{"title":"好井是增产措施的最佳选择","authors":"A. R. Jennings","doi":"10.2118/19738-PA","DOIUrl":null,"url":null,"abstract":"When such factors as well response, return on stimulation costs, well cleanup, and sustained productivity are considered, it often becomes apparent that good wells are viable candidates for well stimulation. This paper discusses critical factors related to well-stimulation success, emphasizes that good wells possess the majority of these characteristics, and illustrates technical points with case histories.","PeriodicalId":22020,"journal":{"name":"Spe Production Engineering","volume":"23 1","pages":"371-376"},"PeriodicalIF":0.0000,"publicationDate":"1991-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Good wells make the best candidates for well stimulation\",\"authors\":\"A. R. Jennings\",\"doi\":\"10.2118/19738-PA\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"When such factors as well response, return on stimulation costs, well cleanup, and sustained productivity are considered, it often becomes apparent that good wells are viable candidates for well stimulation. This paper discusses critical factors related to well-stimulation success, emphasizes that good wells possess the majority of these characteristics, and illustrates technical points with case histories.\",\"PeriodicalId\":22020,\"journal\":{\"name\":\"Spe Production Engineering\",\"volume\":\"23 1\",\"pages\":\"371-376\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Spe Production Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/19738-PA\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spe Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/19738-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Good wells make the best candidates for well stimulation
When such factors as well response, return on stimulation costs, well cleanup, and sustained productivity are considered, it often becomes apparent that good wells are viable candidates for well stimulation. This paper discusses critical factors related to well-stimulation success, emphasizes that good wells possess the majority of these characteristics, and illustrates technical points with case histories.