{"title":"并联电抗器特高压输电线路单相自适应自合闸仿真分析","authors":"Yu Liu, Jun Wen","doi":"10.1109/ICEET.2009.306","DOIUrl":null,"url":null,"abstract":"This paper presents a single-phase auto-reclose study of a 1000 kV AC transmission line. The technology of auto-reclose has been widely used on the transmission lines in our country. The purpose is to make the fault line re-run after the temporary fault elimination. As most of the faults are transient in nature, the auto-reclose can greatly improve the reliability of the electricity and the stability of the power system, running side by side. The setting time of the conventional single-phase auto-reclose is determined by a fixed value, when the single-phase opens, auto-reclose recloses at the fixed-time regardless of the fault existence or not, as well as the secondary arc current. In this paper, the issue is given a reasonable solution. According to the arc eliminating time, the dynamic reclosing time is determined.","PeriodicalId":6348,"journal":{"name":"2009 International Conference on Energy and Environment Technology","volume":"34 1","pages":"279-282"},"PeriodicalIF":0.0000,"publicationDate":"2009-10-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Simulation Analysis of Single-Phase Adaptive Auto-Reclose on UHV Transmission Lines with Shunt Reactors\",\"authors\":\"Yu Liu, Jun Wen\",\"doi\":\"10.1109/ICEET.2009.306\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a single-phase auto-reclose study of a 1000 kV AC transmission line. The technology of auto-reclose has been widely used on the transmission lines in our country. The purpose is to make the fault line re-run after the temporary fault elimination. As most of the faults are transient in nature, the auto-reclose can greatly improve the reliability of the electricity and the stability of the power system, running side by side. The setting time of the conventional single-phase auto-reclose is determined by a fixed value, when the single-phase opens, auto-reclose recloses at the fixed-time regardless of the fault existence or not, as well as the secondary arc current. In this paper, the issue is given a reasonable solution. According to the arc eliminating time, the dynamic reclosing time is determined.\",\"PeriodicalId\":6348,\"journal\":{\"name\":\"2009 International Conference on Energy and Environment Technology\",\"volume\":\"34 1\",\"pages\":\"279-282\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-10-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 International Conference on Energy and Environment Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICEET.2009.306\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 International Conference on Energy and Environment Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEET.2009.306","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Simulation Analysis of Single-Phase Adaptive Auto-Reclose on UHV Transmission Lines with Shunt Reactors
This paper presents a single-phase auto-reclose study of a 1000 kV AC transmission line. The technology of auto-reclose has been widely used on the transmission lines in our country. The purpose is to make the fault line re-run after the temporary fault elimination. As most of the faults are transient in nature, the auto-reclose can greatly improve the reliability of the electricity and the stability of the power system, running side by side. The setting time of the conventional single-phase auto-reclose is determined by a fixed value, when the single-phase opens, auto-reclose recloses at the fixed-time regardless of the fault existence or not, as well as the secondary arc current. In this paper, the issue is given a reasonable solution. According to the arc eliminating time, the dynamic reclosing time is determined.