Samer Hanoun, Burhan Khan, Michael Johnstone, S. Nahavandi, D. Creighton
{"title":"煤炭装卸设备堆场规划和机械调度的有效启发式算法","authors":"Samer Hanoun, Burhan Khan, Michael Johnstone, S. Nahavandi, D. Creighton","doi":"10.1109/INDIN.2013.6622883","DOIUrl":null,"url":null,"abstract":"Coal handling is a complex process involving different correlated and highly dependent operations such as selecting appropriate product types, planning stockpiles, scheduling stacking and reclaiming activities and managing train loads. Planning these operations manually is time consuming and can result in non-optimized schedules as future impact of decisions may not be appropriately considered. This paper addresses the operational scheduling of the continuous coal handling problem with multiple conflicting objectives. As the problem is NP-hard in nature, an effective heuristic is presented for planning stockpiles and scheduling resources to minimize delays in production and the coal age in the stockyard. A model of stockyard operations within a coal mine is described and the problem is formulated as a Bi-Objective Optimization Problem (BOOP). The algorithm efficacy is demonstrated on different real-life data scenarios. Computational results show that the solution algorithm is effective and the coal throughput is substantially impacted by the conflicting objectives. Together, the model and the proposed heuristic, can act as a decision support system for the stockyard planner to explore the effects of alternative decisions, such as balancing age and volume of stockpiles, and minimizing conflicts due to stacker and reclaimer movements.","PeriodicalId":6312,"journal":{"name":"2013 11th IEEE International Conference on Industrial Informatics (INDIN)","volume":"84 1","pages":"206-211"},"PeriodicalIF":0.0000,"publicationDate":"2013-07-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"18","resultStr":"{\"title\":\"An effective heuristic for stockyard planning and machinery scheduling at a coal handling facility\",\"authors\":\"Samer Hanoun, Burhan Khan, Michael Johnstone, S. Nahavandi, D. Creighton\",\"doi\":\"10.1109/INDIN.2013.6622883\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Coal handling is a complex process involving different correlated and highly dependent operations such as selecting appropriate product types, planning stockpiles, scheduling stacking and reclaiming activities and managing train loads. Planning these operations manually is time consuming and can result in non-optimized schedules as future impact of decisions may not be appropriately considered. This paper addresses the operational scheduling of the continuous coal handling problem with multiple conflicting objectives. As the problem is NP-hard in nature, an effective heuristic is presented for planning stockpiles and scheduling resources to minimize delays in production and the coal age in the stockyard. A model of stockyard operations within a coal mine is described and the problem is formulated as a Bi-Objective Optimization Problem (BOOP). The algorithm efficacy is demonstrated on different real-life data scenarios. Computational results show that the solution algorithm is effective and the coal throughput is substantially impacted by the conflicting objectives. Together, the model and the proposed heuristic, can act as a decision support system for the stockyard planner to explore the effects of alternative decisions, such as balancing age and volume of stockpiles, and minimizing conflicts due to stacker and reclaimer movements.\",\"PeriodicalId\":6312,\"journal\":{\"name\":\"2013 11th IEEE International Conference on Industrial Informatics (INDIN)\",\"volume\":\"84 1\",\"pages\":\"206-211\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-07-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"18\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 11th IEEE International Conference on Industrial Informatics (INDIN)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INDIN.2013.6622883\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 11th IEEE International Conference on Industrial Informatics (INDIN)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INDIN.2013.6622883","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
An effective heuristic for stockyard planning and machinery scheduling at a coal handling facility
Coal handling is a complex process involving different correlated and highly dependent operations such as selecting appropriate product types, planning stockpiles, scheduling stacking and reclaiming activities and managing train loads. Planning these operations manually is time consuming and can result in non-optimized schedules as future impact of decisions may not be appropriately considered. This paper addresses the operational scheduling of the continuous coal handling problem with multiple conflicting objectives. As the problem is NP-hard in nature, an effective heuristic is presented for planning stockpiles and scheduling resources to minimize delays in production and the coal age in the stockyard. A model of stockyard operations within a coal mine is described and the problem is formulated as a Bi-Objective Optimization Problem (BOOP). The algorithm efficacy is demonstrated on different real-life data scenarios. Computational results show that the solution algorithm is effective and the coal throughput is substantially impacted by the conflicting objectives. Together, the model and the proposed heuristic, can act as a decision support system for the stockyard planner to explore the effects of alternative decisions, such as balancing age and volume of stockpiles, and minimizing conflicts due to stacker and reclaimer movements.