管理中等复杂程度的关键生物医学设备维护的Rcm-pmbok混合方法

Oscar Manuel Duque Suárez, Antonio Lucas Mármol, J. A. Gomez Camperos
{"title":"管理中等复杂程度的关键生物医学设备维护的Rcm-pmbok混合方法","authors":"Oscar Manuel Duque Suárez, Antonio Lucas Mármol, J. A. Gomez Camperos","doi":"10.5937/jaes0-42211","DOIUrl":null,"url":null,"abstract":"The research carried out resulted in the proposal to create a hybrid methodology between two topics such as RCM and PMBOK applied to the management of critical equipment maintenance in the biomedical area in health service providers (IPS) of medium complexity of the city of Cúcuta, Colombia. The hybrid methodology is based on a five-phase project structure, with overall management and tactical activities, deliverable documents for biomedical maintenance management (GMB) and more for GMB activity documentation, recommended tools and techniques for the implementation of activities, in addition to recommended guidelines and formats, where this was applied directly in four medium complexity Health Service Providers (IPS) Institutions of Cúcuta-Colombia, in which product of the professional and teaching experience of the author of this research with the design and execution of maintenance plans based on reliability for these institutions, are considered as case studies since they have the design basis of the RCM in three of them and the fourth is presented as a pilot where the hybrid model to be designed was implemented from scratch.    ","PeriodicalId":35468,"journal":{"name":"Journal of Applied Engineering Science","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"RCM-PMBOK HYBRID METHODOLOGY FOR MANAGING THE MAINTENANCE OF CRITICAL BIOMEDICAL EQUIPMENT IN IPS OF MEDIUM COMPLEXITY\",\"authors\":\"Oscar Manuel Duque Suárez, Antonio Lucas Mármol, J. A. Gomez Camperos\",\"doi\":\"10.5937/jaes0-42211\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The research carried out resulted in the proposal to create a hybrid methodology between two topics such as RCM and PMBOK applied to the management of critical equipment maintenance in the biomedical area in health service providers (IPS) of medium complexity of the city of Cúcuta, Colombia. The hybrid methodology is based on a five-phase project structure, with overall management and tactical activities, deliverable documents for biomedical maintenance management (GMB) and more for GMB activity documentation, recommended tools and techniques for the implementation of activities, in addition to recommended guidelines and formats, where this was applied directly in four medium complexity Health Service Providers (IPS) Institutions of Cúcuta-Colombia, in which product of the professional and teaching experience of the author of this research with the design and execution of maintenance plans based on reliability for these institutions, are considered as case studies since they have the design basis of the RCM in three of them and the fourth is presented as a pilot where the hybrid model to be designed was implemented from scratch.    \",\"PeriodicalId\":35468,\"journal\":{\"name\":\"Journal of Applied Engineering Science\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Applied Engineering Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5937/jaes0-42211\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Applied Engineering Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5937/jaes0-42211","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

所进行的研究产生了一项建议,即创建一种介于RCM和PMBOK等两个主题之间的混合方法,适用于哥伦比亚Cúcuta市中等复杂程度的卫生服务提供者(IPS)生物医学领域关键设备维护的管理。混合方法以五阶段项目结构为基础,包括总体管理和战术活动、可交付的生物医学维持管理文件和更多生物医学维持管理活动文件、执行活动的建议工具和技术,以及建议的准则和格式,并直接应用于Cúcuta-Colombia的四个中等复杂程度的保健服务提供者机构。其中,本研究作者的专业和教学经验的产物,以及基于这些机构可靠性的维护计划的设计和执行,被视为案例研究,因为它们在其中三个中具有RCM的设计基础,而第四个是作为试点提出的,其中要设计的混合模型是从头开始实施的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
RCM-PMBOK HYBRID METHODOLOGY FOR MANAGING THE MAINTENANCE OF CRITICAL BIOMEDICAL EQUIPMENT IN IPS OF MEDIUM COMPLEXITY
The research carried out resulted in the proposal to create a hybrid methodology between two topics such as RCM and PMBOK applied to the management of critical equipment maintenance in the biomedical area in health service providers (IPS) of medium complexity of the city of Cúcuta, Colombia. The hybrid methodology is based on a five-phase project structure, with overall management and tactical activities, deliverable documents for biomedical maintenance management (GMB) and more for GMB activity documentation, recommended tools and techniques for the implementation of activities, in addition to recommended guidelines and formats, where this was applied directly in four medium complexity Health Service Providers (IPS) Institutions of Cúcuta-Colombia, in which product of the professional and teaching experience of the author of this research with the design and execution of maintenance plans based on reliability for these institutions, are considered as case studies since they have the design basis of the RCM in three of them and the fourth is presented as a pilot where the hybrid model to be designed was implemented from scratch.    
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Applied Engineering Science
Journal of Applied Engineering Science Engineering-Engineering (all)
CiteScore
2.00
自引率
0.00%
发文量
122
审稿时长
12 weeks
期刊介绍: Since 2002 iipp build cooperation with its clients established on wealthy experience, interchangeable respect and trust and permanently arrangement with the purpose of successfully realization of projects recognizable according to good organization and high quality of provided favors. Working as unique team of highly motivated experts, Institute iipp provides to its customers the most high-quality solutions in domain of engineering consulting.
期刊最新文献
SIMULATION MODELING OF LOGGING HARVESTER MOVEMENTS DURING SELECTIVE LOGGING RISK MITIGATION AS A MEDIATING FACTOR IN THE RELATIONSHIP BETWEEN TOP MANAGEMENT SUPPORT AND CONSTRUCTION PROJECT PERFORMANCE 3D DOCUMENTATION OF CULTURAL HERITAGE USING TERRESTRIAL LASER SCANNING ROAD TRAFFIC ACCIDENTS FACTOR ON RURAL ARTERIAL ROADS RESTORATION OF LARGE MODULAR TEETH OF BALL MILL GEARS BY ELECTRO-SLAG SURFACE
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1