萨巴吉塔区域垃圾填埋场渗滤液生成分析及排气管道布置

P. Gayatri, E. Pandebesie
{"title":"萨巴吉塔区域垃圾填埋场渗滤液生成分析及排气管道布置","authors":"P. Gayatri, E. Pandebesie","doi":"10.12962/j20882033.v31i2.5643","DOIUrl":null,"url":null,"abstract":"Sarbagita Regional Landfill is a regional landfill which is located in Denpasar. At this time, there were closure and landfill arrangement in Sarbagita Regional Landfill. The utilization of ex-landfill land used as green open space requires leachate and gas handling due to the process of waste decomposition is still ongoing. Analysis of gas and leachate potential is needed for further management so that the surrounding environment is not polluted. Analysis of potential gas generation using a triangular method and analysis of leachate generation potential using the Thornwaite method. The maximum gas production occurs in 2023 at 43.367.678,25 m3/year. Gas production gradually declined until it’s estimated to run out in 2034. The number of gas pipe points needed is 19 points. Treatment methods that can be considered are the gas conversion to electricity method and the flaring method. The results of the calculation from leachate potential is 3.84 liters/second. The result will be used to planning a leachate processing installation. Processing system through 4 processing stages, namely processing in anaerobic ponds, facultative ponds, aerobic ponds, and biofilter ponds. Besides considering the technical aspects of technology selection, we also considered the Regional Government’s capability and commitment as the manager.","PeriodicalId":14549,"journal":{"name":"IPTEK: The Journal for Technology and Science","volume":"64 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2020-08-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Leachate Production Analysis and Arrangement of Gas Vent Pipelines in Ex-Landfill Sarbagita Regional Landfill\",\"authors\":\"P. Gayatri, E. Pandebesie\",\"doi\":\"10.12962/j20882033.v31i2.5643\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Sarbagita Regional Landfill is a regional landfill which is located in Denpasar. At this time, there were closure and landfill arrangement in Sarbagita Regional Landfill. The utilization of ex-landfill land used as green open space requires leachate and gas handling due to the process of waste decomposition is still ongoing. Analysis of gas and leachate potential is needed for further management so that the surrounding environment is not polluted. Analysis of potential gas generation using a triangular method and analysis of leachate generation potential using the Thornwaite method. The maximum gas production occurs in 2023 at 43.367.678,25 m3/year. Gas production gradually declined until it’s estimated to run out in 2034. The number of gas pipe points needed is 19 points. Treatment methods that can be considered are the gas conversion to electricity method and the flaring method. The results of the calculation from leachate potential is 3.84 liters/second. The result will be used to planning a leachate processing installation. Processing system through 4 processing stages, namely processing in anaerobic ponds, facultative ponds, aerobic ponds, and biofilter ponds. Besides considering the technical aspects of technology selection, we also considered the Regional Government’s capability and commitment as the manager.\",\"PeriodicalId\":14549,\"journal\":{\"name\":\"IPTEK: The Journal for Technology and Science\",\"volume\":\"64 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-08-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IPTEK: The Journal for Technology and Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.12962/j20882033.v31i2.5643\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IPTEK: The Journal for Technology and Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12962/j20882033.v31i2.5643","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

萨巴吉塔地区垃圾填埋场是位于登巴萨的一个地区垃圾填埋场。此时,萨巴吉塔区域堆填区已进行关闭和填埋安排。由于废物分解过程仍在进行中,故将前堆填区用作绿色休憩用地,需要处理渗滤液及气体。需要分析气体和渗滤液的潜力,以便进一步管理,以免污染周围环境。用三角法分析天然气生成潜力,用Thornwaite法分析渗滤液生成潜力。最大天然气产量将在2023年达到43.367.678,25 m3/年。天然气产量逐渐下降,预计到2034年将耗尽。所需燃气管道点数为19个点。可考虑的处理方法有气转电法和燃除法。渗滤液电位计算结果为3.84升/秒。结果将用于规划一个渗滤液处理装置。处理系统通过4个处理阶段,即在厌氧池、兼性池、好氧池和生物滤池中进行处理。除了考虑技术选择的技术方面,我们还考虑了区域政府作为管理者的能力和承诺。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Leachate Production Analysis and Arrangement of Gas Vent Pipelines in Ex-Landfill Sarbagita Regional Landfill
Sarbagita Regional Landfill is a regional landfill which is located in Denpasar. At this time, there were closure and landfill arrangement in Sarbagita Regional Landfill. The utilization of ex-landfill land used as green open space requires leachate and gas handling due to the process of waste decomposition is still ongoing. Analysis of gas and leachate potential is needed for further management so that the surrounding environment is not polluted. Analysis of potential gas generation using a triangular method and analysis of leachate generation potential using the Thornwaite method. The maximum gas production occurs in 2023 at 43.367.678,25 m3/year. Gas production gradually declined until it’s estimated to run out in 2034. The number of gas pipe points needed is 19 points. Treatment methods that can be considered are the gas conversion to electricity method and the flaring method. The results of the calculation from leachate potential is 3.84 liters/second. The result will be used to planning a leachate processing installation. Processing system through 4 processing stages, namely processing in anaerobic ponds, facultative ponds, aerobic ponds, and biofilter ponds. Besides considering the technical aspects of technology selection, we also considered the Regional Government’s capability and commitment as the manager.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
17
审稿时长
9 weeks
期刊最新文献
Deposition Silver Based Thin Film on Stainless Steel 316l as Antimicrobial Agent Using Electrophoretic Deposition Method Probabilistic Scheduling Based On Hybrid Bayesian Network–Program Evaluation Review Technique, Analysis of Level Team Effectiveness in The Implementation of Scrum Using Evidence-Based Management (Case Study: Company A as A Fintech Industry) Project Delay Risk Assessment User-Centered Design-Based Approach in Scheduling Management Application Design and Development
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1