Ado-Ekiti 11/0.415 kV配电网采用小容量变压器的技术经济效果

Ademayowa Francis Oni, M. R. Adu
{"title":"Ado-Ekiti 11/0.415 kV配电网采用小容量变压器的技术经济效果","authors":"Ademayowa Francis Oni, M. R. Adu","doi":"10.4028/p-1tgphO","DOIUrl":null,"url":null,"abstract":"The major portion power loss in power system occurs in the components of low voltage (LV) networks. Low voltage distribution system (LVDS) configuration has been observed to contribute significantly to power loss and unacceptable voltage drop in the system due to its structure and higher current flow in the network. The adoption of small capacity transformers as high voltage distribution system (HVDS) configuration is increasingly applied to the network for power loss reduction and the improvement of voltage profile. This study aims to evaluate the technical and economic implication of the use of HVDS configuration on Ado-Ekiti 11/0.415 kV power distribution networks and provide necessary recommendations. The network data was obtained and modeled on NEPLAN software for simulation and technical evaluation of the networks. The existing LV lines were upgraded to high voltage (HV) and remodeled with small capacity transformers and comparative analysis of the technical and economic effects of the networks were carried out. The results obtained showed that there could be feeder capacity increase of 92.03 kW and power loss reduction of 347.17 kW and 459.72 kVar following reconfiguration from LVDS to HVDS. The losses in the transformers and lines were significantly reduced by 37.8% for HVDS configuration when compared with the LVDS configuration. The voltage profile was significantly improved with voltage deviations in the range of ± 0.01 to ± 0.03 of bus voltage for the HVDS network when compared to the existing network. The cost of implementation of the HVDS network substation was calculated to be ₦807,238,715.50 and with the combination of annual savings and an increment in tariff of ₦5/kWh in the billing charge of unit energy consumption resulted in a payback period of 2 to 3 years for the estimated capital investment. This study showed that technical performance of HVDS implementation on the Ado-Ekiti network feeder was better than that of the existing network.","PeriodicalId":7184,"journal":{"name":"Advanced Engineering Forum","volume":"25 1","pages":"73 - 87"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Techno-Economical Effects of Adopting Small Capacity Transformers on Ado-Ekiti 11/0.415 kV Power Distribution Networks\",\"authors\":\"Ademayowa Francis Oni, M. R. Adu\",\"doi\":\"10.4028/p-1tgphO\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The major portion power loss in power system occurs in the components of low voltage (LV) networks. Low voltage distribution system (LVDS) configuration has been observed to contribute significantly to power loss and unacceptable voltage drop in the system due to its structure and higher current flow in the network. The adoption of small capacity transformers as high voltage distribution system (HVDS) configuration is increasingly applied to the network for power loss reduction and the improvement of voltage profile. This study aims to evaluate the technical and economic implication of the use of HVDS configuration on Ado-Ekiti 11/0.415 kV power distribution networks and provide necessary recommendations. The network data was obtained and modeled on NEPLAN software for simulation and technical evaluation of the networks. The existing LV lines were upgraded to high voltage (HV) and remodeled with small capacity transformers and comparative analysis of the technical and economic effects of the networks were carried out. The results obtained showed that there could be feeder capacity increase of 92.03 kW and power loss reduction of 347.17 kW and 459.72 kVar following reconfiguration from LVDS to HVDS. The losses in the transformers and lines were significantly reduced by 37.8% for HVDS configuration when compared with the LVDS configuration. The voltage profile was significantly improved with voltage deviations in the range of ± 0.01 to ± 0.03 of bus voltage for the HVDS network when compared to the existing network. The cost of implementation of the HVDS network substation was calculated to be ₦807,238,715.50 and with the combination of annual savings and an increment in tariff of ₦5/kWh in the billing charge of unit energy consumption resulted in a payback period of 2 to 3 years for the estimated capital investment. This study showed that technical performance of HVDS implementation on the Ado-Ekiti network feeder was better than that of the existing network.\",\"PeriodicalId\":7184,\"journal\":{\"name\":\"Advanced Engineering Forum\",\"volume\":\"25 1\",\"pages\":\"73 - 87\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Advanced Engineering Forum\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4028/p-1tgphO\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Advanced Engineering Forum","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4028/p-1tgphO","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

电力系统的大部分功率损耗发生在低压电网的各组成部分。低压配电系统(LVDS)配置由于其结构和较大的网络电流,对系统的功率损耗和不可接受的电压降有很大的影响。采用小容量变压器作为高压配电系统的配置,越来越多地应用于电网中,以降低电力损耗,改善电压分布。本研究旨在评估在Ado-Ekiti 11/0.415 kV配电网中使用HVDS配置的技术和经济意义,并提出必要的建议。利用NEPLAN软件对网络数据进行建模,对网络进行仿真和技术评价。对现有低压输电线路进行了高压改造和小容量变压器改造,并对改造后的技术经济效果进行了对比分析。结果表明,由LVDS改造为HVDS后,可使馈线容量增加92.03 kW,减少功率损耗347.17 kW和459.72 kVar。与LVDS配置相比,HVDS配置的变压器和线路损耗显著降低了37.8%。与现有网络相比,HVDS网络的电压分布得到了显著改善,电压偏差在±0.01至±0.03的范围内。HVDS网络变电站的实施成本计算为807,238,715.50奈拉,加上每年节省的费用和单位能耗计费费用每千瓦时增加奈拉5奈拉的电费,预计资本投资的回收期为2至3年。研究表明,在Ado-Ekiti馈线上实现HVDS的技术性能优于现有网络。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Techno-Economical Effects of Adopting Small Capacity Transformers on Ado-Ekiti 11/0.415 kV Power Distribution Networks
The major portion power loss in power system occurs in the components of low voltage (LV) networks. Low voltage distribution system (LVDS) configuration has been observed to contribute significantly to power loss and unacceptable voltage drop in the system due to its structure and higher current flow in the network. The adoption of small capacity transformers as high voltage distribution system (HVDS) configuration is increasingly applied to the network for power loss reduction and the improvement of voltage profile. This study aims to evaluate the technical and economic implication of the use of HVDS configuration on Ado-Ekiti 11/0.415 kV power distribution networks and provide necessary recommendations. The network data was obtained and modeled on NEPLAN software for simulation and technical evaluation of the networks. The existing LV lines were upgraded to high voltage (HV) and remodeled with small capacity transformers and comparative analysis of the technical and economic effects of the networks were carried out. The results obtained showed that there could be feeder capacity increase of 92.03 kW and power loss reduction of 347.17 kW and 459.72 kVar following reconfiguration from LVDS to HVDS. The losses in the transformers and lines were significantly reduced by 37.8% for HVDS configuration when compared with the LVDS configuration. The voltage profile was significantly improved with voltage deviations in the range of ± 0.01 to ± 0.03 of bus voltage for the HVDS network when compared to the existing network. The cost of implementation of the HVDS network substation was calculated to be ₦807,238,715.50 and with the combination of annual savings and an increment in tariff of ₦5/kWh in the billing charge of unit energy consumption resulted in a payback period of 2 to 3 years for the estimated capital investment. This study showed that technical performance of HVDS implementation on the Ado-Ekiti network feeder was better than that of the existing network.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Implications of the Global Race to Net-Zero by 2050 for the Strategic Fleet of Coal-Fired Power Plants in SADC Optimum Design of Mix Ratio of Premixed Iron Tailings Mortar Based on Response Surface Method Evaluation and Comparison of Breach Parametric Model for Embankment Dams Numerical Modeling of Cantilever Retaining Wall Using EPS Geofoam An Investigation of the Mechanical and Durability Properties of Hollow Concrete Blocks Made with Copper Mine Tailings as a Partial Cement Replacement
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1