规划在JL上3臂交叉路口的交通信号。伊玛目Bonjol - JL。阿卜杜勒·拉赫曼·萨利赫的切割手

H. Azwansyah
{"title":"规划在JL上3臂交叉路口的交通信号。伊玛目Bonjol - JL。阿卜杜勒·拉赫曼·萨利赫的切割手","authors":"H. Azwansyah","doi":"10.26418/ELKHA.V9I2.22731","DOIUrl":null,"url":null,"abstract":"Abstract– This study aim to plan traffic light at intersection three arm of Imam Bonjol Street – Abdul Rahman Saleh Street in Pontianak City. This Study require data of intersection geometric and vehicle traffic obtained of field survey. This study yield planning of traffic light 3 phase with cycle time 160 second. Green time of actual for phase 1 (Street of Jl. Imam Bonjol (a)) equal to 66 second, for phase 2 (Street of Jl. Imam Bonjol (b)) equal to 63 second,  and for phase 3 (Street of Abdul Rahman Saleh) equal to 10 second. Keywords-   Traffic Light, Cycle Time, Green Time","PeriodicalId":32754,"journal":{"name":"Elkha Jurnal Teknik Elektro","volume":"45 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-04-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Perencanaan Sinyal Lalu Lintas Persimpangan Tiga Lengan Pada JL. Imam Bonjol – JL. Abdul Rahman Saleh Kota Pontianak\",\"authors\":\"H. Azwansyah\",\"doi\":\"10.26418/ELKHA.V9I2.22731\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract– This study aim to plan traffic light at intersection three arm of Imam Bonjol Street – Abdul Rahman Saleh Street in Pontianak City. This Study require data of intersection geometric and vehicle traffic obtained of field survey. This study yield planning of traffic light 3 phase with cycle time 160 second. Green time of actual for phase 1 (Street of Jl. Imam Bonjol (a)) equal to 66 second, for phase 2 (Street of Jl. Imam Bonjol (b)) equal to 63 second,  and for phase 3 (Street of Abdul Rahman Saleh) equal to 10 second. Keywords-   Traffic Light, Cycle Time, Green Time\",\"PeriodicalId\":32754,\"journal\":{\"name\":\"Elkha Jurnal Teknik Elektro\",\"volume\":\"45 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Elkha Jurnal Teknik Elektro\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.26418/ELKHA.V9I2.22731\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Elkha Jurnal Teknik Elektro","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26418/ELKHA.V9I2.22731","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

摘要:本研究旨在规划Pontianak市Imam Bonjol街- Abdul Rahman Saleh街交叉口三支交通灯。本研究需要现场调查获得的交叉口几何数据和车辆交通数据。本文研究了循环时间为160秒的红绿灯三相规划。第一期实际开绿灯时间(jr街)伊玛目Bonjol (a))等于66秒,用于第2阶段(Jl街)。Imam Bonjol (b)等于63秒,第3阶段(Abdul Rahman Saleh街)等于10秒。关键词:交通灯,循环时间,绿灯时间
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Perencanaan Sinyal Lalu Lintas Persimpangan Tiga Lengan Pada JL. Imam Bonjol – JL. Abdul Rahman Saleh Kota Pontianak
Abstract– This study aim to plan traffic light at intersection three arm of Imam Bonjol Street – Abdul Rahman Saleh Street in Pontianak City. This Study require data of intersection geometric and vehicle traffic obtained of field survey. This study yield planning of traffic light 3 phase with cycle time 160 second. Green time of actual for phase 1 (Street of Jl. Imam Bonjol (a)) equal to 66 second, for phase 2 (Street of Jl. Imam Bonjol (b)) equal to 63 second,  and for phase 3 (Street of Abdul Rahman Saleh) equal to 10 second. Keywords-   Traffic Light, Cycle Time, Green Time
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
23
审稿时长
10 weeks
期刊最新文献
Multi-oscillations Detection for Process Variables Based on K-Nearest Neighbor Interference Analysis Between 5G System and Fixed Satellite Service in the 28 GHz Band Heading control for quadruped stair climbing based on PD controller for the KRSRI competition Optimization Objective Function Corona Discharge Acoustic Using Fuzzy c-Means (FcM ) Temperature and Humidity Control System for Pole-Mounted Metering Circuit Breaker with Artificial Neural Network Methods
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1