V. Gusakov, A. Korolev, R. Yagudin, V. V. Bokarev, P.I. Baturin, A. Telin
{"title":"多重并发症条件下的井沉默技术","authors":"V. Gusakov, A. Korolev, R. Yagudin, V. V. Bokarev, P.I. Baturin, A. Telin","doi":"10.17122/ngdelo-2023-2-17-24","DOIUrl":null,"url":null,"abstract":"Silencing of wells in the conditions of the Jurassic facilities developed by «Kharampurneftegaz» LLC is complicated by a number of negative factors, such as low permeability of the hydrophilic reservoir collector, high gas factor, low reservoir pressure, which significantly reduce the success of underground repair of wells (URW). To eliminate the influence of these complications in URW, an approach to silencing technology has been developed, which consists in combining several types of technological fluids, which, when used together, can eliminate the risks of reducing the production potential of wells after repair. So, to prevent gas manifestations during the URW, a blocking liquid based on the polymer «Biopol» and surfactant (gas-blocking compound, GasoBC) has been developed, acting due to its viscoelastic properties (polymer) and foaming ability in contact with gas (surfactant). A buffer liquid designed to prevent swelling of clay cement, reduce interfacial tension and restore phase permeability in oil was developed on the basis of a 6% HCl solution with the addition of a surfactanthydrophobizer (buffer hydrochloric acid liquid, BufHA). Blocking silencing compound (BSС) based on a Biopol polymer solution with a suspended suspension of microcalcite (BSС-microcalcite) and halite (BSС-halite) allows to prevent the absorption of silencing fluid at reduced reservoir pressure in wells with hydraulic fracturing. \nPilot field testing of the technology of silencing wells with multiple complications was carried out at 23 wells, where GasoBС block packs were used 21 times, BufHA — 9 times, BSC-halite and BSC-microcalcite — 14 and 9 times, respectively. \n8 typical silencing plans have been compiled for various parameters of wells. The results of research and development works are fixed in the Instructions of «Kharampurneftegaz» LLC on the topic «Selection of blocking silencing compounds during well repair».","PeriodicalId":9748,"journal":{"name":"Chemical and Petroleum Engineering","volume":"174 1","pages":""},"PeriodicalIF":0.3000,"publicationDate":"2023-05-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"WELL SILENCING TECHNOLOGIES IN CONDITIONS OF MULTIPLE COMPLICATIONS\",\"authors\":\"V. Gusakov, A. Korolev, R. Yagudin, V. V. Bokarev, P.I. Baturin, A. Telin\",\"doi\":\"10.17122/ngdelo-2023-2-17-24\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Silencing of wells in the conditions of the Jurassic facilities developed by «Kharampurneftegaz» LLC is complicated by a number of negative factors, such as low permeability of the hydrophilic reservoir collector, high gas factor, low reservoir pressure, which significantly reduce the success of underground repair of wells (URW). To eliminate the influence of these complications in URW, an approach to silencing technology has been developed, which consists in combining several types of technological fluids, which, when used together, can eliminate the risks of reducing the production potential of wells after repair. So, to prevent gas manifestations during the URW, a blocking liquid based on the polymer «Biopol» and surfactant (gas-blocking compound, GasoBC) has been developed, acting due to its viscoelastic properties (polymer) and foaming ability in contact with gas (surfactant). A buffer liquid designed to prevent swelling of clay cement, reduce interfacial tension and restore phase permeability in oil was developed on the basis of a 6% HCl solution with the addition of a surfactanthydrophobizer (buffer hydrochloric acid liquid, BufHA). Blocking silencing compound (BSС) based on a Biopol polymer solution with a suspended suspension of microcalcite (BSС-microcalcite) and halite (BSС-halite) allows to prevent the absorption of silencing fluid at reduced reservoir pressure in wells with hydraulic fracturing. \\nPilot field testing of the technology of silencing wells with multiple complications was carried out at 23 wells, where GasoBС block packs were used 21 times, BufHA — 9 times, BSC-halite and BSC-microcalcite — 14 and 9 times, respectively. \\n8 typical silencing plans have been compiled for various parameters of wells. The results of research and development works are fixed in the Instructions of «Kharampurneftegaz» LLC on the topic «Selection of blocking silencing compounds during well repair».\",\"PeriodicalId\":9748,\"journal\":{\"name\":\"Chemical and Petroleum Engineering\",\"volume\":\"174 1\",\"pages\":\"\"},\"PeriodicalIF\":0.3000,\"publicationDate\":\"2023-05-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Chemical and Petroleum Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17122/ngdelo-2023-2-17-24\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, CHEMICAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Chemical and Petroleum Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17122/ngdelo-2023-2-17-24","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, CHEMICAL","Score":null,"Total":0}
WELL SILENCING TECHNOLOGIES IN CONDITIONS OF MULTIPLE COMPLICATIONS
Silencing of wells in the conditions of the Jurassic facilities developed by «Kharampurneftegaz» LLC is complicated by a number of negative factors, such as low permeability of the hydrophilic reservoir collector, high gas factor, low reservoir pressure, which significantly reduce the success of underground repair of wells (URW). To eliminate the influence of these complications in URW, an approach to silencing technology has been developed, which consists in combining several types of technological fluids, which, when used together, can eliminate the risks of reducing the production potential of wells after repair. So, to prevent gas manifestations during the URW, a blocking liquid based on the polymer «Biopol» and surfactant (gas-blocking compound, GasoBC) has been developed, acting due to its viscoelastic properties (polymer) and foaming ability in contact with gas (surfactant). A buffer liquid designed to prevent swelling of clay cement, reduce interfacial tension and restore phase permeability in oil was developed on the basis of a 6% HCl solution with the addition of a surfactanthydrophobizer (buffer hydrochloric acid liquid, BufHA). Blocking silencing compound (BSС) based on a Biopol polymer solution with a suspended suspension of microcalcite (BSС-microcalcite) and halite (BSС-halite) allows to prevent the absorption of silencing fluid at reduced reservoir pressure in wells with hydraulic fracturing.
Pilot field testing of the technology of silencing wells with multiple complications was carried out at 23 wells, where GasoBС block packs were used 21 times, BufHA — 9 times, BSC-halite and BSC-microcalcite — 14 and 9 times, respectively.
8 typical silencing plans have been compiled for various parameters of wells. The results of research and development works are fixed in the Instructions of «Kharampurneftegaz» LLC on the topic «Selection of blocking silencing compounds during well repair».
期刊介绍:
Chemical and Petroleum Engineering publishes the latest research on Russian innovations in the field. Articles discuss developments in machinery and equipment, construction and design, processes, materials and corrosion control, and equipment-manufacturing technology. Chemical and Petroleum Engineering is a translation of the Russian journal Khimicheskoe i Neftegazovoe Mashinostroenie. The Russian Volume Year is published in English from April. All articles are peer-reviewed.