地质不确定条件下采石场长期生产调度优化

Trong Vu, T. Bao, C. Drebenstedt, H. Pham, Hoai-Quoc-Trung Nguyen, Duc Nguyen
{"title":"地质不确定条件下采石场长期生产调度优化","authors":"Trong Vu, T. Bao, C. Drebenstedt, H. Pham, Hoai-Quoc-Trung Nguyen, Duc Nguyen","doi":"10.1080/25726668.2021.1894398","DOIUrl":null,"url":null,"abstract":"ABSTRACT The success of a cement production project depends on the supply of raw materials. Long-term quarry production scheduling (LTQPS) based on resource models is essential to maintain a consistent supply to cement plants. Geological uncertainty is inherent due to sparse exploration data in resource models and significant risk factors for not achieving production targets. This research proposes a stochastic framework for LTQPS that considers the impact of geological uncertainty on raw material supply. A clustering algorithm uses multiple simulated deposit models to aggregate blocks into mining cuts. A new stochastic mixed-integer programming model is formulated with two objectives: to minimise the cost for developing the raw mix and the risk of not meeting production targets. The proposed framework is implemented successfully in a limestone deposit in Southern Vietnam, resulting in an increase of 5 million tons (Mt) and a 30% reduction in unit cost over the deterministic mixed-integer programming model.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"113 1","pages":"146 - 158"},"PeriodicalIF":1.8000,"publicationDate":"2021-03-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Optimisation of long-term quarry production scheduling under geological uncertainty to supply raw materials to a cement plant\",\"authors\":\"Trong Vu, T. Bao, C. Drebenstedt, H. Pham, Hoai-Quoc-Trung Nguyen, Duc Nguyen\",\"doi\":\"10.1080/25726668.2021.1894398\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT The success of a cement production project depends on the supply of raw materials. Long-term quarry production scheduling (LTQPS) based on resource models is essential to maintain a consistent supply to cement plants. Geological uncertainty is inherent due to sparse exploration data in resource models and significant risk factors for not achieving production targets. This research proposes a stochastic framework for LTQPS that considers the impact of geological uncertainty on raw material supply. A clustering algorithm uses multiple simulated deposit models to aggregate blocks into mining cuts. A new stochastic mixed-integer programming model is formulated with two objectives: to minimise the cost for developing the raw mix and the risk of not meeting production targets. The proposed framework is implemented successfully in a limestone deposit in Southern Vietnam, resulting in an increase of 5 million tons (Mt) and a 30% reduction in unit cost over the deterministic mixed-integer programming model.\",\"PeriodicalId\":44166,\"journal\":{\"name\":\"Mining Technology-Transactions of the Institutions of Mining and Metallurgy\",\"volume\":\"113 1\",\"pages\":\"146 - 158\"},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2021-03-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mining Technology-Transactions of the Institutions of Mining and Metallurgy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/25726668.2021.1894398\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MINING & MINERAL PROCESSING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/25726668.2021.1894398","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 2

摘要

水泥生产项目的成功与否取决于原材料的供应。基于资源模型的采石场长期生产调度(LTQPS)是保证水泥厂稳定供应的关键。由于资源模型中勘探数据的稀疏性和未实现生产目标的重大风险因素,地质不确定性是固有的。本研究提出了一个考虑地质不确定性对原材料供应影响的LTQPS随机框架。聚类算法使用多个模拟矿床模型将区块聚集成采矿切口。建立了一种新的随机混合整数规划模型,该模型具有两个目标:使原料混合料的开发成本最小化和不满足生产目标的风险最小化。所提出的框架在越南南部的石灰岩矿床中成功实施,与确定性混合整数规划模型相比,增加了500万吨(Mt),单位成本降低了30%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Optimisation of long-term quarry production scheduling under geological uncertainty to supply raw materials to a cement plant
ABSTRACT The success of a cement production project depends on the supply of raw materials. Long-term quarry production scheduling (LTQPS) based on resource models is essential to maintain a consistent supply to cement plants. Geological uncertainty is inherent due to sparse exploration data in resource models and significant risk factors for not achieving production targets. This research proposes a stochastic framework for LTQPS that considers the impact of geological uncertainty on raw material supply. A clustering algorithm uses multiple simulated deposit models to aggregate blocks into mining cuts. A new stochastic mixed-integer programming model is formulated with two objectives: to minimise the cost for developing the raw mix and the risk of not meeting production targets. The proposed framework is implemented successfully in a limestone deposit in Southern Vietnam, resulting in an increase of 5 million tons (Mt) and a 30% reduction in unit cost over the deterministic mixed-integer programming model.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
2.20
自引率
9.10%
发文量
5
期刊最新文献
Digital twins in the minerals industry – a comprehensive review Mining Metaverse – a future collaborative tool for best practice mining Reliability evaluation of CAN-bus connectors with tailored testing Sustainable open pit fleet management system: integrating economic and environmental objectives into truck allocation A Genetic algorithm scheme for large scale open-pit mine production scheduling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1