Michelle Günther, André Scholz, P. Schmidt, A. Fay, Patrick Diekhake, Damian Eduardo Diaz Fuentes, U. Becker
{"title":"建筑自动化系统的需求工程和建模","authors":"Michelle Günther, André Scholz, P. Schmidt, A. Fay, Patrick Diekhake, Damian Eduardo Diaz Fuentes, U. Becker","doi":"10.1109/ETFA.2016.7733675","DOIUrl":null,"url":null,"abstract":"The planning and layout of a building automation system is a complex process characterized by the selection, application and interconnection of multiple different functions. Planning mistakes are often not recognized before the initial operation of the building. In order to allow an earlier fault and function analysis and to ease planning, an approach for an efficient development of a functional model for the building automation system has been developed. This functional model offers not only a simulation of the building automation system but also the automatic configuration of the hardware components of the building automation system.","PeriodicalId":6483,"journal":{"name":"2016 IEEE 21st International Conference on Emerging Technologies and Factory Automation (ETFA)","volume":"7 1","pages":"1-8"},"PeriodicalIF":0.0000,"publicationDate":"2016-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Requirements engineering and modelling for building automation systems\",\"authors\":\"Michelle Günther, André Scholz, P. Schmidt, A. Fay, Patrick Diekhake, Damian Eduardo Diaz Fuentes, U. Becker\",\"doi\":\"10.1109/ETFA.2016.7733675\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The planning and layout of a building automation system is a complex process characterized by the selection, application and interconnection of multiple different functions. Planning mistakes are often not recognized before the initial operation of the building. In order to allow an earlier fault and function analysis and to ease planning, an approach for an efficient development of a functional model for the building automation system has been developed. This functional model offers not only a simulation of the building automation system but also the automatic configuration of the hardware components of the building automation system.\",\"PeriodicalId\":6483,\"journal\":{\"name\":\"2016 IEEE 21st International Conference on Emerging Technologies and Factory Automation (ETFA)\",\"volume\":\"7 1\",\"pages\":\"1-8\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE 21st International Conference on Emerging Technologies and Factory Automation (ETFA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ETFA.2016.7733675\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE 21st International Conference on Emerging Technologies and Factory Automation (ETFA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ETFA.2016.7733675","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Requirements engineering and modelling for building automation systems
The planning and layout of a building automation system is a complex process characterized by the selection, application and interconnection of multiple different functions. Planning mistakes are often not recognized before the initial operation of the building. In order to allow an earlier fault and function analysis and to ease planning, an approach for an efficient development of a functional model for the building automation system has been developed. This functional model offers not only a simulation of the building automation system but also the automatic configuration of the hardware components of the building automation system.