A. Yugay, Mubashir Ahmad, I. Bankole, S. Alhouqani, Salah Al Qallabi, G. Pimenta
{"title":"高酸、高硫致密气高温高压碳酸盐岩储层评价成功","authors":"A. Yugay, Mubashir Ahmad, I. Bankole, S. Alhouqani, Salah Al Qallabi, G. Pimenta","doi":"10.2118/197657-ms","DOIUrl":null,"url":null,"abstract":"\n As a part of Country strategy to fulfill growing demand in gas energy in the country, development of Arab formations started. This paper shares the actual case history of successfully completed evaluation of Arab formation in one of the Company fields. High temperature (300F), high H2S concentrations (up to 37% H2S) and presence of elemental Sulphur dictated usage of very exotic downhole corrosion resistant alloy (CRA) material. Tightness of carbonate formation (less than 1 mD) pushed to drill 10,000’ horizontal section to meet project objectives. High reservoir pressure reaching 5,700 psi in combination with all conditions above resulted in high level of risk during initial project evaluation and required very robust HSE and Integrity systems in place with no chance to failure.\n Arab formation evaluation project started in 2014 and was performed in several steps, with gradual increase of the complexity of the each next stage: from vertical well to horizontal, from sampling to longer duration testing, from carbon steel completion to fit-for-purpose inhibition and high grade CRA materials. Efficient collaboration among multidisciplinary teams, continuous management support and clear communication channels between all stakeholders proved to be a key to success for this challenging project. The project included involvement of high capacity rig to fulfill extended reach depth (ERD) well requirements, specific well intervention techniques while drilling and testing, usage of special inhibitor for high sour wells and finally inspection of the recovered completion. All Company available best practices and technical competencies applied in this project allowed to overcome all the challenges and achieve appreciable sustainable gas rates, meeting all set objectives with no HSE incidents and failures. Findings and lessons learned received are used to tailor next stage of the project to ensure most efficient scenario of field development to support country strategy in increasing energy potential.\n The content of the paper gives a good understanding to the readers on the key aspects and main challenges that they may face during initial evaluation stage of the tight gas high pressure high temperature (HPHT) carbonate formations with high H2S content. The document could be used as a local considering current government strategy of massive attraction of new business partners for the exploration of new gas and gas condensate blocks in the region.","PeriodicalId":11328,"journal":{"name":"Day 4 Thu, November 14, 2019","volume":"35 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Successful Evaluation of Tight Gas HPHT Carbonate Formation with Extremely High Sour Content and Elemental Sulphur Presence\",\"authors\":\"A. Yugay, Mubashir Ahmad, I. Bankole, S. Alhouqani, Salah Al Qallabi, G. Pimenta\",\"doi\":\"10.2118/197657-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n As a part of Country strategy to fulfill growing demand in gas energy in the country, development of Arab formations started. This paper shares the actual case history of successfully completed evaluation of Arab formation in one of the Company fields. High temperature (300F), high H2S concentrations (up to 37% H2S) and presence of elemental Sulphur dictated usage of very exotic downhole corrosion resistant alloy (CRA) material. Tightness of carbonate formation (less than 1 mD) pushed to drill 10,000’ horizontal section to meet project objectives. High reservoir pressure reaching 5,700 psi in combination with all conditions above resulted in high level of risk during initial project evaluation and required very robust HSE and Integrity systems in place with no chance to failure.\\n Arab formation evaluation project started in 2014 and was performed in several steps, with gradual increase of the complexity of the each next stage: from vertical well to horizontal, from sampling to longer duration testing, from carbon steel completion to fit-for-purpose inhibition and high grade CRA materials. Efficient collaboration among multidisciplinary teams, continuous management support and clear communication channels between all stakeholders proved to be a key to success for this challenging project. The project included involvement of high capacity rig to fulfill extended reach depth (ERD) well requirements, specific well intervention techniques while drilling and testing, usage of special inhibitor for high sour wells and finally inspection of the recovered completion. All Company available best practices and technical competencies applied in this project allowed to overcome all the challenges and achieve appreciable sustainable gas rates, meeting all set objectives with no HSE incidents and failures. Findings and lessons learned received are used to tailor next stage of the project to ensure most efficient scenario of field development to support country strategy in increasing energy potential.\\n The content of the paper gives a good understanding to the readers on the key aspects and main challenges that they may face during initial evaluation stage of the tight gas high pressure high temperature (HPHT) carbonate formations with high H2S content. The document could be used as a local considering current government strategy of massive attraction of new business partners for the exploration of new gas and gas condensate blocks in the region.\",\"PeriodicalId\":11328,\"journal\":{\"name\":\"Day 4 Thu, November 14, 2019\",\"volume\":\"35 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Thu, November 14, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/197657-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, November 14, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/197657-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Successful Evaluation of Tight Gas HPHT Carbonate Formation with Extremely High Sour Content and Elemental Sulphur Presence
As a part of Country strategy to fulfill growing demand in gas energy in the country, development of Arab formations started. This paper shares the actual case history of successfully completed evaluation of Arab formation in one of the Company fields. High temperature (300F), high H2S concentrations (up to 37% H2S) and presence of elemental Sulphur dictated usage of very exotic downhole corrosion resistant alloy (CRA) material. Tightness of carbonate formation (less than 1 mD) pushed to drill 10,000’ horizontal section to meet project objectives. High reservoir pressure reaching 5,700 psi in combination with all conditions above resulted in high level of risk during initial project evaluation and required very robust HSE and Integrity systems in place with no chance to failure.
Arab formation evaluation project started in 2014 and was performed in several steps, with gradual increase of the complexity of the each next stage: from vertical well to horizontal, from sampling to longer duration testing, from carbon steel completion to fit-for-purpose inhibition and high grade CRA materials. Efficient collaboration among multidisciplinary teams, continuous management support and clear communication channels between all stakeholders proved to be a key to success for this challenging project. The project included involvement of high capacity rig to fulfill extended reach depth (ERD) well requirements, specific well intervention techniques while drilling and testing, usage of special inhibitor for high sour wells and finally inspection of the recovered completion. All Company available best practices and technical competencies applied in this project allowed to overcome all the challenges and achieve appreciable sustainable gas rates, meeting all set objectives with no HSE incidents and failures. Findings and lessons learned received are used to tailor next stage of the project to ensure most efficient scenario of field development to support country strategy in increasing energy potential.
The content of the paper gives a good understanding to the readers on the key aspects and main challenges that they may face during initial evaluation stage of the tight gas high pressure high temperature (HPHT) carbonate formations with high H2S content. The document could be used as a local considering current government strategy of massive attraction of new business partners for the exploration of new gas and gas condensate blocks in the region.