给予、征收与前瞻性成本谬误

IF 2.1 2区 社会学 Q1 LAW New York University Law Review Pub Date : 2001-01-22 DOI:10.2139/SSRN.257322
J. Sidak, Daniel F. Spulber
{"title":"给予、征收与前瞻性成本谬误","authors":"J. Sidak, Daniel F. Spulber","doi":"10.2139/SSRN.257322","DOIUrl":null,"url":null,"abstract":"Mr. Sidak and Professor Spulber extend here the analysis in Deregulatory Takings and Breach of the Regulatory Contract, published last year in this Review. They respond to comments and criticisms raised not only by Professors Baumol and Merrill, but also by Judge Williams and Professor Williamson in their Comments published last year. Sidak and Spulber begin by exploring the constitutional limitations on the government's ability to redefine the public purpose to which a regulated utility has dedicated its private property. Then, the authors examine whether the government has made givings that implicitly compensate the regulated firm for its diminution in value owing to the imposition of policies mandating network unbundling at regulated prices. Sidak and Spulber refine the limiting principles for the recovery of stranded costs that they articulated in their earlier article and show how those principles reconcile with the actual treatment of losses from deregulation in disparate industries. Next, they expose the economic fallacies in the notion of forward-looking costs as that term has been used by the Federal Communications Commission and state public utility commissions to set prices for mandatory network access under the Telecommunications Act of 1996. The authors analyze the Supreme Courts 1996 decision in United States v. Winstar Corp. and argue that the reasoning employed by seven Justices in that case comports not only with earlier decisions of the Court construing the regulatory contract with public utilities, but also with the contemporary economic analysis of why the regulatory contract is essential and efficient. Sidak and Spulber explain how transition bonds may solve the stranded cost conundrum in the telecommunications and electric power industries by permitting the securitization of stranded costs in a manner that restores investors' faith in the state's ability to make credible commitments. Finally, the authors examine the significance of the Eighth Circuit's 1997 decision in Iowa Utilities Board v. FCC for the debate over deregulatory takings and breach of the regulatory contract.","PeriodicalId":47736,"journal":{"name":"New York University Law Review","volume":null,"pages":null},"PeriodicalIF":2.1000,"publicationDate":"2001-01-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"Givings, Takings, and the Fallacy of Forward-Looking Costs\",\"authors\":\"J. Sidak, Daniel F. Spulber\",\"doi\":\"10.2139/SSRN.257322\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Mr. Sidak and Professor Spulber extend here the analysis in Deregulatory Takings and Breach of the Regulatory Contract, published last year in this Review. They respond to comments and criticisms raised not only by Professors Baumol and Merrill, but also by Judge Williams and Professor Williamson in their Comments published last year. Sidak and Spulber begin by exploring the constitutional limitations on the government's ability to redefine the public purpose to which a regulated utility has dedicated its private property. Then, the authors examine whether the government has made givings that implicitly compensate the regulated firm for its diminution in value owing to the imposition of policies mandating network unbundling at regulated prices. Sidak and Spulber refine the limiting principles for the recovery of stranded costs that they articulated in their earlier article and show how those principles reconcile with the actual treatment of losses from deregulation in disparate industries. Next, they expose the economic fallacies in the notion of forward-looking costs as that term has been used by the Federal Communications Commission and state public utility commissions to set prices for mandatory network access under the Telecommunications Act of 1996. The authors analyze the Supreme Courts 1996 decision in United States v. Winstar Corp. and argue that the reasoning employed by seven Justices in that case comports not only with earlier decisions of the Court construing the regulatory contract with public utilities, but also with the contemporary economic analysis of why the regulatory contract is essential and efficient. Sidak and Spulber explain how transition bonds may solve the stranded cost conundrum in the telecommunications and electric power industries by permitting the securitization of stranded costs in a manner that restores investors' faith in the state's ability to make credible commitments. Finally, the authors examine the significance of the Eighth Circuit's 1997 decision in Iowa Utilities Board v. FCC for the debate over deregulatory takings and breach of the regulatory contract.\",\"PeriodicalId\":47736,\"journal\":{\"name\":\"New York University Law Review\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":2.1000,\"publicationDate\":\"2001-01-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"New York University Law Review\",\"FirstCategoryId\":\"90\",\"ListUrlMain\":\"https://doi.org/10.2139/SSRN.257322\",\"RegionNum\":2,\"RegionCategory\":\"社会学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"LAW\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"New York University Law Review","FirstCategoryId":"90","ListUrlMain":"https://doi.org/10.2139/SSRN.257322","RegionNum":2,"RegionCategory":"社会学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"LAW","Score":null,"Total":0}
引用次数: 13

摘要

Sidak先生和Spulber教授在此扩展了去年发表在《评论》上的《解除管制性征收和违反管制性合同》一文中的分析。他们不仅回应了鲍莫尔教授和梅里尔教授的评论和批评,还回应了威廉姆斯法官和威廉姆森教授去年发表的评论。Sidak和Spulber首先探讨了宪法对政府重新定义公共目的的限制,即受监管的公用事业公司将其私有财产用于公共目的。然后,作者研究了政府是否做出了捐赠,暗中补偿了受监管公司的价值下降,这是由于强制执行以管制价格进行网络分拆的政策造成的。Sidak和Spulber完善了他们在早期文章中阐述的回收搁浅成本的限制原则,并展示了这些原则如何与不同行业放松管制造成的损失的实际处理相协调。其次,他们揭露了前瞻性成本概念中的经济谬误,因为该术语已被联邦通信委员会和州公用事业委员会用于根据1996年《电信法》为强制性网络接入设定价格。作者分析了1996年最高法院对美国诉Winstar公司案的判决,并认为该案中七位大法官所采用的推理不仅符合最高法院对与公用事业公司的监管合同的早期判决,而且也符合当代经济学对监管合同为何必不可少和有效的分析。Sidak和Spulber解释了过渡债券是如何解决电信和电力行业的搁浅成本难题的,它允许搁浅成本的证券化,从而恢复投资者对国家做出可信承诺能力的信心。最后,作者考察了1997年第八巡回法院在爱荷华州公用事业委员会诉联邦通信委员会案中关于解除管制征收和违反管制合同的辩论的决定的意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Givings, Takings, and the Fallacy of Forward-Looking Costs
Mr. Sidak and Professor Spulber extend here the analysis in Deregulatory Takings and Breach of the Regulatory Contract, published last year in this Review. They respond to comments and criticisms raised not only by Professors Baumol and Merrill, but also by Judge Williams and Professor Williamson in their Comments published last year. Sidak and Spulber begin by exploring the constitutional limitations on the government's ability to redefine the public purpose to which a regulated utility has dedicated its private property. Then, the authors examine whether the government has made givings that implicitly compensate the regulated firm for its diminution in value owing to the imposition of policies mandating network unbundling at regulated prices. Sidak and Spulber refine the limiting principles for the recovery of stranded costs that they articulated in their earlier article and show how those principles reconcile with the actual treatment of losses from deregulation in disparate industries. Next, they expose the economic fallacies in the notion of forward-looking costs as that term has been used by the Federal Communications Commission and state public utility commissions to set prices for mandatory network access under the Telecommunications Act of 1996. The authors analyze the Supreme Courts 1996 decision in United States v. Winstar Corp. and argue that the reasoning employed by seven Justices in that case comports not only with earlier decisions of the Court construing the regulatory contract with public utilities, but also with the contemporary economic analysis of why the regulatory contract is essential and efficient. Sidak and Spulber explain how transition bonds may solve the stranded cost conundrum in the telecommunications and electric power industries by permitting the securitization of stranded costs in a manner that restores investors' faith in the state's ability to make credible commitments. Finally, the authors examine the significance of the Eighth Circuit's 1997 decision in Iowa Utilities Board v. FCC for the debate over deregulatory takings and breach of the regulatory contract.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
1.80
自引率
8.30%
发文量
1
期刊介绍: The New York University Law Review is a generalist journal publishing legal scholarship in all areas, including legal theory and policy, environmental law, legal history, international law, and more. Each year, our six issues contain cutting-edge legal scholarship written by professors, judges, and legal practitioners, as well as Notes written by members of the Law Review.
期刊最新文献
POLICING IN THE AGE OF THE GUN. Reinvigorating Commonality: Gender & Class Actions The Evidentiary Rules of Engagement in the War Against Domestic Violence A Dose of Reality for Medical Malpractice Reform Deference to Congressional Factfinding in Rights-Enforcing and Rights-Limiting Legislation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1