{"title":"具有阻塞和设置时间的排列流车间中的分支和定界方法","authors":"M. S. Nagano, M. Takano, João Vítor Silva Robazzi","doi":"10.5267/j.ijiec.2021.10.003","DOIUrl":null,"url":null,"abstract":"In this paper it is presented an improvement of the branch and bound algorithm for the permutation flow shop problem with blocking-in-process and setup times with the objective of minimizing the total flow time and tardiness, which is known to be NP-Hard when there are two or more machines involved. With that objective in mind, a new machine-based lower bound that exploits some structural properties of the problem. A database with 27 classes of problems, varying in number of jobs (n) and number of machines (m) was used to perform the computational experiments. Results show that the algorithm can deal with most of the problems with less than 20 jobs in less than one hour. Thus, the method proposed in this work can solve the scheduling of many applications in manufacturing environments with limited buffers and separated setup times.","PeriodicalId":51356,"journal":{"name":"International Journal of Industrial Engineering Computations","volume":"113 2 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2022-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"A branch and bound method in a permutation flow shop with blocking and setup times\",\"authors\":\"M. S. Nagano, M. Takano, João Vítor Silva Robazzi\",\"doi\":\"10.5267/j.ijiec.2021.10.003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper it is presented an improvement of the branch and bound algorithm for the permutation flow shop problem with blocking-in-process and setup times with the objective of minimizing the total flow time and tardiness, which is known to be NP-Hard when there are two or more machines involved. With that objective in mind, a new machine-based lower bound that exploits some structural properties of the problem. A database with 27 classes of problems, varying in number of jobs (n) and number of machines (m) was used to perform the computational experiments. Results show that the algorithm can deal with most of the problems with less than 20 jobs in less than one hour. Thus, the method proposed in this work can solve the scheduling of many applications in manufacturing environments with limited buffers and separated setup times.\",\"PeriodicalId\":51356,\"journal\":{\"name\":\"International Journal of Industrial Engineering Computations\",\"volume\":\"113 2 1\",\"pages\":\"\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2022-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Industrial Engineering Computations\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5267/j.ijiec.2021.10.003\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering Computations","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5267/j.ijiec.2021.10.003","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
A branch and bound method in a permutation flow shop with blocking and setup times
In this paper it is presented an improvement of the branch and bound algorithm for the permutation flow shop problem with blocking-in-process and setup times with the objective of minimizing the total flow time and tardiness, which is known to be NP-Hard when there are two or more machines involved. With that objective in mind, a new machine-based lower bound that exploits some structural properties of the problem. A database with 27 classes of problems, varying in number of jobs (n) and number of machines (m) was used to perform the computational experiments. Results show that the algorithm can deal with most of the problems with less than 20 jobs in less than one hour. Thus, the method proposed in this work can solve the scheduling of many applications in manufacturing environments with limited buffers and separated setup times.