浮动泥浆厂中心:海上钻井物流的游戏规则改变者

Ernesto S. Gomez, H. Osorio, I. Obi, Ismaeel Musa
{"title":"浮动泥浆厂中心:海上钻井物流的游戏规则改变者","authors":"Ernesto S. Gomez, H. Osorio, I. Obi, Ismaeel Musa","doi":"10.2523/iptc-20041-ms","DOIUrl":null,"url":null,"abstract":"\n Drilling offshore gas wells is a very challenging operation since it involves a high number of offshore rigs, mud losses into formation, well control and adverse weather conditions. All of which minimize the drilling efficiency on those wells with huge attendant cost, if no proper arrangement is put in place to mitigate these challenges.\n In the current setting where we can sometimes see rapid increase in offshore drilling operation challenges such as coping with severe drilling fluid losses into formations, the main challenge is to support offshore rigs with drilling fluid in a timely and seamless manner. As on-shore mud plant keeps up with a very high operational demand, launched and successfully implemented a new floating mud facility (\"HUB\") to improve supply and deliver mud materials and fluids to offshore drilling rigs.\n This floating mud and chemicals storage plant (HUB) spot successfully reduced transit times, minimized delays and nonproductive time previously experienced by the drilling rigs operating in offshore gas fields. These delays were due to late drilling fluid deliveries from the onshore mud plant and extended times to mix high-density fluids on the rigs. This innovative model guarantees significant savings in terms of saving mixing times, providing chemical storage capacity, consequently minimizing unnecessary rig site operations. There is also a significant reduction in environmental, health, safety, and risk exposure resulting in optimized shipping, distribution, back loading of drilling fluids, reduction in the utilization of supply vessels and rig resources, to support severe lost circulation or well control events.\n The HUB floating plant provides a full array of scalable fluids, mixing equipment and facilities to meet offshore operational requirements while eliminating the cost, extended lead-time, and specialized shipping. This plant encompasses a floating installation to mix and store drilling and completion fluids and chemicals. The HUB floating plant is equipped with twin mixing systems with the ability to mix and safely store more than 20,000 bbl of different fluid sets. It was recently utilized to mix high-density MICROMAX (manganese tetroxide) based completion fluid with excellent performance, despite the complexity of mixing over 2,500 metric tons (super-sacks), and still was able to handle different fluids seamlessly. This HUB is anchored within equal distance to the three largest gas fields. The reduction in delivery time is estimated to be 90% in both normal and emergency operations. Weighting materials and mud chemical storage capacity provides an additional platform to minimize rig deck utilization and drilling mud mixing construction capabilities, minimizing the huge coping pressure on the alternative onshore mud plant operations.\n Over the last 3 years of being in operation, the HUB floating plant has mixed more than 916,000 bbl of heavy mud and completion fluid, received over 19,000 bbl for storage, and stored up to 400,000 ft3 of barite, with more than 600,000 workhours, without any near misses, incidents, or accidents.","PeriodicalId":11058,"journal":{"name":"Day 2 Tue, January 14, 2020","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-01-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Floating Mud Plant HUB: A Game-Changer in Offshore Drilling Logistics\",\"authors\":\"Ernesto S. Gomez, H. Osorio, I. Obi, Ismaeel Musa\",\"doi\":\"10.2523/iptc-20041-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Drilling offshore gas wells is a very challenging operation since it involves a high number of offshore rigs, mud losses into formation, well control and adverse weather conditions. All of which minimize the drilling efficiency on those wells with huge attendant cost, if no proper arrangement is put in place to mitigate these challenges.\\n In the current setting where we can sometimes see rapid increase in offshore drilling operation challenges such as coping with severe drilling fluid losses into formations, the main challenge is to support offshore rigs with drilling fluid in a timely and seamless manner. As on-shore mud plant keeps up with a very high operational demand, launched and successfully implemented a new floating mud facility (\\\"HUB\\\") to improve supply and deliver mud materials and fluids to offshore drilling rigs.\\n This floating mud and chemicals storage plant (HUB) spot successfully reduced transit times, minimized delays and nonproductive time previously experienced by the drilling rigs operating in offshore gas fields. These delays were due to late drilling fluid deliveries from the onshore mud plant and extended times to mix high-density fluids on the rigs. This innovative model guarantees significant savings in terms of saving mixing times, providing chemical storage capacity, consequently minimizing unnecessary rig site operations. There is also a significant reduction in environmental, health, safety, and risk exposure resulting in optimized shipping, distribution, back loading of drilling fluids, reduction in the utilization of supply vessels and rig resources, to support severe lost circulation or well control events.\\n The HUB floating plant provides a full array of scalable fluids, mixing equipment and facilities to meet offshore operational requirements while eliminating the cost, extended lead-time, and specialized shipping. This plant encompasses a floating installation to mix and store drilling and completion fluids and chemicals. The HUB floating plant is equipped with twin mixing systems with the ability to mix and safely store more than 20,000 bbl of different fluid sets. It was recently utilized to mix high-density MICROMAX (manganese tetroxide) based completion fluid with excellent performance, despite the complexity of mixing over 2,500 metric tons (super-sacks), and still was able to handle different fluids seamlessly. This HUB is anchored within equal distance to the three largest gas fields. The reduction in delivery time is estimated to be 90% in both normal and emergency operations. Weighting materials and mud chemical storage capacity provides an additional platform to minimize rig deck utilization and drilling mud mixing construction capabilities, minimizing the huge coping pressure on the alternative onshore mud plant operations.\\n Over the last 3 years of being in operation, the HUB floating plant has mixed more than 916,000 bbl of heavy mud and completion fluid, received over 19,000 bbl for storage, and stored up to 400,000 ft3 of barite, with more than 600,000 workhours, without any near misses, incidents, or accidents.\",\"PeriodicalId\":11058,\"journal\":{\"name\":\"Day 2 Tue, January 14, 2020\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, January 14, 2020\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2523/iptc-20041-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, January 14, 2020","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/iptc-20041-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

钻井海上气井是一项非常具有挑战性的作业,因为它涉及到大量的海上钻机,泥浆流失到地层中,井控和恶劣的天气条件。如果没有适当的安排来缓解这些挑战,所有这些都会降低这些井的钻井效率,并带来巨大的成本。在当前的环境下,我们有时会看到海上钻井作业挑战的快速增加,例如应对严重的钻井液漏失到地层中,主要挑战是及时无缝地为海上钻井平台提供钻井液支持。由于陆上泥浆厂的作业需求非常高,因此推出并成功实施了一种新的浮动泥浆设施(HUB),以改善海上钻井平台的泥浆材料和流体的供应和输送。这种浮式泥浆和化学品储存装置(HUB)成功地减少了运输时间,最大限度地减少了海上气田钻井平台之前经历的延迟和非生产时间。这些延迟是由于陆上泥浆厂的钻井液交付延迟,以及在钻井平台上混合高密度流体的时间延长。这种创新的模式保证了在节省混合时间、提供化学储存能力方面的显著节省,从而最大限度地减少了不必要的钻井现场操作。在环境、健康、安全和风险暴露方面也有显著降低,从而优化了钻井液的运输、分配和回装,减少了供应船和钻机资源的利用率,以应对严重的漏失或井控事件。HUB浮式装置提供了一整套可扩展的流体、混合设备和设施,以满足海上作业要求,同时消除了成本、延长交货时间和专业化运输。该装置包括一个浮动装置,用于混合和储存钻井和完井流体和化学品。HUB浮式装置配备了双混合系统,能够混合并安全存储超过20,000桶不同的流体。最近,它被用于混合性能优异的高密度MICROMAX(四氧化锰)完井液,尽管混合的复杂性超过2500公吨(超级麻袋),但仍然能够无缝处理不同的流体。该枢纽锚定在与三个最大的天然气田相等的距离内。在正常和紧急情况下,交货时间估计减少90%。加重材料和泥浆化学储存能力提供了一个额外的平台,以最大限度地减少钻机甲板的利用率和钻井泥浆混合施工能力,最大限度地减少陆上泥浆厂作业的巨大应对压力。在过去3年的运营中,HUB浮式装置已经混合了超过91.6万桶重质泥浆和完井液,接收了超过1.9万桶的储存,储存了高达40万立方英尺的重晶石,工作时间超过60万小时,没有发生过任何未遂事故或事故。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Floating Mud Plant HUB: A Game-Changer in Offshore Drilling Logistics
Drilling offshore gas wells is a very challenging operation since it involves a high number of offshore rigs, mud losses into formation, well control and adverse weather conditions. All of which minimize the drilling efficiency on those wells with huge attendant cost, if no proper arrangement is put in place to mitigate these challenges. In the current setting where we can sometimes see rapid increase in offshore drilling operation challenges such as coping with severe drilling fluid losses into formations, the main challenge is to support offshore rigs with drilling fluid in a timely and seamless manner. As on-shore mud plant keeps up with a very high operational demand, launched and successfully implemented a new floating mud facility ("HUB") to improve supply and deliver mud materials and fluids to offshore drilling rigs. This floating mud and chemicals storage plant (HUB) spot successfully reduced transit times, minimized delays and nonproductive time previously experienced by the drilling rigs operating in offshore gas fields. These delays were due to late drilling fluid deliveries from the onshore mud plant and extended times to mix high-density fluids on the rigs. This innovative model guarantees significant savings in terms of saving mixing times, providing chemical storage capacity, consequently minimizing unnecessary rig site operations. There is also a significant reduction in environmental, health, safety, and risk exposure resulting in optimized shipping, distribution, back loading of drilling fluids, reduction in the utilization of supply vessels and rig resources, to support severe lost circulation or well control events. The HUB floating plant provides a full array of scalable fluids, mixing equipment and facilities to meet offshore operational requirements while eliminating the cost, extended lead-time, and specialized shipping. This plant encompasses a floating installation to mix and store drilling and completion fluids and chemicals. The HUB floating plant is equipped with twin mixing systems with the ability to mix and safely store more than 20,000 bbl of different fluid sets. It was recently utilized to mix high-density MICROMAX (manganese tetroxide) based completion fluid with excellent performance, despite the complexity of mixing over 2,500 metric tons (super-sacks), and still was able to handle different fluids seamlessly. This HUB is anchored within equal distance to the three largest gas fields. The reduction in delivery time is estimated to be 90% in both normal and emergency operations. Weighting materials and mud chemical storage capacity provides an additional platform to minimize rig deck utilization and drilling mud mixing construction capabilities, minimizing the huge coping pressure on the alternative onshore mud plant operations. Over the last 3 years of being in operation, the HUB floating plant has mixed more than 916,000 bbl of heavy mud and completion fluid, received over 19,000 bbl for storage, and stored up to 400,000 ft3 of barite, with more than 600,000 workhours, without any near misses, incidents, or accidents.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Effects of different ammonium lignosulfonate contents on the crystallization, rheological behaviors, and thermal and mechanical properties of ethylene propylene diene monomer/polypropylene/ammonium lignosulfonate composites Root cause analysis of cationic polymer additive efficiency decline in virgin and recycle containerboard mills Wheat straw as an alternative pulp fiber A new approach for the preparation of cellulose nanocrystals from bamboo pulp through extremely low acid hydrolysis Root traits and carbon input by sweet sorghum genotypes differs in two climatic conditions
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1