东非电力联营(EAPP)的异步互联

M. Musau, N. Odero, C. Wekesa
{"title":"东非电力联营(EAPP)的异步互联","authors":"M. Musau, N. Odero, C. Wekesa","doi":"10.1109/POWERAFRICA.2017.7991191","DOIUrl":null,"url":null,"abstract":"East Africa Power Pool (EAPP) is a proposed regional interconnection for centralizing energy resources and facilitating power wheeling between the Eastern Africa geographical areas. Synchronous tie lines have been used in the established interconnections so far. However, asynchronous interconnection is preferred since there high Renewable Energy (RE) penetration in the EAPP. HVDC technology, particularly multi terminal DC (MTDC) is a good example of such links as it provides loose coupling between the interconnected power systems. This has several economic, environmental and security-stability merits as compared to the traditional HVAC tie lines. The Kenya-Ethiopia HVDC Bipolar is supposed to provide a loose coupling between the two countries. The same technology can be reproduced in the EAPP so as to achieve a dynamic regional interconnection. Thus, a 10-Area system with 18 MTDC tie lines is considered where each area represents a Transmission System Operator (TSO) for each country. In this paper, a multi area multi objective economic dispatch (MAMODED) with RE and Emissions is formulated where MTDC constraints have been included for the first time in the EAPP. Review of EAPP and MAMODED with RE, merits of MTDC interconnection, RE penetration in EAPP, and MTDC tie line power flows are also presented.","PeriodicalId":6601,"journal":{"name":"2017 IEEE PES PowerAfrica","volume":"12 1","pages":"7-11"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Asynchronous interconnection of the proposed East Africa Power Pool (EAPP)\",\"authors\":\"M. Musau, N. Odero, C. Wekesa\",\"doi\":\"10.1109/POWERAFRICA.2017.7991191\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"East Africa Power Pool (EAPP) is a proposed regional interconnection for centralizing energy resources and facilitating power wheeling between the Eastern Africa geographical areas. Synchronous tie lines have been used in the established interconnections so far. However, asynchronous interconnection is preferred since there high Renewable Energy (RE) penetration in the EAPP. HVDC technology, particularly multi terminal DC (MTDC) is a good example of such links as it provides loose coupling between the interconnected power systems. This has several economic, environmental and security-stability merits as compared to the traditional HVAC tie lines. The Kenya-Ethiopia HVDC Bipolar is supposed to provide a loose coupling between the two countries. The same technology can be reproduced in the EAPP so as to achieve a dynamic regional interconnection. Thus, a 10-Area system with 18 MTDC tie lines is considered where each area represents a Transmission System Operator (TSO) for each country. In this paper, a multi area multi objective economic dispatch (MAMODED) with RE and Emissions is formulated where MTDC constraints have been included for the first time in the EAPP. Review of EAPP and MAMODED with RE, merits of MTDC interconnection, RE penetration in EAPP, and MTDC tie line power flows are also presented.\",\"PeriodicalId\":6601,\"journal\":{\"name\":\"2017 IEEE PES PowerAfrica\",\"volume\":\"12 1\",\"pages\":\"7-11\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-06-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 IEEE PES PowerAfrica\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/POWERAFRICA.2017.7991191\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE PES PowerAfrica","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/POWERAFRICA.2017.7991191","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

东非电力联营(East Africa Power Pool, EAPP)是为实现东非地区能源集中和电力轮转而提出的区域互联。到目前为止,在已建立的互连中使用的是同步拉线。然而,异步互联是首选,因为EAPP中可再生能源(RE)的渗透率很高。高压直流技术,特别是多终端直流(MTDC)是这种链路的一个很好的例子,因为它提供了互联电力系统之间的松耦合。与传统的暖通空调连接线路相比,这具有几个经济,环境和安全稳定的优点。肯尼亚-埃塞俄比亚HVDC双极本应在两国之间提供一个松散耦合。同样的技术可以在EAPP中复制,从而实现动态的区域互联。因此,考虑一个具有18条MTDC联络线的10区系统,其中每个区域代表每个国家的传输系统运营商(TSO)。本文首次将MTDC约束纳入到EAPP中,提出了一个考虑可再生能源和排放的多区域多目标经济调度(MAMODED)。综述了EAPP和带RE的MAMODED、MTDC互连的优点、EAPP中的RE渗透以及MTDC并线潮流。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Asynchronous interconnection of the proposed East Africa Power Pool (EAPP)
East Africa Power Pool (EAPP) is a proposed regional interconnection for centralizing energy resources and facilitating power wheeling between the Eastern Africa geographical areas. Synchronous tie lines have been used in the established interconnections so far. However, asynchronous interconnection is preferred since there high Renewable Energy (RE) penetration in the EAPP. HVDC technology, particularly multi terminal DC (MTDC) is a good example of such links as it provides loose coupling between the interconnected power systems. This has several economic, environmental and security-stability merits as compared to the traditional HVAC tie lines. The Kenya-Ethiopia HVDC Bipolar is supposed to provide a loose coupling between the two countries. The same technology can be reproduced in the EAPP so as to achieve a dynamic regional interconnection. Thus, a 10-Area system with 18 MTDC tie lines is considered where each area represents a Transmission System Operator (TSO) for each country. In this paper, a multi area multi objective economic dispatch (MAMODED) with RE and Emissions is formulated where MTDC constraints have been included for the first time in the EAPP. Review of EAPP and MAMODED with RE, merits of MTDC interconnection, RE penetration in EAPP, and MTDC tie line power flows are also presented.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Optimized network planning of mini-grids for the rural electrification of developing countries Application of statistical tools in power transformer FRA results interpretation: Transformer winding diagnosis based on frequency response analysis An algorithm for micro-load shedding in generation constrained electricity distribution network Asynchronous interconnection of the proposed East Africa Power Pool (EAPP) Impact of large scale grid-connected wind generators on the power system network
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1