矿浆固结计中沿滩煤尾砂的岩土特性和恒定加载固结速率

S. Islam, David J. Williams, Chenming Zhang, M. Llano-Serna
{"title":"矿浆固结计中沿滩煤尾砂的岩土特性和恒定加载固结速率","authors":"S. Islam, David J. Williams, Chenming Zhang, M. Llano-Serna","doi":"10.1080/25726668.2021.1880351","DOIUrl":null,"url":null,"abstract":"ABSTRACT The conventional disposal of slurried tailings in a tailings storage facility (TSF) leads to the formation of a beach, on which the tailings sort hydraulically, settle, consolidate, and desiccate upon exposure. Basic geotechnical testing, such as specific gravity, Atterberg limits, and particle size distribution, found that there was no particular trend of changes in the tailings properties down the beach. The settled sediment found in a settling test was slurry-like and unsuitable for conventional oedometer testing. Constant rate of loading (CRL) consolidation testing is more representative of the continuous disposal of tailings slurry than conventional step loading. Consolidation testing in a slurry consolidometer was conducted and captured from a slurry-like to soil-like state. A slow rate of loading increased the test time, while a too quick rate of loading built up very high excess PWP. The test results showed different stages of consolidation, depending on excess PWP development and dissipation, and applied stress.","PeriodicalId":44166,"journal":{"name":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","volume":"68 1","pages":"67 - 80"},"PeriodicalIF":1.8000,"publicationDate":"2021-02-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Geotechnical characterisation of coal tailings down the beach and constant rate of loading consolidation in a slurry consolidometer\",\"authors\":\"S. Islam, David J. Williams, Chenming Zhang, M. Llano-Serna\",\"doi\":\"10.1080/25726668.2021.1880351\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT The conventional disposal of slurried tailings in a tailings storage facility (TSF) leads to the formation of a beach, on which the tailings sort hydraulically, settle, consolidate, and desiccate upon exposure. Basic geotechnical testing, such as specific gravity, Atterberg limits, and particle size distribution, found that there was no particular trend of changes in the tailings properties down the beach. The settled sediment found in a settling test was slurry-like and unsuitable for conventional oedometer testing. Constant rate of loading (CRL) consolidation testing is more representative of the continuous disposal of tailings slurry than conventional step loading. Consolidation testing in a slurry consolidometer was conducted and captured from a slurry-like to soil-like state. A slow rate of loading increased the test time, while a too quick rate of loading built up very high excess PWP. The test results showed different stages of consolidation, depending on excess PWP development and dissipation, and applied stress.\",\"PeriodicalId\":44166,\"journal\":{\"name\":\"Mining Technology-Transactions of the Institutions of Mining and Metallurgy\",\"volume\":\"68 1\",\"pages\":\"67 - 80\"},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2021-02-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mining Technology-Transactions of the Institutions of Mining and Metallurgy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/25726668.2021.1880351\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MINING & MINERAL PROCESSING\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mining Technology-Transactions of the Institutions of Mining and Metallurgy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/25726668.2021.1880351","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MINING & MINERAL PROCESSING","Score":null,"Total":0}
引用次数: 3

摘要

在尾矿储存设施(TSF)中,泥浆尾砂的常规处置导致形成一个滩,尾砂在滩上进行水力分类、沉降、固结和暴露后干燥。基本的岩土工程测试,如比重、阿特伯格极限和粒度分布,发现在海滩上的尾矿性质没有特别的变化趋势。沉降试验中发现的沉降沉积物呈浆状,不适合常规的粘度计试验。恒速加载(CRL)固结试验比常规的分级加载更能代表尾矿浆体的连续处置。在泥浆固结计中进行了固结试验,并从类似泥浆的状态捕获到类似土壤的状态。缓慢的加载速度增加了测试时间,而太快的加载速度会增加非常高的多余PWP。试验结果显示了不同的固结阶段,这取决于多余PWP的发展和消散,以及施加的应力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Geotechnical characterisation of coal tailings down the beach and constant rate of loading consolidation in a slurry consolidometer
ABSTRACT The conventional disposal of slurried tailings in a tailings storage facility (TSF) leads to the formation of a beach, on which the tailings sort hydraulically, settle, consolidate, and desiccate upon exposure. Basic geotechnical testing, such as specific gravity, Atterberg limits, and particle size distribution, found that there was no particular trend of changes in the tailings properties down the beach. The settled sediment found in a settling test was slurry-like and unsuitable for conventional oedometer testing. Constant rate of loading (CRL) consolidation testing is more representative of the continuous disposal of tailings slurry than conventional step loading. Consolidation testing in a slurry consolidometer was conducted and captured from a slurry-like to soil-like state. A slow rate of loading increased the test time, while a too quick rate of loading built up very high excess PWP. The test results showed different stages of consolidation, depending on excess PWP development and dissipation, and applied stress.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
2.20
自引率
9.10%
发文量
5
期刊最新文献
Digital twins in the minerals industry – a comprehensive review Mining Metaverse – a future collaborative tool for best practice mining Reliability evaluation of CAN-bus connectors with tailored testing Sustainable open pit fleet management system: integrating economic and environmental objectives into truck allocation A Genetic algorithm scheme for large scale open-pit mine production scheduling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1