{"title":"多重违约情况下规避损失参与者的高效供应链契约","authors":"Arijit Mitra, S. Sarkar","doi":"10.37625/abr.25.2.270-292","DOIUrl":null,"url":null,"abstract":"The legal literature distinguishes between the liquidated damage and the penalty clauses in contracts, and holds that penalties designed for the prevention of breach are excessive compared to the liquidated damages. In an efficient supply chain contract, the penalty must satisfy the participation and incentive compatibility constraints of the signatories. Considering loss-averse players, we have calculated optimal penalties in a supply chain contract and compared those with the liquidated damages. Two possible breaches are considered – a breach in quality of the delivery and a breach in the process. In the absence of any penalty, a process breach reduces the supplier’s delivery risk and cost of delivery. Determining the parametric conditions for efficient contracts, numerically we show the effects of various variables on the zone of efficient contract. We show that the optimal penalties need not be excessive compared to the liquidated damages.","PeriodicalId":34785,"journal":{"name":"American Business Review","volume":"25 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-11-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Efficient Supply Chain Contracting with Loss-averse Players in Presence of Multiple Plausible Breaches\",\"authors\":\"Arijit Mitra, S. Sarkar\",\"doi\":\"10.37625/abr.25.2.270-292\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The legal literature distinguishes between the liquidated damage and the penalty clauses in contracts, and holds that penalties designed for the prevention of breach are excessive compared to the liquidated damages. In an efficient supply chain contract, the penalty must satisfy the participation and incentive compatibility constraints of the signatories. Considering loss-averse players, we have calculated optimal penalties in a supply chain contract and compared those with the liquidated damages. Two possible breaches are considered – a breach in quality of the delivery and a breach in the process. In the absence of any penalty, a process breach reduces the supplier’s delivery risk and cost of delivery. Determining the parametric conditions for efficient contracts, numerically we show the effects of various variables on the zone of efficient contract. We show that the optimal penalties need not be excessive compared to the liquidated damages.\",\"PeriodicalId\":34785,\"journal\":{\"name\":\"American Business Review\",\"volume\":\"25 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"American Business Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37625/abr.25.2.270-292\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"American Business Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37625/abr.25.2.270-292","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
Efficient Supply Chain Contracting with Loss-averse Players in Presence of Multiple Plausible Breaches
The legal literature distinguishes between the liquidated damage and the penalty clauses in contracts, and holds that penalties designed for the prevention of breach are excessive compared to the liquidated damages. In an efficient supply chain contract, the penalty must satisfy the participation and incentive compatibility constraints of the signatories. Considering loss-averse players, we have calculated optimal penalties in a supply chain contract and compared those with the liquidated damages. Two possible breaches are considered – a breach in quality of the delivery and a breach in the process. In the absence of any penalty, a process breach reduces the supplier’s delivery risk and cost of delivery. Determining the parametric conditions for efficient contracts, numerically we show the effects of various variables on the zone of efficient contract. We show that the optimal penalties need not be excessive compared to the liquidated damages.