{"title":"持续改进实现模型:协调和整体元模型","authors":"B. Lameijer, H. Boer, J. Antony, R. Does","doi":"10.1080/09537287.2021.1974114","DOIUrl":null,"url":null,"abstract":"Abstract The purpose of this paper is to review and aggregate the guidance for continuous improvement (CI) implementation from existing implementation models. A sample of ultimately 27 implementation models is collected from the practitioner and academic literature. The models are assessed on quality and completeness using a research framework comprising organizational dimensions, phases in time, readiness factors, activities, and sustainability factors, leading to 415 coded observations. Subsequently, these 27 implementation models are integrated with one holistic metamodel, providing a detailed account of the existing CI deployment guidance to date. Based on the metamodel, knowledge gaps about implementation processes are identified and detailed needs for future research are presented. Thereby, repeated scholarly calls for better and more scientifically proven implementation guidance is addressed.","PeriodicalId":20627,"journal":{"name":"Production Planning & Control","volume":"25 1","pages":"1062 - 1081"},"PeriodicalIF":6.1000,"publicationDate":"2021-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Continuous improvement implementation models: a reconciliation and holistic metamodel\",\"authors\":\"B. Lameijer, H. Boer, J. Antony, R. Does\",\"doi\":\"10.1080/09537287.2021.1974114\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The purpose of this paper is to review and aggregate the guidance for continuous improvement (CI) implementation from existing implementation models. A sample of ultimately 27 implementation models is collected from the practitioner and academic literature. The models are assessed on quality and completeness using a research framework comprising organizational dimensions, phases in time, readiness factors, activities, and sustainability factors, leading to 415 coded observations. Subsequently, these 27 implementation models are integrated with one holistic metamodel, providing a detailed account of the existing CI deployment guidance to date. Based on the metamodel, knowledge gaps about implementation processes are identified and detailed needs for future research are presented. Thereby, repeated scholarly calls for better and more scientifically proven implementation guidance is addressed.\",\"PeriodicalId\":20627,\"journal\":{\"name\":\"Production Planning & Control\",\"volume\":\"25 1\",\"pages\":\"1062 - 1081\"},\"PeriodicalIF\":6.1000,\"publicationDate\":\"2021-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Production Planning & Control\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1080/09537287.2021.1974114\",\"RegionNum\":3,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Production Planning & Control","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1080/09537287.2021.1974114","RegionNum":3,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
Continuous improvement implementation models: a reconciliation and holistic metamodel
Abstract The purpose of this paper is to review and aggregate the guidance for continuous improvement (CI) implementation from existing implementation models. A sample of ultimately 27 implementation models is collected from the practitioner and academic literature. The models are assessed on quality and completeness using a research framework comprising organizational dimensions, phases in time, readiness factors, activities, and sustainability factors, leading to 415 coded observations. Subsequently, these 27 implementation models are integrated with one holistic metamodel, providing a detailed account of the existing CI deployment guidance to date. Based on the metamodel, knowledge gaps about implementation processes are identified and detailed needs for future research are presented. Thereby, repeated scholarly calls for better and more scientifically proven implementation guidance is addressed.
期刊介绍:
Production Planning & Control is an international journal that focuses on research papers concerning operations management across industries. It emphasizes research originating from industrial needs that can provide guidance to managers and future researchers. Papers accepted by "Production Planning & Control" should address emerging industrial needs, clearly outlining the nature of the industrial problem. Any suitable research methods may be employed, and each paper should justify the method used. Case studies illustrating international significance are encouraged. Authors are encouraged to relate their work to existing knowledge in the field, particularly regarding its implications for management practice and future research agendas.