapl.22.00053","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
Exploring barriers to effective safety risk assessment on Indian construction projects
Risk assessment (RA) is a critical process that can help avoid costly incidents. However, RA is usually undertaken incorrectly due to a lack of construction experience. This study aimed to understand the challenges that users face during RA and users’ viewpoints to improve RA quality in the Indian construction sector. A mixed-methods approach was adopted to elicit the perspectives of safety heads (users) participating in Indian construction projects. The result shows that the users faced six challenges during RA including identifying significant hazards and steps involved in each activity, and selecting control measures. The users’ requirements were gathered to facilitate future RA processes. As a guide, the results of this study can be used by construction organizations to make an informed RA method.