废钢回收和管理的可持续方法(尼日利亚案例研究)

Kingsley Onyekachi Anyanwu, H. O. Nzei, B. C. Agwah, P. C. Eze, Vi Ehirim
{"title":"废钢回收和管理的可持续方法(尼日利亚案例研究)","authors":"Kingsley Onyekachi Anyanwu, H. O. Nzei, B. C. Agwah, P. C. Eze, Vi Ehirim","doi":"10.54392/irjmt2311","DOIUrl":null,"url":null,"abstract":"This study has considered six steel scrap recycling plants, tagged A, B, C, D, E, F. The production process for each of the plants considered was separately observed and recorded. The investigation report revealed that none of the plant was following the due process involved in modern steel scrap recycling. Hence, a sustainable production flow system, deemed to be effective is proposed in this paper. The production data of each section was collected alongside the manpower and pollution control data. The data were analyzed mathematically using the models developed in this study. From the results obtained, pollution control was least in melting section with pollution control index of 33.8%, and highest in heat treatment with index of 51.9%. Comparatively, pollution control was least (37%) in plant A and highest (50.6%) in plant F. Also, manpower was least (32.4%) in plant A and highest (44.6%) in plant E. Mechanization was least (55.4%) in plant E and highest (73.2%) in plant B. Findings further indicated that melting section was running almost full capacity in Plant E (348 against 350 tons per day) and Heat treatment section was also running almost full capacity (342 against 350 tons per day in Plant C). The rest were running much below their design capacities.","PeriodicalId":14412,"journal":{"name":"International Research Journal of Multidisciplinary Technovation","volume":"1 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2022-12-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Sustainable Approach to Steel Scrap Recycling and Management (Nigeria as Case Study)\",\"authors\":\"Kingsley Onyekachi Anyanwu, H. O. Nzei, B. C. Agwah, P. C. Eze, Vi Ehirim\",\"doi\":\"10.54392/irjmt2311\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study has considered six steel scrap recycling plants, tagged A, B, C, D, E, F. The production process for each of the plants considered was separately observed and recorded. The investigation report revealed that none of the plant was following the due process involved in modern steel scrap recycling. Hence, a sustainable production flow system, deemed to be effective is proposed in this paper. The production data of each section was collected alongside the manpower and pollution control data. The data were analyzed mathematically using the models developed in this study. From the results obtained, pollution control was least in melting section with pollution control index of 33.8%, and highest in heat treatment with index of 51.9%. Comparatively, pollution control was least (37%) in plant A and highest (50.6%) in plant F. Also, manpower was least (32.4%) in plant A and highest (44.6%) in plant E. Mechanization was least (55.4%) in plant E and highest (73.2%) in plant B. Findings further indicated that melting section was running almost full capacity in Plant E (348 against 350 tons per day) and Heat treatment section was also running almost full capacity (342 against 350 tons per day in Plant C). The rest were running much below their design capacities.\",\"PeriodicalId\":14412,\"journal\":{\"name\":\"International Research Journal of Multidisciplinary Technovation\",\"volume\":\"1 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Research Journal of Multidisciplinary Technovation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.54392/irjmt2311\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Research Journal of Multidisciplinary Technovation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54392/irjmt2311","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究考虑了六个废钢回收厂,标记为A, B, C, D, E, f。每个工厂的生产过程被单独观察和记录。调查报告显示,该工厂没有一家遵循现代废钢回收的正当程序。因此,本文提出了一个可持续的、被认为是有效的生产流程系统。收集了各区段的生产数据以及人力和污染控制数据。使用本研究中开发的模型对数据进行数学分析。结果表明,熔炼段污染控制程度最低,污染控制指数为33.8%,热处理段污染控制程度最高,污染控制指数为51.9%。相比之下,A厂污染控制最少(37%),f厂污染控制最高(50.6%)。机械化程度在E工厂最低(55.4%),在b工厂最高(73.2%)。调查结果进一步表明,E工厂熔化部门几乎满负荷运转(348人,每天350吨),热处理部门也几乎满负荷运转(342人,每天350吨)。其余部门的运转远远低于其设计能力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
A Sustainable Approach to Steel Scrap Recycling and Management (Nigeria as Case Study)
This study has considered six steel scrap recycling plants, tagged A, B, C, D, E, F. The production process for each of the plants considered was separately observed and recorded. The investigation report revealed that none of the plant was following the due process involved in modern steel scrap recycling. Hence, a sustainable production flow system, deemed to be effective is proposed in this paper. The production data of each section was collected alongside the manpower and pollution control data. The data were analyzed mathematically using the models developed in this study. From the results obtained, pollution control was least in melting section with pollution control index of 33.8%, and highest in heat treatment with index of 51.9%. Comparatively, pollution control was least (37%) in plant A and highest (50.6%) in plant F. Also, manpower was least (32.4%) in plant A and highest (44.6%) in plant E. Mechanization was least (55.4%) in plant E and highest (73.2%) in plant B. Findings further indicated that melting section was running almost full capacity in Plant E (348 against 350 tons per day) and Heat treatment section was also running almost full capacity (342 against 350 tons per day in Plant C). The rest were running much below their design capacities.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.50
自引率
0.00%
发文量
0
期刊最新文献
Advancing Fault Detection Efficiency in Wireless Power Transmission with Light GBM for Real-Time Detection Enhancement Quantum Chemical Computational Studies on the Structural Aspects, Spectroscopic Properties, Hirshfeld Surfaces, Donor-Acceptor Interactions and Molecular Docking of Clascosterone: A Promising Antitumor Agent Evaluation of Structural Stability of Four-Storied building using Non-Destructive Testing Techniques Diagnosis of COVID-19 in X-ray Images using Deep Neural Networks An Ensemble Classification Model to Predict Alzheimer’s Incidence as Multiple Classes
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1