{"title":"双重正常运行时间减少策略、延迟、多次交付和返工对多产品制造运输问题的影响","authors":"Yuan-Shyi Peter Chiu, Tingting Yan, S. Chiu, Hui-Chi Wang, Tiffany Chiu","doi":"10.5267/j.ijiec.2023.1.001","DOIUrl":null,"url":null,"abstract":"This study examines the joint impact of outsourcing, overtime, multi-delivery, rework, and postponement on a multiproduct fabrication problem. A growing/clear trend in today’s customer requirements turned into rapid response and desired quality of multi-merchandises and multiple fixed-amount deliveries in equal-interval time. To satisfy customers’ expectations, current manufacturing firms must effectively design/plan their multiproduct production scheme with minimum fabrication-inventory-shipping expenses and under confined capacity. Motivated by assisting manufacturing firms in making the right production decision, this study develops a decision-support delayed-differentiation model considering multi-shipment, rework, and dual uptime-reducing strategies (namely, overtime and outsourcing). Our delayed-differentiation model comprises stage one, which makes all common/standard parts of multi-end-merchandises, and stage two, which produces multiple end merchandise. For cutting making times, the study proposes subcontracting a portion of the common/standard part’s lot size and adopting overtime-making end merchandise in stage two. The screening and reworking tasks identify and repair faulty items to ensure customers’ desired quality. The finished lots of end merchandise are divided into a few equal-amount shipments and distributed to customers in equal-interval time. We employ mathematical derivation and optimization methodology to derive the annual expected fabrication- inventory-shipping expense and the cost-minimized production-shipping policy. A numerical demonstration is presented to exhibit our research scheme’s applicability and exposes the studied problem’s critical managerial insights, which help the management make beneficial decisions.","PeriodicalId":51356,"journal":{"name":"International Journal of Industrial Engineering Computations","volume":null,"pages":null},"PeriodicalIF":1.6000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Impact of dual uptime-reducing strategies, postponement, multi-delivery, and rework on a multiproduct fabrication-shipping problem\",\"authors\":\"Yuan-Shyi Peter Chiu, Tingting Yan, S. Chiu, Hui-Chi Wang, Tiffany Chiu\",\"doi\":\"10.5267/j.ijiec.2023.1.001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study examines the joint impact of outsourcing, overtime, multi-delivery, rework, and postponement on a multiproduct fabrication problem. A growing/clear trend in today’s customer requirements turned into rapid response and desired quality of multi-merchandises and multiple fixed-amount deliveries in equal-interval time. To satisfy customers’ expectations, current manufacturing firms must effectively design/plan their multiproduct production scheme with minimum fabrication-inventory-shipping expenses and under confined capacity. Motivated by assisting manufacturing firms in making the right production decision, this study develops a decision-support delayed-differentiation model considering multi-shipment, rework, and dual uptime-reducing strategies (namely, overtime and outsourcing). Our delayed-differentiation model comprises stage one, which makes all common/standard parts of multi-end-merchandises, and stage two, which produces multiple end merchandise. For cutting making times, the study proposes subcontracting a portion of the common/standard part’s lot size and adopting overtime-making end merchandise in stage two. The screening and reworking tasks identify and repair faulty items to ensure customers’ desired quality. The finished lots of end merchandise are divided into a few equal-amount shipments and distributed to customers in equal-interval time. We employ mathematical derivation and optimization methodology to derive the annual expected fabrication- inventory-shipping expense and the cost-minimized production-shipping policy. A numerical demonstration is presented to exhibit our research scheme’s applicability and exposes the studied problem’s critical managerial insights, which help the management make beneficial decisions.\",\"PeriodicalId\":51356,\"journal\":{\"name\":\"International Journal of Industrial Engineering Computations\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Industrial Engineering Computations\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5267/j.ijiec.2023.1.001\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering Computations","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5267/j.ijiec.2023.1.001","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
Impact of dual uptime-reducing strategies, postponement, multi-delivery, and rework on a multiproduct fabrication-shipping problem
This study examines the joint impact of outsourcing, overtime, multi-delivery, rework, and postponement on a multiproduct fabrication problem. A growing/clear trend in today’s customer requirements turned into rapid response and desired quality of multi-merchandises and multiple fixed-amount deliveries in equal-interval time. To satisfy customers’ expectations, current manufacturing firms must effectively design/plan their multiproduct production scheme with minimum fabrication-inventory-shipping expenses and under confined capacity. Motivated by assisting manufacturing firms in making the right production decision, this study develops a decision-support delayed-differentiation model considering multi-shipment, rework, and dual uptime-reducing strategies (namely, overtime and outsourcing). Our delayed-differentiation model comprises stage one, which makes all common/standard parts of multi-end-merchandises, and stage two, which produces multiple end merchandise. For cutting making times, the study proposes subcontracting a portion of the common/standard part’s lot size and adopting overtime-making end merchandise in stage two. The screening and reworking tasks identify and repair faulty items to ensure customers’ desired quality. The finished lots of end merchandise are divided into a few equal-amount shipments and distributed to customers in equal-interval time. We employ mathematical derivation and optimization methodology to derive the annual expected fabrication- inventory-shipping expense and the cost-minimized production-shipping policy. A numerical demonstration is presented to exhibit our research scheme’s applicability and exposes the studied problem’s critical managerial insights, which help the management make beneficial decisions.