{"title":"基于贝叶斯网络模型的LCC项目划痕分析","authors":"Leandro Aparecido da Silva, Renan Borba Costa, Flaviano Costa Dantas, Josué Vitor de Medeiros Júnior, Andre Morais Gurgel, Afranio Galdino de Araujo","doi":"10.5539/ijbm.v18n5p141","DOIUrl":null,"url":null,"abstract":"Emphasizing the need to use models capable of dealing with the uncertainty of the project environment, especially those that can alleviate any scratchs that may arise during the course of the project, the following question arises: How to assess the scratchs of a project developed in LCC at from measurements from a Bayesian Network model? In this context, the goal of the study is to measure and analyze the scratchs of a project developed by the LCC method from a model elaborated in Bayesian Networks. The RB structure is composed of two parts, one with a qualitative approach, the other with a quantitative approach. From the information collected with a specialist, we sought to understand the strength that each item present in the key factors Requirements, Restrictions, Time Deliveries and Assumptions exerts on the key factor scratchs, in addition to the strength that each item of the key factor scratchs exerts together with the General Project Performance Indicator (IGDP). Based on the generated simulations, it seen which scratchs affected by a larger number of parameters in the project, as well as the scratchs that present a high or moderate probability of inferior performance with the IGDP. The research developed a probabilistic model that supplied the quantification of possible scratchs in the project, based on the belief of an expert. The developed RB allowed project managers to measure, and so deliberate on practical solutions to problems that affected by project scratchs, based on parameterized analyses.","PeriodicalId":38990,"journal":{"name":"International Journal of Business and Management Science","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-09-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Scratchs Analysis of an LCC Project Using a Bayesian Network Model\",\"authors\":\"Leandro Aparecido da Silva, Renan Borba Costa, Flaviano Costa Dantas, Josué Vitor de Medeiros Júnior, Andre Morais Gurgel, Afranio Galdino de Araujo\",\"doi\":\"10.5539/ijbm.v18n5p141\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Emphasizing the need to use models capable of dealing with the uncertainty of the project environment, especially those that can alleviate any scratchs that may arise during the course of the project, the following question arises: How to assess the scratchs of a project developed in LCC at from measurements from a Bayesian Network model? In this context, the goal of the study is to measure and analyze the scratchs of a project developed by the LCC method from a model elaborated in Bayesian Networks. The RB structure is composed of two parts, one with a qualitative approach, the other with a quantitative approach. From the information collected with a specialist, we sought to understand the strength that each item present in the key factors Requirements, Restrictions, Time Deliveries and Assumptions exerts on the key factor scratchs, in addition to the strength that each item of the key factor scratchs exerts together with the General Project Performance Indicator (IGDP). Based on the generated simulations, it seen which scratchs affected by a larger number of parameters in the project, as well as the scratchs that present a high or moderate probability of inferior performance with the IGDP. The research developed a probabilistic model that supplied the quantification of possible scratchs in the project, based on the belief of an expert. The developed RB allowed project managers to measure, and so deliberate on practical solutions to problems that affected by project scratchs, based on parameterized analyses.\",\"PeriodicalId\":38990,\"journal\":{\"name\":\"International Journal of Business and Management Science\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Business and Management Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5539/ijbm.v18n5p141\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Business, Management and Accounting\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Business and Management Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5539/ijbm.v18n5p141","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Business, Management and Accounting","Score":null,"Total":0}
引用次数: 1

摘要

强调需要使用能够处理项目环境的不确定性的模型,特别是那些可以减轻项目过程中可能出现的任何擦伤的模型,下面的问题出现了:如何从贝叶斯网络模型的测量来评估LCC中开发的项目的擦伤?在这种情况下,本研究的目标是测量和分析由贝叶斯网络中阐述的模型的LCC方法开发的项目的划痕。RB结构由两部分组成,一部分采用定性方法,另一部分采用定量方法。从专家收集的信息中,我们试图了解关键因素需求、限制、时间交付和假设中存在的每个项目对关键因素刮擦的强度,以及关键因素刮擦的每个项目与一般项目绩效指标(IGDP)一起施加的强度。根据生成的模拟,可以看到哪些划痕受到项目中大量参数的影响,以及哪些划痕在使用IGDP时表现出较差性能的高概率或中等概率。该研究开发了一个概率模型,该模型基于专家的信念,为项目中可能出现的划痕提供量化。开发的RB允许项目经理基于参数化分析来度量,并因此仔细考虑受项目划痕影响的问题的实际解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Scratchs Analysis of an LCC Project Using a Bayesian Network Model
Emphasizing the need to use models capable of dealing with the uncertainty of the project environment, especially those that can alleviate any scratchs that may arise during the course of the project, the following question arises: How to assess the scratchs of a project developed in LCC at from measurements from a Bayesian Network model? In this context, the goal of the study is to measure and analyze the scratchs of a project developed by the LCC method from a model elaborated in Bayesian Networks. The RB structure is composed of two parts, one with a qualitative approach, the other with a quantitative approach. From the information collected with a specialist, we sought to understand the strength that each item present in the key factors Requirements, Restrictions, Time Deliveries and Assumptions exerts on the key factor scratchs, in addition to the strength that each item of the key factor scratchs exerts together with the General Project Performance Indicator (IGDP). Based on the generated simulations, it seen which scratchs affected by a larger number of parameters in the project, as well as the scratchs that present a high or moderate probability of inferior performance with the IGDP. The research developed a probabilistic model that supplied the quantification of possible scratchs in the project, based on the belief of an expert. The developed RB allowed project managers to measure, and so deliberate on practical solutions to problems that affected by project scratchs, based on parameterized analyses.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Journal of Business and Management Science
International Journal of Business and Management Science Business, Management and Accounting-Business and International Management
自引率
0.00%
发文量
0
期刊介绍: The International Journal of Business and Management Science (IJBMS) (Print: ISSN 1837-6614; Online: 1985-692X) is a double-blind peer-reviewed semiannual journal. Generally the journal publishes the articles that expand knowledge on business and management issues. Business Complexity and Performance Management were the two of the top ten problems IJBMS cover pageof 20th century management. In the 21st century, overcoming such problems seem to be challenging to educators and practitioners. Do educators and practitioners agree on which management skills are required for success in the 21st century? These all issues call for substantial research to achieve a very modern sustainable business era of the global economy. IJBMS intends to focus on the business and management issues with the vision of sustainable competitiveness along with scientific evidences. The quantitative approach for analyzing a research problem is promoted by IJBMS.
期刊最新文献
Boards of Directors and High-Tech Sectors Affect ESG Disclosure Quality: An Empirical Analysis of Global Firms Assessment Method of Bioenergy in the Industrial Sector From Uncertainty to Precision: Advancing Industrial Rework Rate Analysis with Fuzzy Logic Web's Progression: Moving from Passive Content Consumption to Active Content Creation and Content Validation Top Management Team Expansion Study: A New Approach Based on the Team Life Cycle
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1