{"title":"造船长期规划与中期调度的整合","authors":"Suheon Ju, J. Woo","doi":"10.1080/09537287.2021.1940344","DOIUrl":null,"url":null,"abstract":"Abstract A shipyard’s production plan has a hierarchical structure comprising a long-term plan and a mid-term or short-term plan. The mid-term schedule is established based on the major schedules of the long-term plan. However, in the long-term planning stage, the mid-term schedule is not considered owing to timing discrepancies and the lack of data. Therefore, even if a major schedule is changed to achieve production goals – such as workload balancing in the mid-term scheduling process – this is not reflected in the long-term plan. To solve these discrepancy challenges in conventional production planning, the problems of an existing shipbuilding production planning process were derived, and an algorithm to optimize the berth schedule by reflecting the mid-term schedule when establishing a long-term plan was developed. The developed methodology and algorithm were installed in an existing planning system and applied to an actual shipyard production planning process. Results showed improvements in long-term and mid-term scheduling.","PeriodicalId":20627,"journal":{"name":"Production Planning & Control","volume":"9 1","pages":"524 - 542"},"PeriodicalIF":6.1000,"publicationDate":"2021-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Integration of long-term planning and mid-term scheduling of shipbuilding\",\"authors\":\"Suheon Ju, J. Woo\",\"doi\":\"10.1080/09537287.2021.1940344\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract A shipyard’s production plan has a hierarchical structure comprising a long-term plan and a mid-term or short-term plan. The mid-term schedule is established based on the major schedules of the long-term plan. However, in the long-term planning stage, the mid-term schedule is not considered owing to timing discrepancies and the lack of data. Therefore, even if a major schedule is changed to achieve production goals – such as workload balancing in the mid-term scheduling process – this is not reflected in the long-term plan. To solve these discrepancy challenges in conventional production planning, the problems of an existing shipbuilding production planning process were derived, and an algorithm to optimize the berth schedule by reflecting the mid-term schedule when establishing a long-term plan was developed. The developed methodology and algorithm were installed in an existing planning system and applied to an actual shipyard production planning process. Results showed improvements in long-term and mid-term scheduling.\",\"PeriodicalId\":20627,\"journal\":{\"name\":\"Production Planning & Control\",\"volume\":\"9 1\",\"pages\":\"524 - 542\"},\"PeriodicalIF\":6.1000,\"publicationDate\":\"2021-07-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Production Planning & Control\",\"FirstCategoryId\":\"91\",\"ListUrlMain\":\"https://doi.org/10.1080/09537287.2021.1940344\",\"RegionNum\":3,\"RegionCategory\":\"管理学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Production Planning & Control","FirstCategoryId":"91","ListUrlMain":"https://doi.org/10.1080/09537287.2021.1940344","RegionNum":3,"RegionCategory":"管理学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
Integration of long-term planning and mid-term scheduling of shipbuilding
Abstract A shipyard’s production plan has a hierarchical structure comprising a long-term plan and a mid-term or short-term plan. The mid-term schedule is established based on the major schedules of the long-term plan. However, in the long-term planning stage, the mid-term schedule is not considered owing to timing discrepancies and the lack of data. Therefore, even if a major schedule is changed to achieve production goals – such as workload balancing in the mid-term scheduling process – this is not reflected in the long-term plan. To solve these discrepancy challenges in conventional production planning, the problems of an existing shipbuilding production planning process were derived, and an algorithm to optimize the berth schedule by reflecting the mid-term schedule when establishing a long-term plan was developed. The developed methodology and algorithm were installed in an existing planning system and applied to an actual shipyard production planning process. Results showed improvements in long-term and mid-term scheduling.
期刊介绍:
Production Planning & Control is an international journal that focuses on research papers concerning operations management across industries. It emphasizes research originating from industrial needs that can provide guidance to managers and future researchers. Papers accepted by "Production Planning & Control" should address emerging industrial needs, clearly outlining the nature of the industrial problem. Any suitable research methods may be employed, and each paper should justify the method used. Case studies illustrating international significance are encouraged. Authors are encouraged to relate their work to existing knowledge in the field, particularly regarding its implications for management practice and future research agendas.