{"title":"英国伯肯黑德的塔路巴斯库勒桥","authors":"R. Langley","doi":"10.1680/jbren.21.00002","DOIUrl":null,"url":null,"abstract":"The A554 Tower Road connects Wallasey and Birkenhead on the Wirral, North West England. The road crosses the entrance to Birkenhead Docks from the River Mersey via a moveable bridge which is of major strategic importance in the local highway network. The previous “A” bridge, built in 1933, was a Scherzer type bascule lifting bridge with 34.4m main span, one of four similar bridges that once existed along Tower Road. The deteriorating condition of the bridge, the increasing maintenance costs and the consequential impact of maintenance on the local economy resulted in a decision to replace the bridge with a modern, low maintenance lifting bridge. This paper provides the background to the bridge replacement project, including the reasons for replacement with a similar Scherzer bascule bridge. The civil, mechanical and electrical design is described and some of the significant issues encountered during implementation and commissioning are discussed. The new bridge has successfully created a local landmark, contributing to the client Wirral Council's vision for the redevelopment of this dockland area as part of the Wirral Waters Regeneration project.","PeriodicalId":44437,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","volume":"886 1","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2022-05-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Tower Road Bascule Bridge, Birkenhead, UK\",\"authors\":\"R. Langley\",\"doi\":\"10.1680/jbren.21.00002\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The A554 Tower Road connects Wallasey and Birkenhead on the Wirral, North West England. The road crosses the entrance to Birkenhead Docks from the River Mersey via a moveable bridge which is of major strategic importance in the local highway network. The previous “A” bridge, built in 1933, was a Scherzer type bascule lifting bridge with 34.4m main span, one of four similar bridges that once existed along Tower Road. The deteriorating condition of the bridge, the increasing maintenance costs and the consequential impact of maintenance on the local economy resulted in a decision to replace the bridge with a modern, low maintenance lifting bridge. This paper provides the background to the bridge replacement project, including the reasons for replacement with a similar Scherzer bascule bridge. The civil, mechanical and electrical design is described and some of the significant issues encountered during implementation and commissioning are discussed. The new bridge has successfully created a local landmark, contributing to the client Wirral Council's vision for the redevelopment of this dockland area as part of the Wirral Waters Regeneration project.\",\"PeriodicalId\":44437,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Bridge Engineering\",\"volume\":\"886 1\",\"pages\":\"\"},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2022-05-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Bridge Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/jbren.21.00002\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jbren.21.00002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

A554塔路连接沃拉西和伯肯黑德在威勒尔,英格兰西北部。这条道路穿过默西河通往伯肯黑德码头的入口,通过一座可移动的桥梁,这座桥梁在当地公路网中具有重要的战略意义。之前的“A”桥建于1933年,是一座舍尔策式吊桥,主跨34.4米,是塔路沿线曾经存在的四座类似桥梁之一。由于该桥的状况不断恶化,维修费用不断增加,以及维修对当地经济的影响,最终决定用一座现代化的、维修费用较低的吊桥来取代该桥。本文提供了桥梁更换工程的背景,包括更换类似的舍尔泽拱桥的原因。介绍了土建、机械和电气设计,并讨论了在实施和调试过程中遇到的一些重要问题。这座新桥成功地创造了当地的地标,为客户Wirral委员会的愿景做出了贡献,作为Wirral水域再生项目的一部分,重新开发了这个码头区。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Tower Road Bascule Bridge, Birkenhead, UK
The A554 Tower Road connects Wallasey and Birkenhead on the Wirral, North West England. The road crosses the entrance to Birkenhead Docks from the River Mersey via a moveable bridge which is of major strategic importance in the local highway network. The previous “A” bridge, built in 1933, was a Scherzer type bascule lifting bridge with 34.4m main span, one of four similar bridges that once existed along Tower Road. The deteriorating condition of the bridge, the increasing maintenance costs and the consequential impact of maintenance on the local economy resulted in a decision to replace the bridge with a modern, low maintenance lifting bridge. This paper provides the background to the bridge replacement project, including the reasons for replacement with a similar Scherzer bascule bridge. The civil, mechanical and electrical design is described and some of the significant issues encountered during implementation and commissioning are discussed. The new bridge has successfully created a local landmark, contributing to the client Wirral Council's vision for the redevelopment of this dockland area as part of the Wirral Waters Regeneration project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.00
自引率
10.00%
发文量
48
期刊最新文献
Hybrid machine learning model for prediction of vertical deflection of composite bridges A control chart to evaluate the control effect of a bridge under active control Design of stone masonry bridges in European treatises: Part 1 – The geometrical configuration Extreme fjord-crossings development in the E39 coastal highway route project – a review The replacement of the Kosciuszko Bridge
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1