{"title":"高酸、高硫致密气高温高压碳酸盐岩储层评价成功","authors":"A. Yugay, Mubashir Ahmad, I. Bankole, S. Alhouqani, Salah Al Qallabi, G. Pimenta","doi":"10.2118/197657-ms","DOIUrl":null,"url":null,"abstract":"\n As a part of Country strategy to fulfill growing demand in gas energy in the country, development of Arab formations started. This paper shares the actual case history of successfully completed evaluation of Arab formation in one of the Company fields. High temperature (300F), high H2S concentrations (up to 37% H2S) and presence of elemental Sulphur dictated usage of very exotic downhole corrosion resistant alloy (CRA) material. Tightness of carbonate formation (less than 1 mD) pushed to drill 10,000’ horizontal section to meet project objectives. High reservoir pressure reaching 5,700 psi in combination with all conditions above resulted in high level of risk during initial project evaluation and required very robust HSE and Integrity systems in place with no chance to failure.\n Arab formation evaluation project started in 2014 and was performed in several steps, with gradual increase of the complexity of the each next stage: from vertical well to horizontal, from sampling to longer duration testing, from carbon steel completion to fit-for-purpose inhibition and high grade CRA materials. Efficient collaboration among multidisciplinary teams, continuous management support and clear communication channels between all stakeholders proved to be a key to success for this challenging project. The project included involvement of high capacity rig to fulfill extended reach depth (ERD) well requirements, specific well intervention techniques while drilling and testing, usage of special inhibitor for high sour wells and finally inspection of the recovered completion. All Company available best practices and technical competencies applied in this project allowed to overcome all the challenges and achieve appreciable sustainable gas rates, meeting all set objectives with no HSE incidents and failures. Findings and lessons learned received are used to tailor next stage of the project to ensure most efficient scenario of field development to support country strategy in increasing energy potential.\n The content of the paper gives a good understanding to the readers on the key aspects and main challenges that they may face during initial evaluation stage of the tight gas high pressure high temperature (HPHT) carbonate formations with high H2S content. The document could be used as a local considering current government strategy of massive attraction of new business partners for the exploration of new gas and gas condensate blocks in the region.","PeriodicalId":11328,"journal":{"name":"Day 4 Thu, November 14, 2019","volume":"35 1","pages":""},"PeriodicalIF":0.0000,"publicationDate":"2019-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Successful Evaluation of Tight Gas HPHT Carbonate Formation with Extremely High Sour Content and Elemental Sulphur Presence\",\"authors\":\"A. Yugay, Mubashir Ahmad, I. Bankole, S. Alhouqani, Salah Al Qallabi, G. Pimenta\",\"doi\":\"10.2118/197657-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n As a part of Country strategy to fulfill growing demand in gas energy in the country, development of Arab formations started. This paper shares the actual case history of successfully completed evaluation of Arab formation in one of the Company fields. High temperature (300F), high H2S concentrations (up to 37% H2S) and presence of elemental Sulphur dictated usage of very exotic downhole corrosion resistant alloy (CRA) material. Tightness of carbonate formation (less than 1 mD) pushed to drill 10,000’ horizontal section to meet project objectives. High reservoir pressure reaching 5,700 psi in combination with all conditions above resulted in high level of risk during initial project evaluation and required very robust HSE and Integrity systems in place with no chance to failure.\\n Arab formation evaluation project started in 2014 and was performed in several steps, with gradual increase of the complexity of the each next stage: from vertical well to horizontal, from sampling to longer duration testing, from carbon steel completion to fit-for-purpose inhibition and high grade CRA materials. Efficient collaboration among multidisciplinary teams, continuous management support and clear communication channels between all stakeholders proved to be a key to success for this challenging project. The project included involvement of high capacity rig to fulfill extended reach depth (ERD) well requirements, specific well intervention techniques while drilling and testing, usage of special inhibitor for high sour wells and finally inspection of the recovered completion. All Company available best practices and technical competencies applied in this project allowed to overcome all the challenges and achieve appreciable sustainable gas rates, meeting all set objectives with no HSE incidents and failures. Findings and lessons learned received are used to tailor next stage of the project to ensure most efficient scenario of field development to support country strategy in increasing energy potential.\\n The content of the paper gives a good understanding to the readers on the key aspects and main challenges that they may face during initial evaluation stage of the tight gas high pressure high temperature (HPHT) carbonate formations with high H2S content. The document could be used as a local considering current government strategy of massive attraction of new business partners for the exploration of new gas and gas condensate blocks in the region.\",\"PeriodicalId\":11328,\"journal\":{\"name\":\"Day 4 Thu, November 14, 2019\",\"volume\":\"35 1\",\"pages\":\"\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Thu, November 14, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/197657-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Thu, November 14, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/197657-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

作为满足该国日益增长的天然气能源需求的国家战略的一部分,阿拉伯地层的开发开始了。本文分享了公司某油田成功完成阿拉伯地层评价的实际案例历史。高温(300F)、高H2S浓度(高达37% H2S)和单质硫的存在决定了使用非常特殊的井下耐腐蚀合金(CRA)材料。碳酸盐岩地层致密性(小于1md),推进至10000英尺水平段,以满足项目目标。在最初的项目评估中,高达5700 psi的高油藏压力加上上述所有条件导致了很高的风险,并且需要非常强大的HSE和完整性系统,不能出现故障。阿拉伯地层评价项目始于2014年,分几个步骤进行,下一阶段的复杂性逐渐增加:从直井到水平井,从取样到更长时间的测试,从碳钢完井到适合用途的抑制和高级CRA材料。多学科团队之间的高效协作、持续的管理支持和所有利益相关者之间清晰的沟通渠道被证明是这个具有挑战性的项目成功的关键。该项目包括使用大容量钻机来满足大位移深度(ERD)井的要求,在钻井和测试过程中使用特定的油井干预技术,在高酸井中使用特殊的抑制剂,最后对回收完井进行检查。公司在该项目中运用了所有的最佳实践和技术能力,克服了所有的挑战,实现了可观的可持续产气率,达到了所有设定的目标,没有发生HSE事故和故障。所收到的调查结果和经验教训将用于调整项目的下一阶段,以确保最有效的实地开发方案,以支持提高能源潜力的国家战略。本文的内容使读者对高硫化氢含量致密气高压高温(HPHT)碳酸盐岩地层在初始评价阶段可能面临的关键方面和主要挑战有了很好的了解。该文件可以作为当地考虑到当前政府的战略,即大规模吸引新的商业伙伴来勘探该地区的新天然气和凝析气区块。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Successful Evaluation of Tight Gas HPHT Carbonate Formation with Extremely High Sour Content and Elemental Sulphur Presence
As a part of Country strategy to fulfill growing demand in gas energy in the country, development of Arab formations started. This paper shares the actual case history of successfully completed evaluation of Arab formation in one of the Company fields. High temperature (300F), high H2S concentrations (up to 37% H2S) and presence of elemental Sulphur dictated usage of very exotic downhole corrosion resistant alloy (CRA) material. Tightness of carbonate formation (less than 1 mD) pushed to drill 10,000’ horizontal section to meet project objectives. High reservoir pressure reaching 5,700 psi in combination with all conditions above resulted in high level of risk during initial project evaluation and required very robust HSE and Integrity systems in place with no chance to failure. Arab formation evaluation project started in 2014 and was performed in several steps, with gradual increase of the complexity of the each next stage: from vertical well to horizontal, from sampling to longer duration testing, from carbon steel completion to fit-for-purpose inhibition and high grade CRA materials. Efficient collaboration among multidisciplinary teams, continuous management support and clear communication channels between all stakeholders proved to be a key to success for this challenging project. The project included involvement of high capacity rig to fulfill extended reach depth (ERD) well requirements, specific well intervention techniques while drilling and testing, usage of special inhibitor for high sour wells and finally inspection of the recovered completion. All Company available best practices and technical competencies applied in this project allowed to overcome all the challenges and achieve appreciable sustainable gas rates, meeting all set objectives with no HSE incidents and failures. Findings and lessons learned received are used to tailor next stage of the project to ensure most efficient scenario of field development to support country strategy in increasing energy potential. The content of the paper gives a good understanding to the readers on the key aspects and main challenges that they may face during initial evaluation stage of the tight gas high pressure high temperature (HPHT) carbonate formations with high H2S content. The document could be used as a local considering current government strategy of massive attraction of new business partners for the exploration of new gas and gas condensate blocks in the region.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Evaluation of bag-of-features (BoF) technique for weed management in sugarcane production Spraying deposits using different nozzles and application volumes for pest management of cotton at reproductive stage Opioid Prescription in Switzerland: Appropriate Comedication use in Cancer and Noncancer Pain Co-Development Aspects of Super Giant Reservoirs With Condensate-Rich Gas Cap Healing Total Losses and Establishing Well Integrity with Engineered Fiber-Based Lost Circulation Control Spacer During Primary Cementing in UAE Offshore
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1