海上井口上部平台的拆除-重量工程挑战

Sharath Chandran Bodheswaran, Muhammed Razeeem Puthiyaveedu, Cibu K. Varghese, F. Kamal
{"title":"海上井口上部平台的拆除-重量工程挑战","authors":"Sharath Chandran Bodheswaran, Muhammed Razeeem Puthiyaveedu, Cibu K. Varghese, F. Kamal","doi":"10.2118/207683-ms","DOIUrl":null,"url":null,"abstract":"\n Some of the platforms installed in offshore fields in India have exceeded their design lifespan but continues to operate. For these platforms to continue operating safely and successfully, major revamp is required. As the wellheads are in operation beyond their intended lifespan and requires revamping due to their heavily corroded state, decommissioning, removal and replacement of existing offshore structures presents technical and economic challenges to Operating Company's and Contractors, alike. Due to the age of these platforms, availability of technical/engineering data is minimal and often needs to be developed from scratch.\n The focus of this paper is on Weight Engineering and challenges in developing such data for a platform without as built information. The paper also touches on the different stages of executing the project including demolition engineering strategies applied, use of different installation aids to facilitate demolition etc during successful execution of Brownfield works in Mumbai High field by National Petroleum Construction Company (NPCC).","PeriodicalId":11069,"journal":{"name":"Day 2 Tue, November 16, 2021","volume":"14 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Demolition of Offshore Wellhead Topsides - Weight Engineering Challenges\",\"authors\":\"Sharath Chandran Bodheswaran, Muhammed Razeeem Puthiyaveedu, Cibu K. Varghese, F. Kamal\",\"doi\":\"10.2118/207683-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Some of the platforms installed in offshore fields in India have exceeded their design lifespan but continues to operate. For these platforms to continue operating safely and successfully, major revamp is required. As the wellheads are in operation beyond their intended lifespan and requires revamping due to their heavily corroded state, decommissioning, removal and replacement of existing offshore structures presents technical and economic challenges to Operating Company's and Contractors, alike. Due to the age of these platforms, availability of technical/engineering data is minimal and often needs to be developed from scratch.\\n The focus of this paper is on Weight Engineering and challenges in developing such data for a platform without as built information. The paper also touches on the different stages of executing the project including demolition engineering strategies applied, use of different installation aids to facilitate demolition etc during successful execution of Brownfield works in Mumbai High field by National Petroleum Construction Company (NPCC).\",\"PeriodicalId\":11069,\"journal\":{\"name\":\"Day 2 Tue, November 16, 2021\",\"volume\":\"14 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, November 16, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/207683-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, November 16, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/207683-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

一些安装在印度海上油田的平台已经超过了设计寿命,但仍在继续运行。为了使这些平台继续安全成功地运行,需要进行重大改造。由于井口的使用寿命超出了预期,并且由于严重腐蚀,需要对其进行改造,因此现有海上结构的退役、拆除和更换对运营公司和承包商都提出了技术和经济方面的挑战。由于这些平台的年龄,技术/工程数据的可用性很小,通常需要从头开始开发。本文的重点是重量工程以及在没有构建信息的平台上开发此类数据所面临的挑战。本文还涉及了执行项目的不同阶段,包括在国家石油建设公司(NPCC)在孟买高油田成功执行Brownfield工程期间应用的拆除工程策略,使用不同的安装辅助设备来促进拆除等。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Demolition of Offshore Wellhead Topsides - Weight Engineering Challenges
Some of the platforms installed in offshore fields in India have exceeded their design lifespan but continues to operate. For these platforms to continue operating safely and successfully, major revamp is required. As the wellheads are in operation beyond their intended lifespan and requires revamping due to their heavily corroded state, decommissioning, removal and replacement of existing offshore structures presents technical and economic challenges to Operating Company's and Contractors, alike. Due to the age of these platforms, availability of technical/engineering data is minimal and often needs to be developed from scratch. The focus of this paper is on Weight Engineering and challenges in developing such data for a platform without as built information. The paper also touches on the different stages of executing the project including demolition engineering strategies applied, use of different installation aids to facilitate demolition etc during successful execution of Brownfield works in Mumbai High field by National Petroleum Construction Company (NPCC).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Three-Dimensional Visualization of Oil Displacement by Foam in Porous Media Maximizing Condensate Recovery With Proven Cost Simulation for a Giant UAE Field: Base Study to Estimate Productivity between Horizontal and Vertical Wells Rationalization of Flares at Terminal Island A Geoengineering Approach to Maximum Reservoir Contact Wells Design: Case Study in a Carbonate Reservoir Under Water and Miscible Gas Injection Maximizing Brine Recovery After the Displacement of Reservoir Drill-in Fluids to Reduce Well Cost Via New, Alternate Technology In a Reservoir Offshore Abu Dhabi
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1