采用双加权作业的帕累托调度,以最小化延迟作业的加权数量和延迟作业的加权总数

Shuen Guo, Lingfa Lu, Jinjiang Yuan, C. T. Ng, T. Cheng
{"title":"采用双加权作业的帕累托调度,以最小化延迟作业的加权数量和延迟作业的加权总数","authors":"Shuen Guo, Lingfa Lu, Jinjiang Yuan, C. T. Ng, T. Cheng","doi":"10.1002/nav.22050","DOIUrl":null,"url":null,"abstract":"We consider the single‐machine Pareto‐scheduling problem to minimize the weighted number of tardy jobs and total weighted late work simultaneously. The problem is to find the set of all the Pareto‐optimal points, that is, the Pareto frontier, and their corresponding Pareto‐optimal schedules. We consider the corresponding weighted‐sum scheduling problem and primary‐secondary scheduling problems, being subproblems of the general Pareto‐scheduling problem. The NP‐hardness of the general problem follows directly from the NP‐hardness of the two constituent single‐criterion problems. We present a pseudo‐polynomial algorithm and a fully polynomial‐time approximation scheme (FPTAS) running in weakly polynomial time to deal with the general problem. When all the jobs have a common due date, we further provide an FPTAS running in strongly polynomial time. We also study some special cases of the general problem where the jobs have equal processing times, a common due date, or a common weight, and analyze their computational complexity status.","PeriodicalId":19120,"journal":{"name":"Naval Research Logistics (NRL)","volume":"1 1","pages":"816 - 837"},"PeriodicalIF":0.0000,"publicationDate":"2022-02-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work\",\"authors\":\"Shuen Guo, Lingfa Lu, Jinjiang Yuan, C. T. Ng, T. Cheng\",\"doi\":\"10.1002/nav.22050\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We consider the single‐machine Pareto‐scheduling problem to minimize the weighted number of tardy jobs and total weighted late work simultaneously. The problem is to find the set of all the Pareto‐optimal points, that is, the Pareto frontier, and their corresponding Pareto‐optimal schedules. We consider the corresponding weighted‐sum scheduling problem and primary‐secondary scheduling problems, being subproblems of the general Pareto‐scheduling problem. The NP‐hardness of the general problem follows directly from the NP‐hardness of the two constituent single‐criterion problems. We present a pseudo‐polynomial algorithm and a fully polynomial‐time approximation scheme (FPTAS) running in weakly polynomial time to deal with the general problem. When all the jobs have a common due date, we further provide an FPTAS running in strongly polynomial time. We also study some special cases of the general problem where the jobs have equal processing times, a common due date, or a common weight, and analyze their computational complexity status.\",\"PeriodicalId\":19120,\"journal\":{\"name\":\"Naval Research Logistics (NRL)\",\"volume\":\"1 1\",\"pages\":\"816 - 837\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-02-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Naval Research Logistics (NRL)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/nav.22050\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Naval Research Logistics (NRL)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/nav.22050","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

考虑单机Pareto调度问题,以同时最小化延迟工作的加权数和延迟工作的加权总数。问题是找到所有帕累托最优点的集合,即帕累托边界,以及它们对应的帕累托最优调度。我们考虑了相应的加权和调度问题和主次调度问题,它们是一般Pareto调度问题的子问题。一般问题的NP困难直接来源于两个单准则问题的NP困难。我们提出了一个伪多项式算法和一个在弱多项式时间内运行的全多项式时间近似方案(FPTAS)来处理一般问题。当所有作业都有一个共同的到期日期时,我们进一步提供一个在强多项式时间内运行的FPTAS。我们还研究了一般问题的一些特殊情况,其中作业具有相同的处理时间、相同的到期日或相同的权重,并分析了它们的计算复杂性状态。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work
We consider the single‐machine Pareto‐scheduling problem to minimize the weighted number of tardy jobs and total weighted late work simultaneously. The problem is to find the set of all the Pareto‐optimal points, that is, the Pareto frontier, and their corresponding Pareto‐optimal schedules. We consider the corresponding weighted‐sum scheduling problem and primary‐secondary scheduling problems, being subproblems of the general Pareto‐scheduling problem. The NP‐hardness of the general problem follows directly from the NP‐hardness of the two constituent single‐criterion problems. We present a pseudo‐polynomial algorithm and a fully polynomial‐time approximation scheme (FPTAS) running in weakly polynomial time to deal with the general problem. When all the jobs have a common due date, we further provide an FPTAS running in strongly polynomial time. We also study some special cases of the general problem where the jobs have equal processing times, a common due date, or a common weight, and analyze their computational complexity status.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Assigning parcel destinations to drop‐off points in a congested robotic sorting system An optimization‐based Monte Carlo method for estimating the two‐terminal survival signature of networks with two component classes A two‐stage adaptive robust model for designing a reliable blood supply chain network with disruption considerations in disaster situations Firm decisions and government subsidies in a supply chain with consumer surplus consideration Optimal emission regulation under market uncertainty
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1