压力模拟使用水cad程序在Pdam Tirta Musi Palembang的清洁水分配系统上

Mega Yunanda, Ferry Kurniawan
{"title":"压力模拟使用水cad程序在Pdam Tirta Musi Palembang的清洁水分配系统上","authors":"Mega Yunanda, Ferry Kurniawan","doi":"10.36050/berings.v5i01.146","DOIUrl":null,"url":null,"abstract":"District Meter Area (DMA) filtering is one of the DMA located in the 3 Ilir service Unit region, with 2013 customers as much as 1,392 subscription connections and 2017 as many as 1,490 subscription connections. The purpose of research is to know the water needs in 2018, customer growth projection, water needs 5 years ahead, high loss of press on pipelines and pressure on the pipeline network of clean water distribution. The research site is Jl. Penyaringan, Lr. Tirto Mulyo, Jl. Bambang Utoyo Kiri, Lr. Sahabat, Lr. Bugis, Lr. Sianjur III, with a different high contour and wide area. The method used is Hadry Cross method and pressure simulation using WaterCAD program. The result of clean water needs analysis in 2018 is 33.027 lt/sec. Projected customer growth period of 5 years to the future (year 2022) is 2,362 subscription connection, the amount of clean water needs of 56.174 lt/sec. High Loss Press (HGS) distribution pipeline network year 2017 is the largest in the block 7 with a high loss of pressure 1.0825 m or 0.10825 atm. The result of the pressure simulation of pipelines using WaterCAD program acquired pressure of 0.7546 ATM at junction Point J-33 block 5 (Lr. Tirta Mulyo) until 1.5149 ATM at junction Point J-68 block 7 (Lr. Bugis).","PeriodicalId":17796,"journal":{"name":"JURNAL ILMIAH BERING'S","volume":"60 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2018-03-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Simulasi Tekanan Menggunakan Program Watercad Pada Sistem Pendistribusian Air Bersih Di Pdam Tirta Musi Palembang\",\"authors\":\"Mega Yunanda, Ferry Kurniawan\",\"doi\":\"10.36050/berings.v5i01.146\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"District Meter Area (DMA) filtering is one of the DMA located in the 3 Ilir service Unit region, with 2013 customers as much as 1,392 subscription connections and 2017 as many as 1,490 subscription connections. The purpose of research is to know the water needs in 2018, customer growth projection, water needs 5 years ahead, high loss of press on pipelines and pressure on the pipeline network of clean water distribution. The research site is Jl. Penyaringan, Lr. Tirto Mulyo, Jl. Bambang Utoyo Kiri, Lr. Sahabat, Lr. Bugis, Lr. Sianjur III, with a different high contour and wide area. The method used is Hadry Cross method and pressure simulation using WaterCAD program. The result of clean water needs analysis in 2018 is 33.027 lt/sec. Projected customer growth period of 5 years to the future (year 2022) is 2,362 subscription connection, the amount of clean water needs of 56.174 lt/sec. High Loss Press (HGS) distribution pipeline network year 2017 is the largest in the block 7 with a high loss of pressure 1.0825 m or 0.10825 atm. The result of the pressure simulation of pipelines using WaterCAD program acquired pressure of 0.7546 ATM at junction Point J-33 block 5 (Lr. Tirta Mulyo) until 1.5149 ATM at junction Point J-68 block 7 (Lr. Bugis).\",\"PeriodicalId\":17796,\"journal\":{\"name\":\"JURNAL ILMIAH BERING'S\",\"volume\":\"60 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-03-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JURNAL ILMIAH BERING'S\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36050/berings.v5i01.146\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURNAL ILMIAH BERING'S","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36050/berings.v5i01.146","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

DMA (District Meter Area)过滤是位于3ilir服务单元区域的DMA之一,2013年的用户数量达到1392个,2017年的用户数量达到1490个。研究的目的是了解2018年的用水需求,客户增长预测,未来5年的用水需求,管道的高压力损失和清洁水分配管网的压力。研究地点是Jl。Penyaringan, Lr。Tirto Mulyo, jr。Bambang Utoyo Kiri, Lr。Sahabat, Lr。Bugis, Lr。Sianjur III,具有不同的高轮廓和广阔的面积。采用Hadry Cross法和WaterCAD程序进行压力模拟。2018年净水需求分析结果为33.027 lt/sec。预计未来5年客户增长期(2022年)为2362户订阅连接,需水量为56.174 lt/秒。2017年高损耗压机(HGS)配电管网在7区块是最大的,高损耗压力为1.0825 m或0.10825 atm。利用WaterCAD程序对管道进行压力模拟,得到J-33区块5 (Lr)接点压力为0.7546 ATM。Tirta Mulyo)至1.5149 ATM在J-68交汇点7块(Lr)。Bugis)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Simulasi Tekanan Menggunakan Program Watercad Pada Sistem Pendistribusian Air Bersih Di Pdam Tirta Musi Palembang
District Meter Area (DMA) filtering is one of the DMA located in the 3 Ilir service Unit region, with 2013 customers as much as 1,392 subscription connections and 2017 as many as 1,490 subscription connections. The purpose of research is to know the water needs in 2018, customer growth projection, water needs 5 years ahead, high loss of press on pipelines and pressure on the pipeline network of clean water distribution. The research site is Jl. Penyaringan, Lr. Tirto Mulyo, Jl. Bambang Utoyo Kiri, Lr. Sahabat, Lr. Bugis, Lr. Sianjur III, with a different high contour and wide area. The method used is Hadry Cross method and pressure simulation using WaterCAD program. The result of clean water needs analysis in 2018 is 33.027 lt/sec. Projected customer growth period of 5 years to the future (year 2022) is 2,362 subscription connection, the amount of clean water needs of 56.174 lt/sec. High Loss Press (HGS) distribution pipeline network year 2017 is the largest in the block 7 with a high loss of pressure 1.0825 m or 0.10825 atm. The result of the pressure simulation of pipelines using WaterCAD program acquired pressure of 0.7546 ATM at junction Point J-33 block 5 (Lr. Tirta Mulyo) until 1.5149 ATM at junction Point J-68 block 7 (Lr. Bugis).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
PEMANFAATAN BIJI KARET SEBAGAI AGREGAT KASAR TERHADAP WORKABILITY DAN KUAT TEKAN BETON SCC (SELF COMPACTING CONCRETE) PENILAIAN INDEKS ANCAMAN KEKERINGAN DI KECAMATAN DEMPO TENGAH KOTA PAGARALAM MENGGUNAKAN GIS PEMANFAATAN PASIR PUTIH SEBAGAI BAHAN PEMBUATAN BETON MUTU TINGGI FEASIBILITY STUDY (STUDI KELAYAKAN) PERENCANAAN PEMBANGUNAN TPS 3R DI PULAU SABIRA KABUPATEN KEPULAUAN SERIBU PROVINSI DKI JAKARTA) PENENTUAN PRIORITAS PENANGANAN LOKASI KUMUH PERKOTAAN DI KOTA PAGAR ALAM
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1