过程监控对道路建设基础设施项目中标承包商能力评价与绩效关系的调节作用

James Mushori, C. Rambo, C. Wafula
{"title":"过程监控对道路建设基础设施项目中标承包商能力评价与绩效关系的调节作用","authors":"James Mushori, C. Rambo, C. Wafula","doi":"10.37421/JCDE.2020.10.341","DOIUrl":null,"url":null,"abstract":"The quality of road infrastructure is dependent on many factors including materials used and contractor competency in terms of managing the project and the team. Poor workmanship has been mostly blamed on these factors. Kenya and Africa at large has realized the road to grow economy is through infrastructural development projects hence investing billions of money into this noble course. Although many studies have been conducted on road construction, the focus is always drawn on the implementation phase thereby forgetting the post-delivery phase. The study aimed to assess the moderating influence of process monitoring on the relationship between contractors’ capacity evaluation in tender award and performance of road construction infrastructural project in the context of Nairobi county, Kenya. The study used both a cross-sectional descriptive survey research design and correlation research design. A sample size of 210 was obtained from a target population of 460 comprising of 106 contractors and 104 Public Service Vehicles (PSVs) drivers. Stratified sampling and proportionate sampling were used to arrive at the right sample size. Simple random sampling helped in distribution of research instruments. Pilot test was done to ensure validity and reliability of research instruments is achieved. Validity of instruments was done by use of content validity to ensure research questions aided in achieving research objective. To maintain reliability of data, Cronbach alpha values of above 0.7 were deemed important. Questionnaires were administered to contractors registered by National Construction Authority of Kenya whereas structured interview schedules were distributed to the drivers in Nairobi County. In total, 153(72.8%) of response rate was recorded. Quantitative data was descriptively analyzed whereby measure of central tendency and dispersion was done through means and standard deviation. Karl Pearson Correlation Coefficient was used to show relationship between variables under the study. Hypothesis was tested by use of Analysis of Variance (ANOVA) whereby multiple regression and hierarchical analysis were conducted to explain the direction, the strength and the nature of relationship between the study variables. The results showed that in both step one and two, F-values were statistically significant. That in step one R=0.826, adjusted R2=0.673, F(4,148)=79.226, p=0.000<0.05 and in step two: R=0.837, adjusted R2=0.690, F(5,147)=68.520, p=0.000<0.05. This implies that contractors’ capacity evaluation in tender award alone explains 67.3% of variation in road performance. However when put together with process monitoring they explain 69.0% of total variation in road performance. Thus the null hypothesis was rejected and alternate hypothesis accepted that process monitoring significantly moderates the relationship between combined factors of contractors’ capacity evaluation in tender award and performance of road construction infrastructural projects. The study concludes that process monitoring indeed moderates contractors’ capacity to carry out construction work and hence road performance. The study further recommends that future road construction should aim to incorporate process monitoring in its operations to ensure that the right inputs or resources are utilized to yield quality outputs and that the required standards, policies and laws are adhered to.","PeriodicalId":52256,"journal":{"name":"Tumu yu Huanjing Gongcheng Xuebao/Journal of Civil and Environmental Engineering","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Moderating Influence of Process Monitoring on the Relationship between Contractors Capacity Evaluation in Tender Award and Performance of Road Construction Infrastructural Projects\",\"authors\":\"James Mushori, C. Rambo, C. Wafula\",\"doi\":\"10.37421/JCDE.2020.10.341\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The quality of road infrastructure is dependent on many factors including materials used and contractor competency in terms of managing the project and the team. Poor workmanship has been mostly blamed on these factors. Kenya and Africa at large has realized the road to grow economy is through infrastructural development projects hence investing billions of money into this noble course. Although many studies have been conducted on road construction, the focus is always drawn on the implementation phase thereby forgetting the post-delivery phase. The study aimed to assess the moderating influence of process monitoring on the relationship between contractors’ capacity evaluation in tender award and performance of road construction infrastructural project in the context of Nairobi county, Kenya. The study used both a cross-sectional descriptive survey research design and correlation research design. A sample size of 210 was obtained from a target population of 460 comprising of 106 contractors and 104 Public Service Vehicles (PSVs) drivers. Stratified sampling and proportionate sampling were used to arrive at the right sample size. Simple random sampling helped in distribution of research instruments. Pilot test was done to ensure validity and reliability of research instruments is achieved. Validity of instruments was done by use of content validity to ensure research questions aided in achieving research objective. To maintain reliability of data, Cronbach alpha values of above 0.7 were deemed important. Questionnaires were administered to contractors registered by National Construction Authority of Kenya whereas structured interview schedules were distributed to the drivers in Nairobi County. In total, 153(72.8%) of response rate was recorded. Quantitative data was descriptively analyzed whereby measure of central tendency and dispersion was done through means and standard deviation. Karl Pearson Correlation Coefficient was used to show relationship between variables under the study. Hypothesis was tested by use of Analysis of Variance (ANOVA) whereby multiple regression and hierarchical analysis were conducted to explain the direction, the strength and the nature of relationship between the study variables. The results showed that in both step one and two, F-values were statistically significant. That in step one R=0.826, adjusted R2=0.673, F(4,148)=79.226, p=0.000<0.05 and in step two: R=0.837, adjusted R2=0.690, F(5,147)=68.520, p=0.000<0.05. This implies that contractors’ capacity evaluation in tender award alone explains 67.3% of variation in road performance. However when put together with process monitoring they explain 69.0% of total variation in road performance. Thus the null hypothesis was rejected and alternate hypothesis accepted that process monitoring significantly moderates the relationship between combined factors of contractors’ capacity evaluation in tender award and performance of road construction infrastructural projects. The study concludes that process monitoring indeed moderates contractors’ capacity to carry out construction work and hence road performance. The study further recommends that future road construction should aim to incorporate process monitoring in its operations to ensure that the right inputs or resources are utilized to yield quality outputs and that the required standards, policies and laws are adhered to.\",\"PeriodicalId\":52256,\"journal\":{\"name\":\"Tumu yu Huanjing Gongcheng Xuebao/Journal of Civil and Environmental Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Tumu yu Huanjing Gongcheng Xuebao/Journal of Civil and Environmental Engineering\",\"FirstCategoryId\":\"1087\",\"ListUrlMain\":\"https://doi.org/10.37421/JCDE.2020.10.341\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Tumu yu Huanjing Gongcheng Xuebao/Journal of Civil and Environmental Engineering","FirstCategoryId":"1087","ListUrlMain":"https://doi.org/10.37421/JCDE.2020.10.341","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 2

摘要

道路基础设施的质量取决于许多因素,包括使用的材料和承包商在管理项目和团队方面的能力。做工不佳主要归咎于这些因素。肯尼亚和整个非洲已经意识到经济增长的道路是通过基础设施发展项目,因此在这一崇高的道路上投入了数十亿美元。虽然对道路建设进行了许多研究,但重点总是放在实施阶段,而忘记了交付后阶段。本研究旨在评估过程监控对肯亚奈洛比郡道路基建项目中标承包商能力评价与绩效关系的调节作用。本研究采用了横断面描述性调查研究设计和相关性研究设计。从460名目标人口(包括106名承办商和104名公共服务车辆司机)中抽取了210名样本。采用分层抽样和比例抽样来获得正确的样本量。简单的随机抽样有助于研究仪器的分发。为确保研究仪器的有效性和可靠性,进行了先导试验。通过使用内容效度来完成工具的效度,以确保研究问题有助于实现研究目标。为了保持数据的可靠性,Cronbach alpha值大于0.7被认为是重要的。向肯尼亚国家建设局注册的承包商发放了问卷,同时向内罗毕县的司机分发了结构化的访谈时间表。共记录到153例(72.8%)的应答率。定量数据进行描述性分析,通过均值和标准差测量集中趋势和离散度。使用Karl Pearson相关系数来表示研究中变量之间的关系。采用方差分析(ANOVA)对假设进行检验,通过多元回归和层次分析来解释研究变量之间关系的方向、强度和性质。结果表明,在第一步和第二步中,f值具有统计学意义。第一步R=0.826,调整后R2=0.673, F(4,148)=79.226, p=0.000<0.05;第二步R=0.837,调整后R2=0.690, F(5,147)=68.520, p=0.000<0.05。这意味着,仅承包商在投标授予中的能力评估就解释了67.3%的道路性能变化。然而,当与过程监控结合在一起时,它们解释了道路性能总变化的69.0%。因此,拒绝零假设,接受交替假设,即过程监控显著调节了承包商中标能力评价综合因素与道路建设基础设施项目绩效之间的关系。该研究的结论是,过程监控确实会调节承包商进行建筑工作的能力,从而调节道路性能。研究报告进一步建议,今后的道路建设应在其业务中纳入过程监测,以确保利用正确的投入或资源产生高质量的产出,并遵守所需的标准、政策和法律。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Moderating Influence of Process Monitoring on the Relationship between Contractors Capacity Evaluation in Tender Award and Performance of Road Construction Infrastructural Projects
The quality of road infrastructure is dependent on many factors including materials used and contractor competency in terms of managing the project and the team. Poor workmanship has been mostly blamed on these factors. Kenya and Africa at large has realized the road to grow economy is through infrastructural development projects hence investing billions of money into this noble course. Although many studies have been conducted on road construction, the focus is always drawn on the implementation phase thereby forgetting the post-delivery phase. The study aimed to assess the moderating influence of process monitoring on the relationship between contractors’ capacity evaluation in tender award and performance of road construction infrastructural project in the context of Nairobi county, Kenya. The study used both a cross-sectional descriptive survey research design and correlation research design. A sample size of 210 was obtained from a target population of 460 comprising of 106 contractors and 104 Public Service Vehicles (PSVs) drivers. Stratified sampling and proportionate sampling were used to arrive at the right sample size. Simple random sampling helped in distribution of research instruments. Pilot test was done to ensure validity and reliability of research instruments is achieved. Validity of instruments was done by use of content validity to ensure research questions aided in achieving research objective. To maintain reliability of data, Cronbach alpha values of above 0.7 were deemed important. Questionnaires were administered to contractors registered by National Construction Authority of Kenya whereas structured interview schedules were distributed to the drivers in Nairobi County. In total, 153(72.8%) of response rate was recorded. Quantitative data was descriptively analyzed whereby measure of central tendency and dispersion was done through means and standard deviation. Karl Pearson Correlation Coefficient was used to show relationship between variables under the study. Hypothesis was tested by use of Analysis of Variance (ANOVA) whereby multiple regression and hierarchical analysis were conducted to explain the direction, the strength and the nature of relationship between the study variables. The results showed that in both step one and two, F-values were statistically significant. That in step one R=0.826, adjusted R2=0.673, F(4,148)=79.226, p=0.000<0.05 and in step two: R=0.837, adjusted R2=0.690, F(5,147)=68.520, p=0.000<0.05. This implies that contractors’ capacity evaluation in tender award alone explains 67.3% of variation in road performance. However when put together with process monitoring they explain 69.0% of total variation in road performance. Thus the null hypothesis was rejected and alternate hypothesis accepted that process monitoring significantly moderates the relationship between combined factors of contractors’ capacity evaluation in tender award and performance of road construction infrastructural projects. The study concludes that process monitoring indeed moderates contractors’ capacity to carry out construction work and hence road performance. The study further recommends that future road construction should aim to incorporate process monitoring in its operations to ensure that the right inputs or resources are utilized to yield quality outputs and that the required standards, policies and laws are adhered to.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.30
自引率
0.00%
发文量
5346
期刊最新文献
استخراج منحنیهای شدت-مدت-فراوانی به کمک نظریه فرکتال و ارزیابی اثر تغییر اقلیم بر آن (مطالعه موردی: بوشهر) Investigation of the effect of gabion-shaped obstacles on sedimentation Probabilistic zoning of hydraulic performance of water distribution network by applying key parameter uncertainty Evaluation of doubler plates effects on shear bearing behavior of RCS connections مقایسه عملکرد ترافیکی، مصرف سوخت، و آلایندگی تقاطع دارای چراغ و دوربرگردان در بزرگراههای شش-خطه
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1