适用性监测对提高采收率规划的影响

J. Moreno, Yunlong Liu, Oluwale Talabi, O. Gurpinar, M. Kristensen, G. Goh, M. Paydayesh
{"title":"适用性监测对提高采收率规划的影响","authors":"J. Moreno, Yunlong Liu, Oluwale Talabi, O. Gurpinar, M. Kristensen, G. Goh, M. Paydayesh","doi":"10.2118/207937-ms","DOIUrl":null,"url":null,"abstract":"\n Challenges in the design of efficient EOR field pilots have been discussed and documented in the industry, particularly when it comes to optimization of monitoring plans for technical and economical perspectives. This paper explores the benefits of pilot planning where the monitoring/control strategies are included in the early stages of the design to reduce risk of measurements ambiguity and ensure good quality pilot results evaluation. It addresses the use of new and existing technology in monitoring by highlighting the advantages and challenges of each alternative including potential pairing of complementary options to achieve the pilot objectives including illustration of the use of continuous and sporadic measurements on the evaluation.\n The proposed approach starts with a review of reservoir performance, heterogeneity and pilot objectives to ascertain the plausible monitoring technologies/strategies to aid during the pilot de-risking, followed by the identification of adequate novel and mature monitoring options, which are specific to EOR type and measurement nature (permanent, time lapse, etc.). Advantages of incorporating the monitoring strategy as integral part of the pilot design, as well as evaluation of the effectiveness/viability in the presence of uncertainty of the selected monitoring alternatives are discussed providing a reference of suitable/plausible EOR specific technologies. The paper illustrates the importance of selecting monitoring alternatives that feed off each other and the importance of using fit-for-purpose evaluation algorithms and a digitally enabled, structured approach to analyze and democratize pilot results and enable actionable decisions in operations.","PeriodicalId":10967,"journal":{"name":"Day 1 Mon, November 15, 2021","volume":"52 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2021-12-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Impact of Fit-for-Purpose Monitoring on EOR Planning\",\"authors\":\"J. Moreno, Yunlong Liu, Oluwale Talabi, O. Gurpinar, M. Kristensen, G. Goh, M. Paydayesh\",\"doi\":\"10.2118/207937-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Challenges in the design of efficient EOR field pilots have been discussed and documented in the industry, particularly when it comes to optimization of monitoring plans for technical and economical perspectives. This paper explores the benefits of pilot planning where the monitoring/control strategies are included in the early stages of the design to reduce risk of measurements ambiguity and ensure good quality pilot results evaluation. It addresses the use of new and existing technology in monitoring by highlighting the advantages and challenges of each alternative including potential pairing of complementary options to achieve the pilot objectives including illustration of the use of continuous and sporadic measurements on the evaluation.\\n The proposed approach starts with a review of reservoir performance, heterogeneity and pilot objectives to ascertain the plausible monitoring technologies/strategies to aid during the pilot de-risking, followed by the identification of adequate novel and mature monitoring options, which are specific to EOR type and measurement nature (permanent, time lapse, etc.). Advantages of incorporating the monitoring strategy as integral part of the pilot design, as well as evaluation of the effectiveness/viability in the presence of uncertainty of the selected monitoring alternatives are discussed providing a reference of suitable/plausible EOR specific technologies. The paper illustrates the importance of selecting monitoring alternatives that feed off each other and the importance of using fit-for-purpose evaluation algorithms and a digitally enabled, structured approach to analyze and democratize pilot results and enable actionable decisions in operations.\",\"PeriodicalId\":10967,\"journal\":{\"name\":\"Day 1 Mon, November 15, 2021\",\"volume\":\"52 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Mon, November 15, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/207937-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, November 15, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/207937-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

业内已经讨论并记录了高效EOR现场导流器设计中的挑战,特别是从技术和经济角度优化监测计划时。本文探讨了试点计划的好处,其中监测/控制策略包括在设计的早期阶段,以减少测量模糊的风险,并确保高质量的试点结果评估。它通过强调每种备选方案的优点和挑战,包括可能配对的互补备选方案来实现试点目标,阐述在监测中使用新的和现有的技术,并说明在评价中使用连续和零星测量的情况。该方法首先回顾油藏性能、非均质性和试验目标,以确定可行的监测技术/策略,以帮助在试验过程中降低风险,然后确定适当的新颖和成熟的监测方案,这些方案针对提高采收率类型和测量性质(永久性、延时等)。讨论了将监测策略作为试点设计的组成部分的优势,以及在所选监测方案存在不确定性的情况下对有效性/可行性的评估,提供了合适/合理的EOR特定技术的参考。本文阐述了选择相互补充的监测替代方案的重要性,以及使用适合目的的评估算法和数字化的结构化方法来分析和民主化试点结果,并在运营中实现可操作决策的重要性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Impact of Fit-for-Purpose Monitoring on EOR Planning
Challenges in the design of efficient EOR field pilots have been discussed and documented in the industry, particularly when it comes to optimization of monitoring plans for technical and economical perspectives. This paper explores the benefits of pilot planning where the monitoring/control strategies are included in the early stages of the design to reduce risk of measurements ambiguity and ensure good quality pilot results evaluation. It addresses the use of new and existing technology in monitoring by highlighting the advantages and challenges of each alternative including potential pairing of complementary options to achieve the pilot objectives including illustration of the use of continuous and sporadic measurements on the evaluation. The proposed approach starts with a review of reservoir performance, heterogeneity and pilot objectives to ascertain the plausible monitoring technologies/strategies to aid during the pilot de-risking, followed by the identification of adequate novel and mature monitoring options, which are specific to EOR type and measurement nature (permanent, time lapse, etc.). Advantages of incorporating the monitoring strategy as integral part of the pilot design, as well as evaluation of the effectiveness/viability in the presence of uncertainty of the selected monitoring alternatives are discussed providing a reference of suitable/plausible EOR specific technologies. The paper illustrates the importance of selecting monitoring alternatives that feed off each other and the importance of using fit-for-purpose evaluation algorithms and a digitally enabled, structured approach to analyze and democratize pilot results and enable actionable decisions in operations.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Produced Water Reuse for Drilling and Completion Fluids Using Ion Exchange Resins Human Factors in HSE Performance – Role of User-Friendly HSE Documentation How Do Bankruptcies in the Shale Sector Induce Operators to Focus on Value Creation? Unconventional Waste & Flare Gas Recovery System UFGRS in New Circular Economy Transformation Management Office as a Vehicle to Accelerate Digital Transformation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1