基于失效模式效应与分析(fmea)方法的印尼新渡轮建造风险评估

Z. Ariany, T. Pitana, I. Vanany
{"title":"基于失效模式效应与分析(fmea)方法的印尼新渡轮建造风险评估","authors":"Z. Ariany, T. Pitana, I. Vanany","doi":"10.5937/jaes0-43711","DOIUrl":null,"url":null,"abstract":"This study aims to identify, calculate the impact rating, and mitigate the effects on new ferry construction in Indonesian shipyards. The Risk Matrix method and Failure Mode and Effect Analysis (FMEA) are employed to analyze risk levels. Data were collected through field observations and interviews regarding risks and potential delays in ship components. The results reveal 23 potential hazard sources, with two risks having the highest Risk Priority Number (RPN) values. Assessment based on the quality control section that causes delays in the arrival of ME/AE/pumps and other mechanical equipment 366.18. Assessment of the Project Leader process Delay in the assembly/fabrication/erect process 519.49. Part of production leadership Delay in assembly/fabrication/erecting processes 317.37. Based on the assessment of the three sections, high-risk potential occurs in ship hull work, Delays in assembly/fabrication/erect processes, and machining work Delays in the Arrival of ME/AE/Pumps and Machine Equipment. The risk matrix indicates high-risk ratings for component delays in ship hull work, medium risk for machining work, and the low risk for electrical work and other components. The next step is to assess the potential of domestic components and design a component availability model for new shipbuilding, including imported components. This research offers valuable insights for RoRo ferry shipping stakeholders, helping them understand the mechanisms causing delays in new ship construction and guiding efforts to reduce the risk of failure.","PeriodicalId":35468,"journal":{"name":"Journal of Applied Engineering Science","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-09-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"RISK ASSESSMENT OF NEW FERRY SHIP CONSTRUCTION IN INDONESIA USING THE FAILURE MODE EFFECT AND ANALYSIS (FMEA) METHOD\",\"authors\":\"Z. Ariany, T. Pitana, I. Vanany\",\"doi\":\"10.5937/jaes0-43711\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study aims to identify, calculate the impact rating, and mitigate the effects on new ferry construction in Indonesian shipyards. The Risk Matrix method and Failure Mode and Effect Analysis (FMEA) are employed to analyze risk levels. Data were collected through field observations and interviews regarding risks and potential delays in ship components. The results reveal 23 potential hazard sources, with two risks having the highest Risk Priority Number (RPN) values. Assessment based on the quality control section that causes delays in the arrival of ME/AE/pumps and other mechanical equipment 366.18. Assessment of the Project Leader process Delay in the assembly/fabrication/erect process 519.49. Part of production leadership Delay in assembly/fabrication/erecting processes 317.37. Based on the assessment of the three sections, high-risk potential occurs in ship hull work, Delays in assembly/fabrication/erect processes, and machining work Delays in the Arrival of ME/AE/Pumps and Machine Equipment. The risk matrix indicates high-risk ratings for component delays in ship hull work, medium risk for machining work, and the low risk for electrical work and other components. The next step is to assess the potential of domestic components and design a component availability model for new shipbuilding, including imported components. This research offers valuable insights for RoRo ferry shipping stakeholders, helping them understand the mechanisms causing delays in new ship construction and guiding efforts to reduce the risk of failure.\",\"PeriodicalId\":35468,\"journal\":{\"name\":\"Journal of Applied Engineering Science\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Applied Engineering Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5937/jaes0-43711\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Applied Engineering Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5937/jaes0-43711","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

本研究旨在识别,计算影响等级,并减轻对印尼造船厂新渡轮建设的影响。采用风险矩阵法和失效模式与影响分析法(FMEA)对风险等级进行分析。通过实地观察和访谈收集有关船舶部件风险和潜在延迟的数据。结果揭示了23个潜在危险源,其中两个风险的风险优先级(RPN)值最高。对导致ME/AE/泵和其他机械设备到货延迟的质量控制部门进行评估。评估项目负责人在装配/制造/安装过程中的工艺延迟519.49。部分生产领导在装配/制造/安装过程中延误317.37。根据这三个部分的评估,高风险的潜在风险发生在船体工作,装配/制造/安装过程的延迟,以及机械加工工作ME/AE/泵和机器设备的到达延迟。风险矩阵表示船体工作中部件延迟的高风险等级,加工工作的中等风险等级,电气工作和其他部件的低风险等级。下一步是评估国产零部件的潜力,并为包括进口零部件在内的新造船设计一个零部件可用性模型。这项研究为滚装轮渡航运利益相关者提供了有价值的见解,帮助他们了解导致新船建造延迟的机制,并指导降低失败风险的努力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
RISK ASSESSMENT OF NEW FERRY SHIP CONSTRUCTION IN INDONESIA USING THE FAILURE MODE EFFECT AND ANALYSIS (FMEA) METHOD
This study aims to identify, calculate the impact rating, and mitigate the effects on new ferry construction in Indonesian shipyards. The Risk Matrix method and Failure Mode and Effect Analysis (FMEA) are employed to analyze risk levels. Data were collected through field observations and interviews regarding risks and potential delays in ship components. The results reveal 23 potential hazard sources, with two risks having the highest Risk Priority Number (RPN) values. Assessment based on the quality control section that causes delays in the arrival of ME/AE/pumps and other mechanical equipment 366.18. Assessment of the Project Leader process Delay in the assembly/fabrication/erect process 519.49. Part of production leadership Delay in assembly/fabrication/erecting processes 317.37. Based on the assessment of the three sections, high-risk potential occurs in ship hull work, Delays in assembly/fabrication/erect processes, and machining work Delays in the Arrival of ME/AE/Pumps and Machine Equipment. The risk matrix indicates high-risk ratings for component delays in ship hull work, medium risk for machining work, and the low risk for electrical work and other components. The next step is to assess the potential of domestic components and design a component availability model for new shipbuilding, including imported components. This research offers valuable insights for RoRo ferry shipping stakeholders, helping them understand the mechanisms causing delays in new ship construction and guiding efforts to reduce the risk of failure.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Applied Engineering Science
Journal of Applied Engineering Science Engineering-Engineering (all)
CiteScore
2.00
自引率
0.00%
发文量
122
审稿时长
12 weeks
期刊介绍: Since 2002 iipp build cooperation with its clients established on wealthy experience, interchangeable respect and trust and permanently arrangement with the purpose of successfully realization of projects recognizable according to good organization and high quality of provided favors. Working as unique team of highly motivated experts, Institute iipp provides to its customers the most high-quality solutions in domain of engineering consulting.
期刊最新文献
SIMULATION MODELING OF LOGGING HARVESTER MOVEMENTS DURING SELECTIVE LOGGING RISK MITIGATION AS A MEDIATING FACTOR IN THE RELATIONSHIP BETWEEN TOP MANAGEMENT SUPPORT AND CONSTRUCTION PROJECT PERFORMANCE 3D DOCUMENTATION OF CULTURAL HERITAGE USING TERRESTRIAL LASER SCANNING ROAD TRAFFIC ACCIDENTS FACTOR ON RURAL ARTERIAL ROADS RESTORATION OF LARGE MODULAR TEETH OF BALL MILL GEARS BY ELECTRO-SLAG SURFACE
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1