{"title":"半导体晶圆制造中分层生产计划的迭代方法","authors":"Rajarshi Bardhan, Chi Xu, Zhiguang Cao, Puay Siew Tan","doi":"10.1109/IEEM50564.2021.9672987","DOIUrl":null,"url":null,"abstract":"This paper considers a production planning and scheduling problem in a multi-product semiconductor wafer fabrication facility, which copes with the challenging factors including multiple re-entrant loops and diverse equipment characteristics. This work proposes a hierarchical production planning and scheduling approach that uses an iterative method for refining production plans to solve this problem. A production plan serving multiple objectives is derived by solving a linear programming problem, which is followed by a simulation run with a given scheduling rule to evaluate the performance gap. The planning and the simulation phases are executed in an iterative manner to reduce the performance gap between the planned production level and that from simulation outcome. A scheduling rule is proposed whereby the priority of a wafer is derived from the state of work-in-process (WIP) or production at that instant. The performance of the proposed method is assessed based on numerical simulations carried on Intel mini fab taking due date based demands for multiple products into consideration.","PeriodicalId":6818,"journal":{"name":"2021 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":"3 1","pages":"673-677"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"An Iterative Scheme for Hierarchical Production Planning in Semiconductor Wafer Fabrication\",\"authors\":\"Rajarshi Bardhan, Chi Xu, Zhiguang Cao, Puay Siew Tan\",\"doi\":\"10.1109/IEEM50564.2021.9672987\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper considers a production planning and scheduling problem in a multi-product semiconductor wafer fabrication facility, which copes with the challenging factors including multiple re-entrant loops and diverse equipment characteristics. This work proposes a hierarchical production planning and scheduling approach that uses an iterative method for refining production plans to solve this problem. A production plan serving multiple objectives is derived by solving a linear programming problem, which is followed by a simulation run with a given scheduling rule to evaluate the performance gap. The planning and the simulation phases are executed in an iterative manner to reduce the performance gap between the planned production level and that from simulation outcome. A scheduling rule is proposed whereby the priority of a wafer is derived from the state of work-in-process (WIP) or production at that instant. The performance of the proposed method is assessed based on numerical simulations carried on Intel mini fab taking due date based demands for multiple products into consideration.\",\"PeriodicalId\":6818,\"journal\":{\"name\":\"2021 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"volume\":\"3 1\",\"pages\":\"673-677\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-12-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM50564.2021.9672987\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM50564.2021.9672987","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文研究了多产品半导体晶圆制造工厂的生产计划和调度问题,该问题处理了多个可重入回路和不同设备特性等挑战性因素。本文提出了一种分层生产计划和调度方法,该方法使用迭代方法来改进生产计划以解决这一问题。通过求解一个线性规划问题,得到一个服务于多个目标的生产计划,然后在给定调度规则下进行模拟运行,以评估性能差距。计划和模拟阶段以迭代的方式执行,以减少计划生产水平与模拟结果之间的性能差距。提出了一种调度规则,其中晶圆片的优先级由在制品(WIP)或生产状态派生。基于Intel微型晶圆厂的数值模拟,考虑了多产品的到期日期需求,对所提方法的性能进行了评估。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
An Iterative Scheme for Hierarchical Production Planning in Semiconductor Wafer Fabrication
This paper considers a production planning and scheduling problem in a multi-product semiconductor wafer fabrication facility, which copes with the challenging factors including multiple re-entrant loops and diverse equipment characteristics. This work proposes a hierarchical production planning and scheduling approach that uses an iterative method for refining production plans to solve this problem. A production plan serving multiple objectives is derived by solving a linear programming problem, which is followed by a simulation run with a given scheduling rule to evaluate the performance gap. The planning and the simulation phases are executed in an iterative manner to reduce the performance gap between the planned production level and that from simulation outcome. A scheduling rule is proposed whereby the priority of a wafer is derived from the state of work-in-process (WIP) or production at that instant. The performance of the proposed method is assessed based on numerical simulations carried on Intel mini fab taking due date based demands for multiple products into consideration.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Representing Control Software Functionality as Part of a Modular, Mechatronic Construction Kit Situational Awareness and Flight Approach Phase Event Recognition Based on Psychophysiological Measurements The Robust Optimization Approach for the Community Group Purchase Joint Order Fulfillment and Delivery Problem Application of the Multistage One-shot Decision-making Approach to an IT Project in the Central Bank of Oman A Review on Electric Bus Charging Scheduling from Viewpoints of Vehicle Scheduling
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1