{"title":"分阶段任务下冗余系统的备件库存规划","authors":"M. Vujos̆ević,&nbsp;R. Petrović,&nbsp;A. S̆enborn","doi":"10.1016/0167-188X(90)90069-T","DOIUrl":null,"url":null,"abstract":"<div><p>The problem considered is a priori planning of spare parts inventory intended to keep operable a redundant system consisting of n identical and statistically independent elements. The system is subject to a certain mission proceeding in a number of successive time periods, called phases, during which environmental conditions and, thus, element reliabilities vary. Maintenance actions, intended to determine the system state and replace failed elements by new ones, may be performed only during overhauls between two successive phases. Spares inventories for replacement purposes are planned in advance for each overhaul assuming that spare parts remaining unused from previous overhauls can be used in succeeding ones. The mathematical model of the described system is developed in the paper and expressions for calculating relevant performances are derived. An optimization problem is stated in which the total purchase and holding costs are the criterion function and the stockout probabilities represent constraints.</p></div>","PeriodicalId":100476,"journal":{"name":"Engineering Costs and Production Economics","volume":"19 1","pages":"Pages 385-389"},"PeriodicalIF":0.0000,"publicationDate":"1990-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://sci-hub-pdf.com/10.1016/0167-188X(90)90069-T","citationCount":"6","resultStr":"{\"title\":\"Spare parts inventory planning for a redundant system subject to a phased mission\",\"authors\":\"M. Vujos̆ević,&nbsp;R. Petrović,&nbsp;A. S̆enborn\",\"doi\":\"10.1016/0167-188X(90)90069-T\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>The problem considered is a priori planning of spare parts inventory intended to keep operable a redundant system consisting of n identical and statistically independent elements. The system is subject to a certain mission proceeding in a number of successive time periods, called phases, during which environmental conditions and, thus, element reliabilities vary. Maintenance actions, intended to determine the system state and replace failed elements by new ones, may be performed only during overhauls between two successive phases. Spares inventories for replacement purposes are planned in advance for each overhaul assuming that spare parts remaining unused from previous overhauls can be used in succeeding ones. The mathematical model of the described system is developed in the paper and expressions for calculating relevant performances are derived. An optimization problem is stated in which the total purchase and holding costs are the criterion function and the stockout probabilities represent constraints.</p></div>\",\"PeriodicalId\":100476,\"journal\":{\"name\":\"Engineering Costs and Production Economics\",\"volume\":\"19 1\",\"pages\":\"Pages 385-389\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1990-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://sci-hub-pdf.com/10.1016/0167-188X(90)90069-T\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Engineering Costs and Production Economics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/0167188X9090069T\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Engineering Costs and Production Economics","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/0167188X9090069T","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

考虑的问题是备件库存的先验规划,旨在保持由n个相同且统计独立的元素组成的冗余系统的可操作性。该系统在若干连续的时间段(称为阶段)内受某一任务的影响,在此期间,环境条件和元件的可靠性各不相同。用于确定系统状态和用新部件替换失效部件的维护操作,只能在两个连续阶段之间的大修期间执行。每次大修时,预先计划备品备件库存,假设上次大修未使用的备品备件可以在后续大修中使用。本文建立了该系统的数学模型,并推导了相关性能的计算表达式。提出了一个以总采购成本和总持有成本为准则函数,缺货概率为约束条件的优化问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Spare parts inventory planning for a redundant system subject to a phased mission

The problem considered is a priori planning of spare parts inventory intended to keep operable a redundant system consisting of n identical and statistically independent elements. The system is subject to a certain mission proceeding in a number of successive time periods, called phases, during which environmental conditions and, thus, element reliabilities vary. Maintenance actions, intended to determine the system state and replace failed elements by new ones, may be performed only during overhauls between two successive phases. Spares inventories for replacement purposes are planned in advance for each overhaul assuming that spare parts remaining unused from previous overhauls can be used in succeeding ones. The mathematical model of the described system is developed in the paper and expressions for calculating relevant performances are derived. An optimization problem is stated in which the total purchase and holding costs are the criterion function and the stockout probabilities represent constraints.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Author index Bicriterion jobshop scheduling with total flowtime and sum of squared lateness Investment justification in flexible manufacturing systems Using multiple time-series analysis, of assembly-line production of automobile engines — a case study Systematic machine-condition monitoring — a case study from Parenco paper mill in Holland
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1