在英国新昆斯费里渡口推出北进高架桥:设计和施工

Héctor Bernardo, Steve Thompson, Antonio Vázquez, A. Ward, David Taylor, J. Bullingham
{"title":"在英国新昆斯费里渡口推出北进高架桥:设计和施工","authors":"Héctor Bernardo, Steve Thompson, Antonio Vázquez, A. Ward, David Taylor, J. Bullingham","doi":"10.1680/JBREN.18.00018","DOIUrl":null,"url":null,"abstract":"Launching is a bridge erection method that provides significant advantages when there is difficult underdeck access for falsework, crane and heavy plant. In such cases, assembling the deck in a mor...","PeriodicalId":44437,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","volume":"12 1","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2019-05-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Launched north approach viaduct in the new Queensferry crossing, UK: design and construction\",\"authors\":\"Héctor Bernardo, Steve Thompson, Antonio Vázquez, A. Ward, David Taylor, J. Bullingham\",\"doi\":\"10.1680/JBREN.18.00018\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Launching is a bridge erection method that provides significant advantages when there is difficult underdeck access for falsework, crane and heavy plant. In such cases, assembling the deck in a mor...\",\"PeriodicalId\":44437,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Bridge Engineering\",\"volume\":\"12 1\",\"pages\":\"\"},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2019-05-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Bridge Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/JBREN.18.00018\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/JBREN.18.00018","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 2

摘要

下水是一种桥梁架设方法,在桥下难以进入的桥面、吊车和重型设备中具有明显的优势。在这种情况下,将甲板组装在一个更…
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Launched north approach viaduct in the new Queensferry crossing, UK: design and construction
Launching is a bridge erection method that provides significant advantages when there is difficult underdeck access for falsework, crane and heavy plant. In such cases, assembling the deck in a mor...
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.00
自引率
10.00%
发文量
48
期刊最新文献
Hybrid machine learning model for prediction of vertical deflection of composite bridges A control chart to evaluate the control effect of a bridge under active control Design of stone masonry bridges in European treatises: Part 1 – The geometrical configuration Extreme fjord-crossings development in the E39 coastal highway route project – a review The replacement of the Kosciuszko Bridge
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1