R. Arenhart, Morgana Pizzolato, A. A. Mendes, L. F. Braghirolli
{"title":"基于以可靠性为中心的公办高校测量仪器维修计划贡献评价","authors":"R. Arenhart, Morgana Pizzolato, A. A. Mendes, L. F. Braghirolli","doi":"10.14488/bjopm.2020.020","DOIUrl":null,"url":null,"abstract":"Goal: implement maintenance plans based on RCM in a laboratory and identify difficulties in the preparation of a maintenance plan for measuring instruments of a calibration and testing laboratory. Design / Methodology / Approach: Survey of the general maintenance scenario in PHEI laboratories, through individual interviews, and the implementation of maintenance plans elaborated from the implementation of Reliability Centered Maintenance (RCM). Results: Adaptations of the maintenance activities carried out by the analyzed laboratory. A demonstration of the laboratory's great adherence to the ANBT NBR ISO / IEC 17025 standard, besides the possibility of improving the quality of the service. Limitations of the investigation: The limitations are tied to the literature found on the subject and the application of maintenance plans restricted to only one university laboratory. Practical implications: Improve the literature on maintenance plans and facilitate the practical elaboration of these plans by laboratories. Originality / Value: Practical application of the preparation of maintenance plans for measuring instruments, not found in the literature of the subject.","PeriodicalId":54139,"journal":{"name":"Brazilian Journal of Operations & Production Management","volume":"59 1","pages":""},"PeriodicalIF":1.9000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Contribution evaluation of the maintenance plans based on reliability centered maintenance for measuring instruments in Public Higher Education Institutions\",\"authors\":\"R. Arenhart, Morgana Pizzolato, A. A. Mendes, L. F. Braghirolli\",\"doi\":\"10.14488/bjopm.2020.020\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Goal: implement maintenance plans based on RCM in a laboratory and identify difficulties in the preparation of a maintenance plan for measuring instruments of a calibration and testing laboratory. Design / Methodology / Approach: Survey of the general maintenance scenario in PHEI laboratories, through individual interviews, and the implementation of maintenance plans elaborated from the implementation of Reliability Centered Maintenance (RCM). Results: Adaptations of the maintenance activities carried out by the analyzed laboratory. A demonstration of the laboratory's great adherence to the ANBT NBR ISO / IEC 17025 standard, besides the possibility of improving the quality of the service. Limitations of the investigation: The limitations are tied to the literature found on the subject and the application of maintenance plans restricted to only one university laboratory. Practical implications: Improve the literature on maintenance plans and facilitate the practical elaboration of these plans by laboratories. Originality / Value: Practical application of the preparation of maintenance plans for measuring instruments, not found in the literature of the subject.\",\"PeriodicalId\":54139,\"journal\":{\"name\":\"Brazilian Journal of Operations & Production Management\",\"volume\":\"59 1\",\"pages\":\"\"},\"PeriodicalIF\":1.9000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Brazilian Journal of Operations & Production Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14488/bjopm.2020.020\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"OPERATIONS RESEARCH & MANAGEMENT SCIENCE\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Brazilian Journal of Operations & Production Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14488/bjopm.2020.020","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"OPERATIONS RESEARCH & MANAGEMENT SCIENCE","Score":null,"Total":0}
引用次数: 1
摘要
目标:在实验室实施基于RCM的维修计划,识别校准和检测实验室测量仪器维修计划编制中的困难。设计/方法/途径:调查PHEI实验室的一般维修场景,通过个人访谈,以及从实施以可靠性为中心的维修(RCM)中阐述的维修计划的实施。结果:分析实验室开展的维修活动的适应性。除了提高服务质量的可能性外,还展示了实验室对ANBT NBR ISO / IEC 17025标准的严格遵守。调查的局限性:这些局限性与有关该主题的文献和仅限于一个大学实验室的维护计划的应用有关。实际意义:改进关于维护计划的文献,并促进实验室对这些计划的实际阐述。原创性/价值:实际应用的测量仪器的维修计划的编制,没有发现在该学科的文献。
Contribution evaluation of the maintenance plans based on reliability centered maintenance for measuring instruments in Public Higher Education Institutions
Goal: implement maintenance plans based on RCM in a laboratory and identify difficulties in the preparation of a maintenance plan for measuring instruments of a calibration and testing laboratory. Design / Methodology / Approach: Survey of the general maintenance scenario in PHEI laboratories, through individual interviews, and the implementation of maintenance plans elaborated from the implementation of Reliability Centered Maintenance (RCM). Results: Adaptations of the maintenance activities carried out by the analyzed laboratory. A demonstration of the laboratory's great adherence to the ANBT NBR ISO / IEC 17025 standard, besides the possibility of improving the quality of the service. Limitations of the investigation: The limitations are tied to the literature found on the subject and the application of maintenance plans restricted to only one university laboratory. Practical implications: Improve the literature on maintenance plans and facilitate the practical elaboration of these plans by laboratories. Originality / Value: Practical application of the preparation of maintenance plans for measuring instruments, not found in the literature of the subject.