E. Xu, M. S. Yang, Y. Li, X. Q. Gao, Z.Y. Wang, L. Ren
{"title":"基于NSGA-III和NSGA-II进化算法的串并联系统多目标选择性维护优化方法","authors":"E. Xu, M. S. Yang, Y. Li, X. Q. Gao, Z.Y. Wang, L. Ren","doi":"10.14743/apem2021.3.407","DOIUrl":null,"url":null,"abstract":"Aiming at the problem that the downtime is simply assumed to be constant and the limited resources are not considered in the current selective maintenance of the series-parallel system, a three-objective selective maintenance model for the series-parallel system is established to minimize the maintenance cost, maximize the probability of completing the next task and minimize the downtime. The maintenance decision-making model and personnel allocation model are combined to make decisions on the optimal length of each equipment’s rest period, the equipment to be maintained during the rest period and the maintenance level. For the multi-objective model established, the NSGA-III algorithm is designed to solve the model. Comparing with the NSGA-II algorithm that only considers the first two objectives, it is verified that the designed multi-objective model can effectively reduce the downtime of the system.","PeriodicalId":48763,"journal":{"name":"Advances in Production Engineering & Management","volume":null,"pages":null},"PeriodicalIF":2.8000,"publicationDate":"2021-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"A multi-objective selective maintenance optimization method for series-parallel systems using NSGA-III and NSGA-II evolutionary algorithms\",\"authors\":\"E. Xu, M. S. Yang, Y. Li, X. Q. Gao, Z.Y. Wang, L. Ren\",\"doi\":\"10.14743/apem2021.3.407\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Aiming at the problem that the downtime is simply assumed to be constant and the limited resources are not considered in the current selective maintenance of the series-parallel system, a three-objective selective maintenance model for the series-parallel system is established to minimize the maintenance cost, maximize the probability of completing the next task and minimize the downtime. The maintenance decision-making model and personnel allocation model are combined to make decisions on the optimal length of each equipment’s rest period, the equipment to be maintained during the rest period and the maintenance level. For the multi-objective model established, the NSGA-III algorithm is designed to solve the model. Comparing with the NSGA-II algorithm that only considers the first two objectives, it is verified that the designed multi-objective model can effectively reduce the downtime of the system.\",\"PeriodicalId\":48763,\"journal\":{\"name\":\"Advances in Production Engineering & Management\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.8000,\"publicationDate\":\"2021-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advances in Production Engineering & Management\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.14743/apem2021.3.407\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"ENGINEERING, MANUFACTURING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advances in Production Engineering & Management","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.14743/apem2021.3.407","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"ENGINEERING, MANUFACTURING","Score":null,"Total":0}
A multi-objective selective maintenance optimization method for series-parallel systems using NSGA-III and NSGA-II evolutionary algorithms
Aiming at the problem that the downtime is simply assumed to be constant and the limited resources are not considered in the current selective maintenance of the series-parallel system, a three-objective selective maintenance model for the series-parallel system is established to minimize the maintenance cost, maximize the probability of completing the next task and minimize the downtime. The maintenance decision-making model and personnel allocation model are combined to make decisions on the optimal length of each equipment’s rest period, the equipment to be maintained during the rest period and the maintenance level. For the multi-objective model established, the NSGA-III algorithm is designed to solve the model. Comparing with the NSGA-II algorithm that only considers the first two objectives, it is verified that the designed multi-objective model can effectively reduce the downtime of the system.
期刊介绍:
Advances in Production Engineering & Management (APEM journal) is an interdisciplinary international academic journal published quarterly. The main goal of the APEM journal is to present original, high quality, theoretical and application-oriented research developments in all areas of production engineering and production management to a broad audience of academics and practitioners. In order to bridge the gap between theory and practice, applications based on advanced theory and case studies are particularly welcome. For theoretical papers, their originality and research contributions are the main factors in the evaluation process. General approaches, formalisms, algorithms or techniques should be illustrated with significant applications that demonstrate their applicability to real-world problems. Please note the APEM journal is not intended especially for studying problems in the finance, economics, business, and bank sectors even though the methodology in the paper is quality/project management oriented. Therefore, the papers should include a substantial level of engineering issues in the field of manufacturing engineering.