巴基斯坦建筑业PPP项目的障碍

M. Qureshi
{"title":"巴基斯坦建筑业PPP项目的障碍","authors":"M. Qureshi","doi":"10.57041/pjosr.v1i1.2","DOIUrl":null,"url":null,"abstract":"Public Private Partnership (PPP) is a mechanism adopted to support the development in a country facing financial problems. In achieving successful PPP projects, one of the major criteria is attaining value for money. There are several barriers which can affect adoption of PPP which are essential to uncover for enhancing the adoption level of PPP. Hence, this project has focused on identifying barriers affecting PPP projects of Pakistan. Data collection for this study was done through  questionnaire  survey  among  the  personnel  involved  in  handling  PPP projects. From statistical analysis of collected data it was found that unhealthy bid competition, lack of managerial skills and experience and public sector related problems are major barriers in adoption of value for money in PPP projects of Pakistan.","PeriodicalId":19924,"journal":{"name":"Pakistan Journal of Scientific & Industrial Research Series A: Physical Sciences","volume":"7 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Barriers to PPP Projects in Construction Sector of Pakistan\",\"authors\":\"M. Qureshi\",\"doi\":\"10.57041/pjosr.v1i1.2\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Public Private Partnership (PPP) is a mechanism adopted to support the development in a country facing financial problems. In achieving successful PPP projects, one of the major criteria is attaining value for money. There are several barriers which can affect adoption of PPP which are essential to uncover for enhancing the adoption level of PPP. Hence, this project has focused on identifying barriers affecting PPP projects of Pakistan. Data collection for this study was done through  questionnaire  survey  among  the  personnel  involved  in  handling  PPP projects. From statistical analysis of collected data it was found that unhealthy bid competition, lack of managerial skills and experience and public sector related problems are major barriers in adoption of value for money in PPP projects of Pakistan.\",\"PeriodicalId\":19924,\"journal\":{\"name\":\"Pakistan Journal of Scientific & Industrial Research Series A: Physical Sciences\",\"volume\":\"7 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Pakistan Journal of Scientific & Industrial Research Series A: Physical Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.57041/pjosr.v1i1.2\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Pakistan Journal of Scientific & Industrial Research Series A: Physical Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.57041/pjosr.v1i1.2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

政府和社会资本合作(PPP)是一种支持面临财政问题的国家发展的机制。要取得成功的PPP项目,其中一个主要标准是实现物有所值。有几个障碍会影响PPP的采用,这些障碍对于提高PPP的采用水平至关重要。因此,本项目的重点是确定影响巴基斯坦PPP项目的障碍。本研究的数据收集是通过问卷调查参与处理PPP项目的人员。从收集数据的统计分析中发现,不健康的投标竞争,缺乏管理技能和经验以及公共部门相关问题是巴基斯坦PPP项目采用物有所值的主要障碍。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Barriers to PPP Projects in Construction Sector of Pakistan
Public Private Partnership (PPP) is a mechanism adopted to support the development in a country facing financial problems. In achieving successful PPP projects, one of the major criteria is attaining value for money. There are several barriers which can affect adoption of PPP which are essential to uncover for enhancing the adoption level of PPP. Hence, this project has focused on identifying barriers affecting PPP projects of Pakistan. Data collection for this study was done through  questionnaire  survey  among  the  personnel  involved  in  handling  PPP projects. From statistical analysis of collected data it was found that unhealthy bid competition, lack of managerial skills and experience and public sector related problems are major barriers in adoption of value for money in PPP projects of Pakistan.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Durability Studies on High Strength Concrete Health Monitoring and Breathing Support System Water Quality Modeling Using Soil and Water Assessment Tool: A Case Study of Rawal Watershed Design and Analysis of Wave Energy Converter Technologies Analysis of Vulnerabilities in System by Penetration Testing
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1