{"title":"Egina深水开发成功完成:一个团队共同努力制定新的绩效标准","authors":"C. Okpalla, V. Chaloupka, Romain Djenani, Victor Okengwu, T. Akinniyi, B. Orluwosu, Kenneth Johnson","doi":"10.2118/198869-MS","DOIUrl":null,"url":null,"abstract":"\n A service company was challenged to deliver best-in-class upper and lower completions by leveraging deep water completion experiences throughout West Africa with the operator and service company's global best practices and lessons learned. An operator reduced lower completion times, standalone screens, and openhole gravel packs by 60% between the 1st and 24th well while reducing upper completion times by 40% for the same wells. Well construction durations, including drilling and completion, currently averages 24 days per well, with lower and upper completion operating efficiencies and run reliabilities exceeding 97%.","PeriodicalId":11250,"journal":{"name":"Day 3 Wed, August 07, 2019","volume":"34 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Egina Deep Water Development Completion Success: One Team Working Together Setting New Performance Standards\",\"authors\":\"C. Okpalla, V. Chaloupka, Romain Djenani, Victor Okengwu, T. Akinniyi, B. Orluwosu, Kenneth Johnson\",\"doi\":\"10.2118/198869-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n A service company was challenged to deliver best-in-class upper and lower completions by leveraging deep water completion experiences throughout West Africa with the operator and service company's global best practices and lessons learned. An operator reduced lower completion times, standalone screens, and openhole gravel packs by 60% between the 1st and 24th well while reducing upper completion times by 40% for the same wells. Well construction durations, including drilling and completion, currently averages 24 days per well, with lower and upper completion operating efficiencies and run reliabilities exceeding 97%.\",\"PeriodicalId\":11250,\"journal\":{\"name\":\"Day 3 Wed, August 07, 2019\",\"volume\":\"34 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-08-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 3 Wed, August 07, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/198869-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, August 07, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/198869-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Egina Deep Water Development Completion Success: One Team Working Together Setting New Performance Standards
A service company was challenged to deliver best-in-class upper and lower completions by leveraging deep water completion experiences throughout West Africa with the operator and service company's global best practices and lessons learned. An operator reduced lower completion times, standalone screens, and openhole gravel packs by 60% between the 1st and 24th well while reducing upper completion times by 40% for the same wells. Well construction durations, including drilling and completion, currently averages 24 days per well, with lower and upper completion operating efficiencies and run reliabilities exceeding 97%.