气井压井作业的挑战,重点是储层和完井完整性问题

Z. Ahmad, Abdullah Alhaj Al Hosini, Mohammed Ibrahim Al Janahi, Abdulla Mohammed Al Marzouqi, M. A. Siddiqui, Abdulla Haidar Abdulla Al Zarouni, Saad Ansari
{"title":"气井压井作业的挑战,重点是储层和完井完整性问题","authors":"Z. Ahmad, Abdullah Alhaj Al Hosini, Mohammed Ibrahim Al Janahi, Abdulla Mohammed Al Marzouqi, M. A. Siddiqui, Abdulla Haidar Abdulla Al Zarouni, Saad Ansari","doi":"10.2118/208063-ms","DOIUrl":null,"url":null,"abstract":"\n Well killing always remains a most radical part during the life cycle of gas production wells with reservoir and completion integrity issues. In moderate permeability gas reservoirs, it will be more challenging due to below issues;\n Low pressure gas reservoir with moderate reservoir permeability where hydrostatic head of water is almost double the formation pressure\n Well with the sustainable annulus pressures (Production & first cemented annulus) Well with complex layered scale / asphalting deposition Completion jewelry component integrity breached Recycle reservoir with pressure maintenance\n Noise logs / corrosion logs generally conducted in order to assess the downhole completion jewelry and potential leak source prior any attempt for killing the well. To achieve the desired accessibility extensive scale analysis for better designing of scale clean out operation carried out specially to access the SPM. Variation of reservoir permeability considered for designing of optimized kill fluid for Depleted horizontal gas reservoir to cater challenge of complete losses. Effective fluid loss solutions designed and implemented to avoid abnormal fluid losses. Further more Polymer based gels used to kill and prevent the gas peculation to surface.\n Wells having completion and reservoir integrity issue isolated by considering cement zonal isolation, salt plugs, thru-tubing bridge plugs and nipple less plugs. All these barriers having their advantages and disadvantages with reference to work over objectives and their application limitations with respect to well conditions and detail study conducted for each candidate prior execution.\n Depletion Gas well killing and securing operation considered to be complex in nature and may result serious concern of rig intervention or well future objectives in case of improper execution. Gas wells having reservoir integrity issues and in case of 1st cemented Annulus pressure can be isolated by using thru-tubing bridge plugs. For retrieval of dummy from SPM must be done after setting of downhole plug to avoid any heavy suction for wire line operation. Cement plug operation is not suitable for such wells due to severe losses and fluid circulation limitation. Adequate selection of kill gel fluid as per reservoir characteristics will improve the killing efficiency.","PeriodicalId":10981,"journal":{"name":"Day 4 Thu, November 18, 2021","volume":"4 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Challenges of Gas Wells Killing Operation with Emphasis on Reservoir & Completion Integrity Issues\",\"authors\":\"Z. Ahmad, Abdullah Alhaj Al Hosini, Mohammed Ibrahim Al Janahi, Abdulla Mohammed Al Marzouqi, M. A. Siddiqui, Abdulla Haidar Abdulla Al Zarouni, Saad Ansari\",\"doi\":\"10.2118/208063-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Well killing always remains a most radical part during the life cycle of gas production wells with reservoir and completion integrity issues. In moderate permeability gas reservoirs, it will be more challenging due to below issues;\\n Low pressure gas reservoir with moderate reservoir permeability where hydrostatic head of water is almost double the formation pressure\\n Well with the sustainable annulus pressures (Production & first cemented annulus) Well with complex layered scale / asphalting deposition Completion jewelry component integrity breached Recycle reservoir with pressure maintenance\\n Noise logs / corrosion logs generally conducted in order to assess the downhole completion jewelry and potential leak source prior any attempt for killing the well. To achieve the desired accessibility extensive scale analysis for better designing of scale clean out operation carried out specially to access the SPM. Variation of reservoir permeability considered for designing of optimized kill fluid for Depleted horizontal gas reservoir to cater challenge of complete losses. Effective fluid loss solutions designed and implemented to avoid abnormal fluid losses. Further more Polymer based gels used to kill and prevent the gas peculation to surface.\\n Wells having completion and reservoir integrity issue isolated by considering cement zonal isolation, salt plugs, thru-tubing bridge plugs and nipple less plugs. All these barriers having their advantages and disadvantages with reference to work over objectives and their application limitations with respect to well conditions and detail study conducted for each candidate prior execution.\\n Depletion Gas well killing and securing operation considered to be complex in nature and may result serious concern of rig intervention or well future objectives in case of improper execution. Gas wells having reservoir integrity issues and in case of 1st cemented Annulus pressure can be isolated by using thru-tubing bridge plugs. For retrieval of dummy from SPM must be done after setting of downhole plug to avoid any heavy suction for wire line operation. Cement plug operation is not suitable for such wells due to severe losses and fluid circulation limitation. Adequate selection of kill gel fluid as per reservoir characteristics will improve the killing efficiency.\",\"PeriodicalId\":10981,\"journal\":{\"name\":\"Day 4 Thu, November 18, 2021\",\"volume\":\"4 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Thu, November 18, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/208063-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, November 18, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/208063-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

由于储层和完井完整性问题,压井一直是气井生命周期中最重要的环节。在中渗透气藏中,由于以下问题,将更具挑战性;具有中等渗透率的低压气藏,静水水头几乎是地层压力的两倍,具有可持续环空压力的井(生产和第一次胶结环空)具有复杂层状结垢/沥青沉积的井完井装饰组件完整性破坏,压力维持的循环储层通常进行噪音测井/腐蚀测井,以便在任何泄漏之前评估井下完井装饰和潜在的泄漏源企图压井。为了达到理想的可达性,对SPM的可达性进行了广泛的尺度分析,以便更好地设计尺度清理作业。考虑储层渗透率的变化,设计了衰竭水平气藏最佳压井液,以应对完全漏失的挑战。设计和实施有效的失液方案,避免异常失液。此外,聚合物基凝胶用于杀死和防止气体积聚到表面。对于存在完井和油藏完整性问题的井,可采用水泥层间隔离、盐塞、过油管桥塞和无节桥塞进行隔离。所有这些障碍都有各自的优点和缺点,涉及到工作目标、井况和每个候选井在执行前进行的详细研究。枯竭气井压井和安全作业本质上是复杂的,如果执行不当,可能会导致钻机干预或油井未来目标的严重问题。有储层完整性问题的气井,在第一次胶结环空压力的情况下,可以使用过油管桥塞进行隔离。从SPM中取出假人必须在井下桥塞坐封后进行,以避免在钢丝绳作业时产生较大的吸力。由于严重的漏失和流体循环限制,水泥塞作业不适合此类井。根据储层特征选择适当的压井凝胶液将提高压井效率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Challenges of Gas Wells Killing Operation with Emphasis on Reservoir & Completion Integrity Issues
Well killing always remains a most radical part during the life cycle of gas production wells with reservoir and completion integrity issues. In moderate permeability gas reservoirs, it will be more challenging due to below issues; Low pressure gas reservoir with moderate reservoir permeability where hydrostatic head of water is almost double the formation pressure Well with the sustainable annulus pressures (Production & first cemented annulus) Well with complex layered scale / asphalting deposition Completion jewelry component integrity breached Recycle reservoir with pressure maintenance Noise logs / corrosion logs generally conducted in order to assess the downhole completion jewelry and potential leak source prior any attempt for killing the well. To achieve the desired accessibility extensive scale analysis for better designing of scale clean out operation carried out specially to access the SPM. Variation of reservoir permeability considered for designing of optimized kill fluid for Depleted horizontal gas reservoir to cater challenge of complete losses. Effective fluid loss solutions designed and implemented to avoid abnormal fluid losses. Further more Polymer based gels used to kill and prevent the gas peculation to surface. Wells having completion and reservoir integrity issue isolated by considering cement zonal isolation, salt plugs, thru-tubing bridge plugs and nipple less plugs. All these barriers having their advantages and disadvantages with reference to work over objectives and their application limitations with respect to well conditions and detail study conducted for each candidate prior execution. Depletion Gas well killing and securing operation considered to be complex in nature and may result serious concern of rig intervention or well future objectives in case of improper execution. Gas wells having reservoir integrity issues and in case of 1st cemented Annulus pressure can be isolated by using thru-tubing bridge plugs. For retrieval of dummy from SPM must be done after setting of downhole plug to avoid any heavy suction for wire line operation. Cement plug operation is not suitable for such wells due to severe losses and fluid circulation limitation. Adequate selection of kill gel fluid as per reservoir characteristics will improve the killing efficiency.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Wellbore Cleanness Under Total Losses in Horizontal Wells: The Field Study Integrating Rock Typing Methods Including Empirical, Deterministic, Statistical, Probabilistic, Predictive Techniques and New Applications for Practical Reservoir Characterization Real Time Implementation of ESP Predictive Analytics - Towards Value Realization from Data Science The Use of 5G Technologies in the Digital Transformation of the Oil/Gas Industry Recent Case Histories of Multilateral Systems Enabling Thru Tubing Intervention in the Middle East
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1