双重正常运行时间减少策略、延迟、多次交付和返工对多产品制造运输问题的影响

IF 1.6 3区 工程技术 Q4 ENGINEERING, INDUSTRIAL International Journal of Industrial Engineering Computations Pub Date : 2023-01-01 DOI:10.5267/j.ijiec.2023.1.001
Yuan-Shyi Peter Chiu, Tingting Yan, S. Chiu, Hui-Chi Wang, Tiffany Chiu
{"title":"双重正常运行时间减少策略、延迟、多次交付和返工对多产品制造运输问题的影响","authors":"Yuan-Shyi Peter Chiu, Tingting Yan, S. Chiu, Hui-Chi Wang, Tiffany Chiu","doi":"10.5267/j.ijiec.2023.1.001","DOIUrl":null,"url":null,"abstract":"This study examines the joint impact of outsourcing, overtime, multi-delivery, rework, and postponement on a multiproduct fabrication problem. A growing/clear trend in today’s customer requirements turned into rapid response and desired quality of multi-merchandises and multiple fixed-amount deliveries in equal-interval time. To satisfy customers’ expectations, current manufacturing firms must effectively design/plan their multiproduct production scheme with minimum fabrication-inventory-shipping expenses and under confined capacity. Motivated by assisting manufacturing firms in making the right production decision, this study develops a decision-support delayed-differentiation model considering multi-shipment, rework, and dual uptime-reducing strategies (namely, overtime and outsourcing). Our delayed-differentiation model comprises stage one, which makes all common/standard parts of multi-end-merchandises, and stage two, which produces multiple end merchandise. For cutting making times, the study proposes subcontracting a portion of the common/standard part’s lot size and adopting overtime-making end merchandise in stage two. The screening and reworking tasks identify and repair faulty items to ensure customers’ desired quality. The finished lots of end merchandise are divided into a few equal-amount shipments and distributed to customers in equal-interval time. We employ mathematical derivation and optimization methodology to derive the annual expected fabrication- inventory-shipping expense and the cost-minimized production-shipping policy. A numerical demonstration is presented to exhibit our research scheme’s applicability and exposes the studied problem’s critical managerial insights, which help the management make beneficial decisions.","PeriodicalId":51356,"journal":{"name":"International Journal of Industrial Engineering Computations","volume":null,"pages":null},"PeriodicalIF":1.6000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Impact of dual uptime-reducing strategies, postponement, multi-delivery, and rework on a multiproduct fabrication-shipping problem\",\"authors\":\"Yuan-Shyi Peter Chiu, Tingting Yan, S. Chiu, Hui-Chi Wang, Tiffany Chiu\",\"doi\":\"10.5267/j.ijiec.2023.1.001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study examines the joint impact of outsourcing, overtime, multi-delivery, rework, and postponement on a multiproduct fabrication problem. A growing/clear trend in today’s customer requirements turned into rapid response and desired quality of multi-merchandises and multiple fixed-amount deliveries in equal-interval time. To satisfy customers’ expectations, current manufacturing firms must effectively design/plan their multiproduct production scheme with minimum fabrication-inventory-shipping expenses and under confined capacity. Motivated by assisting manufacturing firms in making the right production decision, this study develops a decision-support delayed-differentiation model considering multi-shipment, rework, and dual uptime-reducing strategies (namely, overtime and outsourcing). Our delayed-differentiation model comprises stage one, which makes all common/standard parts of multi-end-merchandises, and stage two, which produces multiple end merchandise. For cutting making times, the study proposes subcontracting a portion of the common/standard part’s lot size and adopting overtime-making end merchandise in stage two. The screening and reworking tasks identify and repair faulty items to ensure customers’ desired quality. The finished lots of end merchandise are divided into a few equal-amount shipments and distributed to customers in equal-interval time. We employ mathematical derivation and optimization methodology to derive the annual expected fabrication- inventory-shipping expense and the cost-minimized production-shipping policy. A numerical demonstration is presented to exhibit our research scheme’s applicability and exposes the studied problem’s critical managerial insights, which help the management make beneficial decisions.\",\"PeriodicalId\":51356,\"journal\":{\"name\":\"International Journal of Industrial Engineering Computations\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Industrial Engineering Computations\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5267/j.ijiec.2023.1.001\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering Computations","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5267/j.ijiec.2023.1.001","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

摘要

本研究考察了外包、加班、多次交付、返工和延期对多产品制造问题的共同影响。当今客户需求日益增长/明显的趋势转变为快速响应和期望的多商品质量,以及在等间隔时间内多次固定数量的交付。为了满足客户的期望,当前的制造企业必须有效地设计/规划他们的多产品生产方案,以最小的制造-库存-运输费用和有限的产能。以协助制造企业做出正确的生产决策为动机,本研究建立了考虑多出货、返工和双重减少正常运行时间策略(即加班和外包)的决策支持延迟差异化模型。我们的延迟差异化模型包括第一阶段,即制造多终端商品的所有通用/标准部件,以及第二阶段,即生产多终端商品。为了缩短制造时间,研究建议将一部分通用/标准零件的批量分包,并在第二阶段采用加班制最终产品。筛选和返工任务识别和修复有缺陷的项目,以确保客户期望的质量。将成品分成等量的几批,在等量的时间内分发给客户。采用数学推导和优化方法,推导出制造-库存-运输的年预期费用和成本最小化的生产-运输策略。通过数值演示展示了我们的研究方案的适用性,并揭示了所研究问题的关键管理见解,这有助于管理层做出有益的决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Impact of dual uptime-reducing strategies, postponement, multi-delivery, and rework on a multiproduct fabrication-shipping problem
This study examines the joint impact of outsourcing, overtime, multi-delivery, rework, and postponement on a multiproduct fabrication problem. A growing/clear trend in today’s customer requirements turned into rapid response and desired quality of multi-merchandises and multiple fixed-amount deliveries in equal-interval time. To satisfy customers’ expectations, current manufacturing firms must effectively design/plan their multiproduct production scheme with minimum fabrication-inventory-shipping expenses and under confined capacity. Motivated by assisting manufacturing firms in making the right production decision, this study develops a decision-support delayed-differentiation model considering multi-shipment, rework, and dual uptime-reducing strategies (namely, overtime and outsourcing). Our delayed-differentiation model comprises stage one, which makes all common/standard parts of multi-end-merchandises, and stage two, which produces multiple end merchandise. For cutting making times, the study proposes subcontracting a portion of the common/standard part’s lot size and adopting overtime-making end merchandise in stage two. The screening and reworking tasks identify and repair faulty items to ensure customers’ desired quality. The finished lots of end merchandise are divided into a few equal-amount shipments and distributed to customers in equal-interval time. We employ mathematical derivation and optimization methodology to derive the annual expected fabrication- inventory-shipping expense and the cost-minimized production-shipping policy. A numerical demonstration is presented to exhibit our research scheme’s applicability and exposes the studied problem’s critical managerial insights, which help the management make beneficial decisions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
5.70
自引率
9.10%
发文量
35
审稿时长
20 weeks
期刊最新文献
A unifying framework and a mathematical model for the Slab Stack Shuffling Problem Heuristics and metaheuristics to minimize makespan for flowshop with peak power consumption constraints Minimizing operating expenditures for a manufacturing system featuring quality reassurances, probabilistic failures, overtime, and outsourcing Composite heuristics and water wave optimality algorithms for tri-criteria multiple job classes and customer order scheduling on a single machine Investigating the collective impact of postponement, scrap, and external suppliers on multiproduct replenishing decision
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1