{"title":"路面养护中的资金预算问题","authors":"Ronald D. Armstrong,&nbsp;Wade D. Cook","doi":"10.1016/0147-8001(79)90016-0","DOIUrl":null,"url":null,"abstract":"<div><p>This paper models a class of capital budgeting problems in pavement maintenance as nonlinear discontinuous programming problems and presents a solution procedure. The objective of the models developed is to determine if certain road segments should be rehabilitated in the given year (resurfaced, reconstructed or patched), or major maintenance postponed for at least another year. If the road is to be rehabilitated, some variation in funds expended is possible. The marginal return within the allowable interval of variation is estimated to be nonlinear. Two basic models are presented. The first assumes the rehabilitative alternative or design is fixed, and hence the problem has a single linear constraint imposed by the budget. The second is the design selection problem and contains multiple choice constraints in addition to the budget constraint. An illustrative example is included.</p></div>","PeriodicalId":101267,"journal":{"name":"Urban Systems","volume":"4 2","pages":"Pages 175-181"},"PeriodicalIF":0.0000,"publicationDate":"1979-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0147-8001(79)90016-0","citationCount":"7","resultStr":"{\"title\":\"Capital budgeting problems in pavement maintenance\",\"authors\":\"Ronald D. Armstrong,&nbsp;Wade D. Cook\",\"doi\":\"10.1016/0147-8001(79)90016-0\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>This paper models a class of capital budgeting problems in pavement maintenance as nonlinear discontinuous programming problems and presents a solution procedure. The objective of the models developed is to determine if certain road segments should be rehabilitated in the given year (resurfaced, reconstructed or patched), or major maintenance postponed for at least another year. If the road is to be rehabilitated, some variation in funds expended is possible. The marginal return within the allowable interval of variation is estimated to be nonlinear. Two basic models are presented. The first assumes the rehabilitative alternative or design is fixed, and hence the problem has a single linear constraint imposed by the budget. The second is the design selection problem and contains multiple choice constraints in addition to the budget constraint. An illustrative example is included.</p></div>\",\"PeriodicalId\":101267,\"journal\":{\"name\":\"Urban Systems\",\"volume\":\"4 2\",\"pages\":\"Pages 175-181\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1979-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0147-8001(79)90016-0\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Urban Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0147800179900160\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Urban Systems","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0147800179900160","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

本文将路面养护资金预算问题建模为非线性不连续规划问题,并给出了求解过程。所开发的模型的目的是确定某些路段是否应在给定年份进行修复(重铺路面、重建或修补),或将主要维修工作至少推迟一年。如果要修复这条道路,所花费的资金可能会有所不同。在允许变化区间内的边际收益估计为非线性。提出了两种基本模型。第一个假设修复方案或设计是固定的,因此这个问题只有一个由预算施加的线性约束。二是设计选择问题,除预算约束外,还包含多选择约束。包括一个说明性示例。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Capital budgeting problems in pavement maintenance

This paper models a class of capital budgeting problems in pavement maintenance as nonlinear discontinuous programming problems and presents a solution procedure. The objective of the models developed is to determine if certain road segments should be rehabilitated in the given year (resurfaced, reconstructed or patched), or major maintenance postponed for at least another year. If the road is to be rehabilitated, some variation in funds expended is possible. The marginal return within the allowable interval of variation is estimated to be nonlinear. Two basic models are presented. The first assumes the rehabilitative alternative or design is fixed, and hence the problem has a single linear constraint imposed by the budget. The second is the design selection problem and contains multiple choice constraints in addition to the budget constraint. An illustrative example is included.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Editorial Board A systems analysis approach to transit routing and scheduling in a small city Delphi methodologies: A review and critique The assessment of public agency responsiveness: A pilot study in an urban context Integer goal programming model for urban renewal planning
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1