Daria Karasalihović Sedlar, T. Kurevija, M. Macenić, Ivan Smajla
{"title":"成熟油田地热卤水开采的监管和经济挑战","authors":"Daria Karasalihović Sedlar, T. Kurevija, M. Macenić, Ivan Smajla","doi":"10.1080/15567249.2022.2097336","DOIUrl":null,"url":null,"abstract":"ABSTRACT The paper analyzes the technical solutions, economic feasibility and institutional aspects of geothermal energy use in a district heating system by retrofitting wells on a mature oil field based on the case study. The objective is to describe institutional procedures for brine production from the mature oil field. The research methodology includes the well data and the condition of the existing oil infrastructure analysis, to evaluate the brine production possibility. The methodology also analyzes existing hydrocarbon contracts. Institutional steps to obtain a geothermal concession on the brownfields are proposed. The hypothesis assumes that, with the legislation change, a vertical distribution of concessions for simultaneous production of oil and brine is achievable. The conclusion brings the novelty of this paper as the provision of guidelines for the development of the projects and the start of the production of brine from a mature oil field for the investors and the legal authorities.","PeriodicalId":51247,"journal":{"name":"Energy Sources Part B-Economics Planning and Policy","volume":"15 1","pages":""},"PeriodicalIF":3.1000,"publicationDate":"2022-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Regulatory and economic challenges in the production of geothermal brine from a mature oil field\",\"authors\":\"Daria Karasalihović Sedlar, T. Kurevija, M. Macenić, Ivan Smajla\",\"doi\":\"10.1080/15567249.2022.2097336\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT The paper analyzes the technical solutions, economic feasibility and institutional aspects of geothermal energy use in a district heating system by retrofitting wells on a mature oil field based on the case study. The objective is to describe institutional procedures for brine production from the mature oil field. The research methodology includes the well data and the condition of the existing oil infrastructure analysis, to evaluate the brine production possibility. The methodology also analyzes existing hydrocarbon contracts. Institutional steps to obtain a geothermal concession on the brownfields are proposed. The hypothesis assumes that, with the legislation change, a vertical distribution of concessions for simultaneous production of oil and brine is achievable. The conclusion brings the novelty of this paper as the provision of guidelines for the development of the projects and the start of the production of brine from a mature oil field for the investors and the legal authorities.\",\"PeriodicalId\":51247,\"journal\":{\"name\":\"Energy Sources Part B-Economics Planning and Policy\",\"volume\":\"15 1\",\"pages\":\"\"},\"PeriodicalIF\":3.1000,\"publicationDate\":\"2022-12-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Energy Sources Part B-Economics Planning and Policy\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.1080/15567249.2022.2097336\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Energy Sources Part B-Economics Planning and Policy","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.1080/15567249.2022.2097336","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
Regulatory and economic challenges in the production of geothermal brine from a mature oil field
ABSTRACT The paper analyzes the technical solutions, economic feasibility and institutional aspects of geothermal energy use in a district heating system by retrofitting wells on a mature oil field based on the case study. The objective is to describe institutional procedures for brine production from the mature oil field. The research methodology includes the well data and the condition of the existing oil infrastructure analysis, to evaluate the brine production possibility. The methodology also analyzes existing hydrocarbon contracts. Institutional steps to obtain a geothermal concession on the brownfields are proposed. The hypothesis assumes that, with the legislation change, a vertical distribution of concessions for simultaneous production of oil and brine is achievable. The conclusion brings the novelty of this paper as the provision of guidelines for the development of the projects and the start of the production of brine from a mature oil field for the investors and the legal authorities.
期刊介绍:
12 issues per year
Abstracted and/or indexed in: Applied Science & Technology Index; API Abstracts/Literature; Automatic Subject Index Citation; BIOSIS Previews; Cabell’s Directory of Publishing Opportunities in Economics and Finance; Chemical Abstracts; CSA Aquatic Science & Fisheries Abstracts; CSA Environmental Sciences & Pollution Management Database; CSA Pollution Abstracts; Current Contents/Engineering, Technology & Applied Sciences; Directory of Industry Data Sources; Economic Abstracts; Electrical and Electronics Abstracts; Energy Information Abstracts; Energy Research Abstracts; Engineering Index Monthly; Environmental Abstracts; Environmental Periodicals Bibliography (EPB); International Abstracts in Operations Research; Operations/Research/Management Science Abstracts; Petroleum Abstracts; Physikalische Berichte; and Science Citation Index.
Taylor & Francis make every effort to ensure the accuracy of all the information (the "Content") contained in our publications. However, Taylor & Francis, our agents, and our licensors make no representations or warranties whatsoever as to the accuracy, completeness, or suitability for any purpose of the Content. Any opinions and views expressed in this publication are the opinions and views of the authors, and are not the views of or endorsed by Taylor & Francis. The accuracy of the Content should not be relied upon and should be independently verified with primary sources of information. Taylor & Francis shall not be liable for any losses, actions, claims, proceedings, demands, costs, expenses, damages, and other liabilities whatsoever or howsoever caused arising directly or indirectly in connection with, in relation to, or arising out of the use of the Content. Terms & Conditions of access and use can be found at http://www.tandfonline.com/page/terms-and-conditions .