{"title":"中东某油井井喷事故原因分析及成功控制","authors":"Rahman Ashena, Farzad Ghorbani, Muhammad Mubashir, Mahdi Nazari Sarem, Amin Iravani","doi":"10.2118/207834-ms","DOIUrl":null,"url":null,"abstract":"\n In 2017, a blowout and explosion occurred in a drilling oilwell in the Middle East. After drilling to the depth of 2,610 m, tripping was decided in order to change the bit. When the crew were pulling the drill string out of the hole with the drill-string being at the depth of 1332 m, blowout and explosion occurred. The well was a development well drilling almost horizontally (82 degrees inclination angle) into a highly-pressured gas-cap and oil pay-zone of the oilfield. In this work, following a brief explanation of the root causal factors of the incident, we give an account of the blowout control methods applied to put an end to the blowout. Both the top-kill method and the bottom-kill method by relief well drilling, were simultaneously implemented to control the blowout. Finally, the blowout was successfully controlled by the bottom-kill after 58 days. During top-kill operations, all equipment was cleared away and this contributed to proceeding to permanent abandonment immediately after the relief well success. Finally, the adverse effect of the blowout on the environment (HSE) was qualitatively discussed.","PeriodicalId":11069,"journal":{"name":"Day 2 Tue, November 16, 2021","volume":"40 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"The Root Cause Analysis and Successful Control of an Oilwell Blowout in the Middle East\",\"authors\":\"Rahman Ashena, Farzad Ghorbani, Muhammad Mubashir, Mahdi Nazari Sarem, Amin Iravani\",\"doi\":\"10.2118/207834-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n In 2017, a blowout and explosion occurred in a drilling oilwell in the Middle East. After drilling to the depth of 2,610 m, tripping was decided in order to change the bit. When the crew were pulling the drill string out of the hole with the drill-string being at the depth of 1332 m, blowout and explosion occurred. The well was a development well drilling almost horizontally (82 degrees inclination angle) into a highly-pressured gas-cap and oil pay-zone of the oilfield. In this work, following a brief explanation of the root causal factors of the incident, we give an account of the blowout control methods applied to put an end to the blowout. Both the top-kill method and the bottom-kill method by relief well drilling, were simultaneously implemented to control the blowout. Finally, the blowout was successfully controlled by the bottom-kill after 58 days. During top-kill operations, all equipment was cleared away and this contributed to proceeding to permanent abandonment immediately after the relief well success. Finally, the adverse effect of the blowout on the environment (HSE) was qualitatively discussed.\",\"PeriodicalId\":11069,\"journal\":{\"name\":\"Day 2 Tue, November 16, 2021\",\"volume\":\"40 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, November 16, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/207834-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, November 16, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/207834-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

2017年,中东地区的一口钻井发生井喷和爆炸。钻进至2610米深度后,决定起下钻更换钻头。当工作人员将钻柱拉出井眼时,钻柱深度为1332 m,发生井喷爆炸。该井为几乎水平(82度斜度)钻入油田高压气顶产油区的开发井。在本文中,在简要解释了事故的根本原因之后,我们介绍了为制止井喷而采用的井喷控制方法。同时采用顶压法和减压井底压法控制井喷。最后,58天后,井喷通过压底成功控制。在顶压作业期间,所有设备都被清理干净,这有助于在减压井成功后立即进行永久弃井。最后,定性地讨论了井喷对环境的不利影响(HSE)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
The Root Cause Analysis and Successful Control of an Oilwell Blowout in the Middle East
In 2017, a blowout and explosion occurred in a drilling oilwell in the Middle East. After drilling to the depth of 2,610 m, tripping was decided in order to change the bit. When the crew were pulling the drill string out of the hole with the drill-string being at the depth of 1332 m, blowout and explosion occurred. The well was a development well drilling almost horizontally (82 degrees inclination angle) into a highly-pressured gas-cap and oil pay-zone of the oilfield. In this work, following a brief explanation of the root causal factors of the incident, we give an account of the blowout control methods applied to put an end to the blowout. Both the top-kill method and the bottom-kill method by relief well drilling, were simultaneously implemented to control the blowout. Finally, the blowout was successfully controlled by the bottom-kill after 58 days. During top-kill operations, all equipment was cleared away and this contributed to proceeding to permanent abandonment immediately after the relief well success. Finally, the adverse effect of the blowout on the environment (HSE) was qualitatively discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Three-Dimensional Visualization of Oil Displacement by Foam in Porous Media Maximizing Condensate Recovery With Proven Cost Simulation for a Giant UAE Field: Base Study to Estimate Productivity between Horizontal and Vertical Wells Rationalization of Flares at Terminal Island A Geoengineering Approach to Maximum Reservoir Contact Wells Design: Case Study in a Carbonate Reservoir Under Water and Miscible Gas Injection Maximizing Brine Recovery After the Displacement of Reservoir Drill-in Fluids to Reduce Well Cost Via New, Alternate Technology In a Reservoir Offshore Abu Dhabi
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1