T. Bourgault , E. Vinner , J.-P. Darchis , C. Arfi , M. Boutry
{"title":"在里尔大学未来的生物中心设立计量单位的问题","authors":"T. Bourgault , E. Vinner , J.-P. Darchis , C. Arfi , M. Boutry","doi":"10.1016/j.rbmret.2006.08.001","DOIUrl":null,"url":null,"abstract":"<div><p>Regional and University Hospitals of Lille holds many of analysis laboratories with a great diversity of biology specialities. To date, a great biology center is building to accommodate there all these laboratories at the beginning of 2007. In this biology center, a room of metrology is foreseen where will be carried out the update of the metrological checks on the equipment concerned and the metrological traceability. The analysis laboratories of medical biology must have a perfect control of their equipment within the framework of the analytical process in order to ensure the quality of their results. This first work is a reflection on the failures of the metrology function within the laboratories from the biomedical point of view. Finally, the objective will be to provide to the laboratories of a coherent and homogeneous metrology tool to all the specialities of the biology of the CHRU of Lille to the service of their quality assurance.</p></div>","PeriodicalId":100733,"journal":{"name":"ITBM-RBM","volume":"27 5","pages":"Pages 257-261"},"PeriodicalIF":0.0000,"publicationDate":"2006-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/j.rbmret.2006.08.001","citationCount":"1","resultStr":"{\"title\":\"Problématique de la mise en place d'une unité de métrologie dans le futur centre de biologie du CHRU de Lille\",\"authors\":\"T. Bourgault , E. Vinner , J.-P. Darchis , C. Arfi , M. Boutry\",\"doi\":\"10.1016/j.rbmret.2006.08.001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>Regional and University Hospitals of Lille holds many of analysis laboratories with a great diversity of biology specialities. To date, a great biology center is building to accommodate there all these laboratories at the beginning of 2007. In this biology center, a room of metrology is foreseen where will be carried out the update of the metrological checks on the equipment concerned and the metrological traceability. The analysis laboratories of medical biology must have a perfect control of their equipment within the framework of the analytical process in order to ensure the quality of their results. This first work is a reflection on the failures of the metrology function within the laboratories from the biomedical point of view. Finally, the objective will be to provide to the laboratories of a coherent and homogeneous metrology tool to all the specialities of the biology of the CHRU of Lille to the service of their quality assurance.</p></div>\",\"PeriodicalId\":100733,\"journal\":{\"name\":\"ITBM-RBM\",\"volume\":\"27 5\",\"pages\":\"Pages 257-261\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/j.rbmret.2006.08.001\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ITBM-RBM\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S1297956206001069\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ITBM-RBM","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S1297956206001069","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Problématique de la mise en place d'une unité de métrologie dans le futur centre de biologie du CHRU de Lille
Regional and University Hospitals of Lille holds many of analysis laboratories with a great diversity of biology specialities. To date, a great biology center is building to accommodate there all these laboratories at the beginning of 2007. In this biology center, a room of metrology is foreseen where will be carried out the update of the metrological checks on the equipment concerned and the metrological traceability. The analysis laboratories of medical biology must have a perfect control of their equipment within the framework of the analytical process in order to ensure the quality of their results. This first work is a reflection on the failures of the metrology function within the laboratories from the biomedical point of view. Finally, the objective will be to provide to the laboratories of a coherent and homogeneous metrology tool to all the specialities of the biology of the CHRU of Lille to the service of their quality assurance.