{"title":"商用现货设备使用对电磁干扰(EMI)控制要求的影响","authors":"R. Stoner","doi":"10.1109/ISEMC.1992.626159","DOIUrl":null,"url":null,"abstract":"With the continued need to use commercial off-the-shelf equipment, the EM1 impact must be considered. The responsibility of meeting contractual requirements for EM1 standards using commercial equipment usually falls on the contractor. This can have a major cost impact on any program using these EM1 standards. Case histories show omission of specific EM1 requirements caused failures during EM1 testing. This has had a cost impact on these programs.","PeriodicalId":93568,"journal":{"name":"IEEE International Symposium on Electromagnetic Compatibility : [proceedings]. IEEE International Symposium on Electromagnetic Compatibility","volume":"6 1","pages":"518-519"},"PeriodicalIF":0.0000,"publicationDate":"1992-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Impact Of The Use Of Commercial Off-the-shelf Equipment On The Requirements For Electromagnetic Interference (EMI) Control\",\"authors\":\"R. Stoner\",\"doi\":\"10.1109/ISEMC.1992.626159\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With the continued need to use commercial off-the-shelf equipment, the EM1 impact must be considered. The responsibility of meeting contractual requirements for EM1 standards using commercial equipment usually falls on the contractor. This can have a major cost impact on any program using these EM1 standards. Case histories show omission of specific EM1 requirements caused failures during EM1 testing. This has had a cost impact on these programs.\",\"PeriodicalId\":93568,\"journal\":{\"name\":\"IEEE International Symposium on Electromagnetic Compatibility : [proceedings]. IEEE International Symposium on Electromagnetic Compatibility\",\"volume\":\"6 1\",\"pages\":\"518-519\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1992-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE International Symposium on Electromagnetic Compatibility : [proceedings]. IEEE International Symposium on Electromagnetic Compatibility\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISEMC.1992.626159\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE International Symposium on Electromagnetic Compatibility : [proceedings]. IEEE International Symposium on Electromagnetic Compatibility","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISEMC.1992.626159","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Impact Of The Use Of Commercial Off-the-shelf Equipment On The Requirements For Electromagnetic Interference (EMI) Control
With the continued need to use commercial off-the-shelf equipment, the EM1 impact must be considered. The responsibility of meeting contractual requirements for EM1 standards using commercial equipment usually falls on the contractor. This can have a major cost impact on any program using these EM1 standards. Case histories show omission of specific EM1 requirements caused failures during EM1 testing. This has had a cost impact on these programs.