{"title":"具有废品和最终产品多出货策略的混合延迟差异化多产品EPQ模型","authors":"Yuan-Shyi Peter Chiu, Ya-Lei Lo, Tsu-Ming Yeh, Yunsen Wang, Hung-Yi Chen","doi":"10.5267/j.ijiec.2022.11.002","DOIUrl":null,"url":null,"abstract":"The present work intends to optimize a hybrid delayed differentiation multiproduct economic production quantity-EPQ model with the scrap and end-products multi-shipment policy. Since the requirements of multi-goods have a standard part in common, our fabrication planning adopts a two-phase delayed differentiation strategy to make the standard components first and produce the finished multi-goods in the second phase. Implementing a partial subcontracting option (with the additional expense) for the standard parts helps us to expedite the required uptime in the first phase. A screening process identifies the faulty items that need to be removed to ensure the in-house production quality. A multi-shipment plan delivers the finished lot of end-products to clients in fixed time intervals. This study optimizes the overall operating expenses of this intra-supply chain system, including fabrication, delivery, and client stock holding, through our proposed modeling, formulation, and optimization procedure. In addition, this study gives a numerical demonstration of the obtained results’ applicability and usefulness to managerial decision-making.","PeriodicalId":51356,"journal":{"name":"International Journal of Industrial Engineering Computations","volume":"1 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A hybrid delayed differentiation multiproduct EPQ model with scrap and end-products multi-shipment policy\",\"authors\":\"Yuan-Shyi Peter Chiu, Ya-Lei Lo, Tsu-Ming Yeh, Yunsen Wang, Hung-Yi Chen\",\"doi\":\"10.5267/j.ijiec.2022.11.002\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The present work intends to optimize a hybrid delayed differentiation multiproduct economic production quantity-EPQ model with the scrap and end-products multi-shipment policy. Since the requirements of multi-goods have a standard part in common, our fabrication planning adopts a two-phase delayed differentiation strategy to make the standard components first and produce the finished multi-goods in the second phase. Implementing a partial subcontracting option (with the additional expense) for the standard parts helps us to expedite the required uptime in the first phase. A screening process identifies the faulty items that need to be removed to ensure the in-house production quality. A multi-shipment plan delivers the finished lot of end-products to clients in fixed time intervals. This study optimizes the overall operating expenses of this intra-supply chain system, including fabrication, delivery, and client stock holding, through our proposed modeling, formulation, and optimization procedure. In addition, this study gives a numerical demonstration of the obtained results’ applicability and usefulness to managerial decision-making.\",\"PeriodicalId\":51356,\"journal\":{\"name\":\"International Journal of Industrial Engineering Computations\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Industrial Engineering Computations\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5267/j.ijiec.2022.11.002\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering Computations","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5267/j.ijiec.2022.11.002","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
A hybrid delayed differentiation multiproduct EPQ model with scrap and end-products multi-shipment policy
The present work intends to optimize a hybrid delayed differentiation multiproduct economic production quantity-EPQ model with the scrap and end-products multi-shipment policy. Since the requirements of multi-goods have a standard part in common, our fabrication planning adopts a two-phase delayed differentiation strategy to make the standard components first and produce the finished multi-goods in the second phase. Implementing a partial subcontracting option (with the additional expense) for the standard parts helps us to expedite the required uptime in the first phase. A screening process identifies the faulty items that need to be removed to ensure the in-house production quality. A multi-shipment plan delivers the finished lot of end-products to clients in fixed time intervals. This study optimizes the overall operating expenses of this intra-supply chain system, including fabrication, delivery, and client stock holding, through our proposed modeling, formulation, and optimization procedure. In addition, this study gives a numerical demonstration of the obtained results’ applicability and usefulness to managerial decision-making.