J. Sandberg, David Bishop, Louisa S. Man, D. A. Smith
{"title":"英国阿伯丁迪河大桥建设带来的设计挑战","authors":"J. Sandberg, David Bishop, Louisa S. Man, D. A. Smith","doi":"10.1680/jbren.21.00022","DOIUrl":null,"url":null,"abstract":"This paper sets out the challenges from the perspective of the designer associated with the construction of the River Dee bridge built by the balanced cantilever method. The importance of managing ...","PeriodicalId":44437,"journal":{"name":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","volume":"99 1","pages":""},"PeriodicalIF":1.5000,"publicationDate":"2021-07-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Design Challenges resulting from the construction of the River Dee Bridge, Aberdeen, UK\",\"authors\":\"J. Sandberg, David Bishop, Louisa S. Man, D. A. Smith\",\"doi\":\"10.1680/jbren.21.00022\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper sets out the challenges from the perspective of the designer associated with the construction of the River Dee bridge built by the balanced cantilever method. The importance of managing ...\",\"PeriodicalId\":44437,\"journal\":{\"name\":\"Proceedings of the Institution of Civil Engineers-Bridge Engineering\",\"volume\":\"99 1\",\"pages\":\"\"},\"PeriodicalIF\":1.5000,\"publicationDate\":\"2021-07-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the Institution of Civil Engineers-Bridge Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/jbren.21.00022\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the Institution of Civil Engineers-Bridge Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/jbren.21.00022","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
Design Challenges resulting from the construction of the River Dee Bridge, Aberdeen, UK
This paper sets out the challenges from the perspective of the designer associated with the construction of the River Dee bridge built by the balanced cantilever method. The importance of managing ...