大型太阳能光伏LCOE综合分解方法

A. Ramírez, Diego Mejía Giraldo, N. M. Galeano
{"title":"大型太阳能光伏LCOE综合分解方法","authors":"A. Ramírez, Diego Mejía Giraldo, N. M. Galeano","doi":"10.29047/01225383.69","DOIUrl":null,"url":null,"abstract":"espanolRESUMEN Este articulo presenta una metodologia para evaluar los costos nivelados de la electricidad (Levelized Cost of Electricity) LCOE , en plantas fotovoltaicas (Photovoltaic - PV) a gran escala. Para ello se propone una desagregacion detallada de los LCOE a partir de una taxonomia rigurosa que evalua los Costos de Inversion (Investment Cost - IC )y los Gastos de Operacion (Operation and Maintenance - O&M). Partiendo de la estructura de la Administracion de Informacion Energetica (Energy Information Administration - EIA) que desglosa los IC en cinco componentes, hemos anadido un nivel adicional de desagregacion denominado elementos. Asimismo, una nueva estructura para desagregar los costos de O&M es presentada. La metodologia es evaluada en plantas PV de 20 MW y 150 MW PV hipoteticamente ubicadas en el municipio de Uribia (Guajira Colombia). Tambien se desarrolla un analisis de sensibilidad deterministico usando factores como el Costo Promedio Ponderado de Capital (WACC - Weighted Average Capital Cost), la energia producida, los gastos de O&M y los IC con el animo de facilitar las decisiones de los inversionistas. portuguesRESUMO Este artigo apresenta uma metodologia para avaliar os custos nivelados da eletricidade (Levelized Cost of Electricity-LCOE), em plantas fotovoltaicas (Photovoltaic - PV) em grande escala. Para esse proposito se propoe uma desagregacao detalhada dos LCOE a partir de uma rigorosa taxonomia que avalia os Custos de Investimento (IC, por suas siglas em ingles) e as Despesas de Operacao (Operations and Maintenance - O&M). Partindo da estrutura da Administracao da Informacao Energetica (Energy Information Administration - EIA) que desagrega os IC em cinco componentes, adicionamos outro nivel de desagregacao chamado de \"elementos\". Tambem e apresentada uma nova estrutura para desagregar os custos de O&M. A metodologia e avaliada em plantas PV de 20MW e 150 MW PV hipoteticamente localizadas no municipio de Uribia (Guajira - Colombia). Da mesma forma, desenvolve-se uma analise de sensibilidade deterministica empregando fatores como o Custo Medio ponderado de Capital (Weighted Average Capital Cost - WACC), a energia produzida, as despesas de O&M e os IC para viabilizar as decisoes dos investidores. EnglishABSTRACT This paper presents a breakdown cost methodology to evaluate Levelized Costs of Electricity for large-scale Photovoltaic (PV) plants. The breakdown is based on a comprehensive taxonomy to evaluate Investment Costs (IC) and Operation and Maintenance (O&M) expenditures. We added an IC disaggregation level, called elements, on top of the five-component breakdown of the Energy Information Administration (EIA). In addition, a novel structure for disaggregating O&M costs is also proposed. The methodology is evaluated over a 20-MW and a 150-MW PV power plant hypothetically placed in the municipality of Uribia (Guajira Colombia). Also deterministic sensitivity analysis based on discount rate (WACC, Weighted Average Capital Cost), energy generated, O&M costs and IC is performed to aid investors in their decisions.","PeriodicalId":10235,"journal":{"name":"Ciencia Tecnologia y Futuro","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2017-01-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"Large-scale solar PV LCOE comprehensive breakdown methodology\",\"authors\":\"A. Ramírez, Diego Mejía Giraldo, N. M. Galeano\",\"doi\":\"10.29047/01225383.69\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"espanolRESUMEN Este articulo presenta una metodologia para evaluar los costos nivelados de la electricidad (Levelized Cost of Electricity) LCOE , en plantas fotovoltaicas (Photovoltaic - PV) a gran escala. Para ello se propone una desagregacion detallada de los LCOE a partir de una taxonomia rigurosa que evalua los Costos de Inversion (Investment Cost - IC )y los Gastos de Operacion (Operation and Maintenance - O&M). Partiendo de la estructura de la Administracion de Informacion Energetica (Energy Information Administration - EIA) que desglosa los IC en cinco componentes, hemos anadido un nivel adicional de desagregacion denominado elementos. Asimismo, una nueva estructura para desagregar los costos de O&M es presentada. La metodologia es evaluada en plantas PV de 20 MW y 150 MW PV hipoteticamente ubicadas en el municipio de Uribia (Guajira Colombia). Tambien se desarrolla un analisis de sensibilidad deterministico usando factores como el Costo Promedio Ponderado de Capital (WACC - Weighted Average Capital Cost), la energia producida, los gastos de O&M y los IC con el animo de facilitar las decisiones de los inversionistas. portuguesRESUMO Este artigo apresenta uma metodologia para avaliar os custos nivelados da eletricidade (Levelized Cost of Electricity-LCOE), em plantas fotovoltaicas (Photovoltaic - PV) em grande escala. Para esse proposito se propoe uma desagregacao detalhada dos LCOE a partir de uma rigorosa taxonomia que avalia os Custos de Investimento (IC, por suas siglas em ingles) e as Despesas de Operacao (Operations and Maintenance - O&M). Partindo da estrutura da Administracao da Informacao Energetica (Energy Information Administration - EIA) que desagrega os IC em cinco componentes, adicionamos outro nivel de desagregacao chamado de \\\"elementos\\\". Tambem e apresentada uma nova estrutura para desagregar os custos de O&M. A metodologia e avaliada em plantas PV de 20MW e 150 MW PV hipoteticamente localizadas no municipio de Uribia (Guajira - Colombia). Da mesma forma, desenvolve-se uma analise de sensibilidade deterministica empregando fatores como o Custo Medio ponderado de Capital (Weighted Average Capital Cost - WACC), a energia produzida, as despesas de O&M e os IC para viabilizar as decisoes dos investidores. EnglishABSTRACT This paper presents a breakdown cost methodology to evaluate Levelized Costs of Electricity for large-scale Photovoltaic (PV) plants. The breakdown is based on a comprehensive taxonomy to evaluate Investment Costs (IC) and Operation and Maintenance (O&M) expenditures. We added an IC disaggregation level, called elements, on top of the five-component breakdown of the Energy Information Administration (EIA). In addition, a novel structure for disaggregating O&M costs is also proposed. The methodology is evaluated over a 20-MW and a 150-MW PV power plant hypothetically placed in the municipality of Uribia (Guajira Colombia). Also deterministic sensitivity analysis based on discount rate (WACC, Weighted Average Capital Cost), energy generated, O&M costs and IC is performed to aid investors in their decisions.\",\"PeriodicalId\":10235,\"journal\":{\"name\":\"Ciencia Tecnologia y Futuro\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-01-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Ciencia Tecnologia y Futuro\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29047/01225383.69\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ciencia Tecnologia y Futuro","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29047/01225383.69","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

摘要

本文提出了一种评估大型光伏电站(光伏- PV) LCOE水平电力成本的方法。为了实现这一目标,本文提出了LCOE的详细分解,从一个严格的分类中评估投资成本(IC)和运营和维护成本(O&M)。根据能源信息管理局(EIA)的结构,将cis分为五个组成部分,我们增加了一个额外的分解层次,称为元素。此外,还提出了一种分解运维成本的新结构。该方法在假设位于乌里比亚市(哥伦比亚瓜希拉)的20兆瓦和150兆瓦光伏电站进行了评估。本文还利用加权平均资本成本(WACC)、能源生产、运维费用和IC等因素进行了确定性敏感性分析,以促进投资者的决策。本文提出了一种评估大型光伏电站(光伏)电力水平成本(lcoe)的方法。为此目的,我们提出了LCOE的详细分解,从一个严格的分类,评估投资成本(IC)和运营和维护费用(O&M)。从能源信息管理局(EIA)的结构开始,将ci分解为五个组成部分,我们增加了另一个分解级别,称为“元素”。提出了一种新的结构来分解运维成本。该方法在假设位于乌里比亚市(瓜希拉-哥伦比亚)的20MW和150mw光伏电站进行了评估。以同样的方式,利用加权平均资本成本(WACC)、生产能源、运维费用和IC等因素进行确定性敏感性分析,以使投资者的决策可行。本文提出了一种用于评估大型光伏(PV)电厂的电力成本的降低成本方法。这一分类是基于评估投资成本(IC)和运营和维护(O&M)支出的综合分类。我们在能源信息管理局(EIA)的五个组成部分的分解上增加了一个IC分解级别,称为元素。此外,还提出了一种分解运维费用的新结构。对假设位于乌里比亚市(哥伦比亚瓜希拉)的20兆瓦和150兆瓦光伏电站进行了评估。此外,基于贴现率(加权平均资本成本)、能源产生、运维成本和综合投资的确定性敏感性分析也有助于投资者作出决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Large-scale solar PV LCOE comprehensive breakdown methodology
espanolRESUMEN Este articulo presenta una metodologia para evaluar los costos nivelados de la electricidad (Levelized Cost of Electricity) LCOE , en plantas fotovoltaicas (Photovoltaic - PV) a gran escala. Para ello se propone una desagregacion detallada de los LCOE a partir de una taxonomia rigurosa que evalua los Costos de Inversion (Investment Cost - IC )y los Gastos de Operacion (Operation and Maintenance - O&M). Partiendo de la estructura de la Administracion de Informacion Energetica (Energy Information Administration - EIA) que desglosa los IC en cinco componentes, hemos anadido un nivel adicional de desagregacion denominado elementos. Asimismo, una nueva estructura para desagregar los costos de O&M es presentada. La metodologia es evaluada en plantas PV de 20 MW y 150 MW PV hipoteticamente ubicadas en el municipio de Uribia (Guajira Colombia). Tambien se desarrolla un analisis de sensibilidad deterministico usando factores como el Costo Promedio Ponderado de Capital (WACC - Weighted Average Capital Cost), la energia producida, los gastos de O&M y los IC con el animo de facilitar las decisiones de los inversionistas. portuguesRESUMO Este artigo apresenta uma metodologia para avaliar os custos nivelados da eletricidade (Levelized Cost of Electricity-LCOE), em plantas fotovoltaicas (Photovoltaic - PV) em grande escala. Para esse proposito se propoe uma desagregacao detalhada dos LCOE a partir de uma rigorosa taxonomia que avalia os Custos de Investimento (IC, por suas siglas em ingles) e as Despesas de Operacao (Operations and Maintenance - O&M). Partindo da estrutura da Administracao da Informacao Energetica (Energy Information Administration - EIA) que desagrega os IC em cinco componentes, adicionamos outro nivel de desagregacao chamado de "elementos". Tambem e apresentada uma nova estrutura para desagregar os custos de O&M. A metodologia e avaliada em plantas PV de 20MW e 150 MW PV hipoteticamente localizadas no municipio de Uribia (Guajira - Colombia). Da mesma forma, desenvolve-se uma analise de sensibilidade deterministica empregando fatores como o Custo Medio ponderado de Capital (Weighted Average Capital Cost - WACC), a energia produzida, as despesas de O&M e os IC para viabilizar as decisoes dos investidores. EnglishABSTRACT This paper presents a breakdown cost methodology to evaluate Levelized Costs of Electricity for large-scale Photovoltaic (PV) plants. The breakdown is based on a comprehensive taxonomy to evaluate Investment Costs (IC) and Operation and Maintenance (O&M) expenditures. We added an IC disaggregation level, called elements, on top of the five-component breakdown of the Energy Information Administration (EIA). In addition, a novel structure for disaggregating O&M costs is also proposed. The methodology is evaluated over a 20-MW and a 150-MW PV power plant hypothetically placed in the municipality of Uribia (Guajira Colombia). Also deterministic sensitivity analysis based on discount rate (WACC, Weighted Average Capital Cost), energy generated, O&M costs and IC is performed to aid investors in their decisions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Assessment of reducing sugars production from agro-industrial wastes by batch and semicontinuous subcritical water hydrolysis CFD simulation of HPAM EOR solutions mechanical degradation by restrictions in turbulent flow Petrofacies and diagenetic processes of la Victoria formation (Early Miocene), Dina oil field, upper Magdalena valley basin, Colombia. Demand-side management strategies based on energy key perfomance indicators in real-time: Case study Gas transport at dense phase conditions for the development of deepwater fields in the Colombian Caribbean sea
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1