测量风险事件和活动持续时间的不确定性对项目进度的影响

H. Nasir
{"title":"测量风险事件和活动持续时间的不确定性对项目进度的影响","authors":"H. Nasir","doi":"10.26692/surj/2018.01.0003","DOIUrl":null,"url":null,"abstract":"Construction projects are usually over budget and beyond their planned schedule. One possible reason for these situations is that proper risk management techniques are not applied during the planning and execution of projects. This paper introduces a method which uses the impacts of risk in project scheduling. A simple infrastructure project is considered for analysis. Uncertainty in activity durations is assigned using various statistical distributions. Further, certain risk events are added to the project using risk register. The impact of these uncertainties in activity durations and risk events are modeled and simulated in @Risk software. The software uses Monte Carlo simulations for risk analysis. The results show that the model can predict the impact of uncertainty in activity durations on the pro-ject completion time. The additional days added to the planned schedule because of occurrence of risk events can also be predicted with confidence. The results provide confirmation that risks associated with project schedules can be managed if properly accounted for","PeriodicalId":21859,"journal":{"name":"Sindh University Research Journal","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-03-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Measuring the Impact of Risk Events and Uncertainty in Activity Durations on Project Schedul\",\"authors\":\"H. Nasir\",\"doi\":\"10.26692/surj/2018.01.0003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Construction projects are usually over budget and beyond their planned schedule. One possible reason for these situations is that proper risk management techniques are not applied during the planning and execution of projects. This paper introduces a method which uses the impacts of risk in project scheduling. A simple infrastructure project is considered for analysis. Uncertainty in activity durations is assigned using various statistical distributions. Further, certain risk events are added to the project using risk register. The impact of these uncertainties in activity durations and risk events are modeled and simulated in @Risk software. The software uses Monte Carlo simulations for risk analysis. The results show that the model can predict the impact of uncertainty in activity durations on the pro-ject completion time. The additional days added to the planned schedule because of occurrence of risk events can also be predicted with confidence. The results provide confirmation that risks associated with project schedules can be managed if properly accounted for\",\"PeriodicalId\":21859,\"journal\":{\"name\":\"Sindh University Research Journal\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-03-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Sindh University Research Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.26692/surj/2018.01.0003\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sindh University Research Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26692/surj/2018.01.0003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

建设项目通常超出预算,超出计划进度。出现这些情况的一个可能原因是在项目的计划和执行过程中没有应用适当的风险管理技术。本文介绍了一种在项目进度中考虑风险影响的方法。考虑一个简单的基础设施项目进行分析。活动持续时间的不确定性使用各种统计分布来分配。此外,使用风险登记册将某些风险事件添加到项目中。这些不确定性对活动持续时间和风险事件的影响在@Risk软件中进行建模和模拟。该软件使用蒙特卡罗模拟进行风险分析。结果表明,该模型能较好地预测活动持续时间的不确定性对项目完成时间的影响。由于风险事件的发生而增加到计划进度的额外天数也可以有信心地预测。结果证实,如果适当地考虑,与项目进度相关的风险是可以管理的
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Measuring the Impact of Risk Events and Uncertainty in Activity Durations on Project Schedul
Construction projects are usually over budget and beyond their planned schedule. One possible reason for these situations is that proper risk management techniques are not applied during the planning and execution of projects. This paper introduces a method which uses the impacts of risk in project scheduling. A simple infrastructure project is considered for analysis. Uncertainty in activity durations is assigned using various statistical distributions. Further, certain risk events are added to the project using risk register. The impact of these uncertainties in activity durations and risk events are modeled and simulated in @Risk software. The software uses Monte Carlo simulations for risk analysis. The results show that the model can predict the impact of uncertainty in activity durations on the pro-ject completion time. The additional days added to the planned schedule because of occurrence of risk events can also be predicted with confidence. The results provide confirmation that risks associated with project schedules can be managed if properly accounted for
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Knowledge, awareness and perception towards COVID-19 during early outbreak: a cross-sectional study from southern Pakistan Analysis of Facebook contents of Police Department of Pakistan in the context of Good Governance Perception of Quality about Local Manufacturing of Drugs in Pakistan and Its Qualitative Analysis Frequency of overweight and obesity among Middle School Children A case study of District Hyderabad Pakistan Mineralogical Studies of Manchar Formation (Pliocene), Laki Range, Pakistan: source and Possible Occurrence of Bauxite
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1