仿生多目标算法在生产调度问题中的应用

IF 1.6 3区 工程技术 Q4 ENGINEERING, INDUSTRIAL International Journal of Industrial Engineering Computations Pub Date : 2023-01-01 DOI:10.5267/j.ijiec.2022.12.001
Beatriz Flamia Azevedo, Rub´én Montanño-Vega, M. Varela, A. Pereira
{"title":"仿生多目标算法在生产调度问题中的应用","authors":"Beatriz Flamia Azevedo, Rub´én Montanño-Vega, M. Varela, A. Pereira","doi":"10.5267/j.ijiec.2022.12.001","DOIUrl":null,"url":null,"abstract":"Production scheduling is a crucial task in the manufacturing process. In this way, the managers must decide the job's production schedule. However, this task is not simple, often requiring complex software tools and specialized algorithms to find the optimal solution. In this work, a multi-objective optimization model was developed to explore production scheduling performance measures to help managers in decision-making related to job attribution under three simulations of parallel machine scenarios. Five important production scheduling performance measures were considered (makespan, tardiness and earliness times, number of tardy and early jobs), and combined into three objective functions. To solve the scheduling problem, three multi-objective evolutionary algorithms are considered (Multi-objective Particle Swarm Optimization, Multi-objective Grey Wolf Algorithm, and Non-dominated Sorting Genetic Algorithm II), and the set of optimum solutions named Pareto Front, provided by each one is compared in terms of dominance, generating a new Pareto Front, denoted as Final Pareto Front. Furthermore, this Final Pareto Front is analyzed through an automatic bio-inspired clustering algorithm based on the Genetic Algorithm. The results demonstrated that the proposed approach efficiently solves the scheduling problem considered. In addition, the proposed methodology provided more robust solutions by combining different bio-inspired multi-objective techniques. Furthermore, the cluster analysis proved fundamental for a better understanding of the results and support for choosing the final optimum solution.","PeriodicalId":51356,"journal":{"name":"International Journal of Industrial Engineering Computations","volume":"143 1","pages":""},"PeriodicalIF":1.6000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Bio-inspired multi-objective algorithms applied on production scheduling problems\",\"authors\":\"Beatriz Flamia Azevedo, Rub´én Montanño-Vega, M. Varela, A. Pereira\",\"doi\":\"10.5267/j.ijiec.2022.12.001\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Production scheduling is a crucial task in the manufacturing process. In this way, the managers must decide the job's production schedule. However, this task is not simple, often requiring complex software tools and specialized algorithms to find the optimal solution. In this work, a multi-objective optimization model was developed to explore production scheduling performance measures to help managers in decision-making related to job attribution under three simulations of parallel machine scenarios. Five important production scheduling performance measures were considered (makespan, tardiness and earliness times, number of tardy and early jobs), and combined into three objective functions. To solve the scheduling problem, three multi-objective evolutionary algorithms are considered (Multi-objective Particle Swarm Optimization, Multi-objective Grey Wolf Algorithm, and Non-dominated Sorting Genetic Algorithm II), and the set of optimum solutions named Pareto Front, provided by each one is compared in terms of dominance, generating a new Pareto Front, denoted as Final Pareto Front. Furthermore, this Final Pareto Front is analyzed through an automatic bio-inspired clustering algorithm based on the Genetic Algorithm. The results demonstrated that the proposed approach efficiently solves the scheduling problem considered. In addition, the proposed methodology provided more robust solutions by combining different bio-inspired multi-objective techniques. Furthermore, the cluster analysis proved fundamental for a better understanding of the results and support for choosing the final optimum solution.\",\"PeriodicalId\":51356,\"journal\":{\"name\":\"International Journal of Industrial Engineering Computations\",\"volume\":\"143 1\",\"pages\":\"\"},\"PeriodicalIF\":1.6000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Industrial Engineering Computations\",\"FirstCategoryId\":\"5\",\"ListUrlMain\":\"https://doi.org/10.5267/j.ijiec.2022.12.001\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Industrial Engineering Computations","FirstCategoryId":"5","ListUrlMain":"https://doi.org/10.5267/j.ijiec.2022.12.001","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 1

摘要

生产调度是生产过程中的一项重要任务。通过这种方式,经理们必须决定工作的生产计划。然而,这项任务并不简单,通常需要复杂的软件工具和专门的算法来找到最优解。本文建立了一个多目标优化模型,在三种并行机器情景下探索生产调度绩效指标,以帮助管理者进行与工作归因相关的决策。考虑了五个重要的生产调度性能指标(makespan、延迟和提前时间、延迟和提前作业数),并将其合并为三个目标函数。为了解决调度问题,考虑了三种多目标进化算法(多目标粒子群算法、多目标灰狼算法和非支配排序遗传算法II),并将各算法提供的最优解集Pareto Front进行优势度比较,生成新的Pareto Front,称为Final Pareto Front。通过基于遗传算法的生物启发自动聚类算法对最终Pareto Front进行了分析。结果表明,该方法有效地解决了所考虑的调度问题。此外,所提出的方法通过结合不同的仿生多目标技术提供了更健壮的解决方案。此外,聚类分析证明了更好地理解结果和支持选择最终的最佳解决方案的基础。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
Bio-inspired multi-objective algorithms applied on production scheduling problems
Production scheduling is a crucial task in the manufacturing process. In this way, the managers must decide the job's production schedule. However, this task is not simple, often requiring complex software tools and specialized algorithms to find the optimal solution. In this work, a multi-objective optimization model was developed to explore production scheduling performance measures to help managers in decision-making related to job attribution under three simulations of parallel machine scenarios. Five important production scheduling performance measures were considered (makespan, tardiness and earliness times, number of tardy and early jobs), and combined into three objective functions. To solve the scheduling problem, three multi-objective evolutionary algorithms are considered (Multi-objective Particle Swarm Optimization, Multi-objective Grey Wolf Algorithm, and Non-dominated Sorting Genetic Algorithm II), and the set of optimum solutions named Pareto Front, provided by each one is compared in terms of dominance, generating a new Pareto Front, denoted as Final Pareto Front. Furthermore, this Final Pareto Front is analyzed through an automatic bio-inspired clustering algorithm based on the Genetic Algorithm. The results demonstrated that the proposed approach efficiently solves the scheduling problem considered. In addition, the proposed methodology provided more robust solutions by combining different bio-inspired multi-objective techniques. Furthermore, the cluster analysis proved fundamental for a better understanding of the results and support for choosing the final optimum solution.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
5.70
自引率
9.10%
发文量
35
审稿时长
20 weeks
期刊最新文献
A unifying framework and a mathematical model for the Slab Stack Shuffling Problem Heuristics and metaheuristics to minimize makespan for flowshop with peak power consumption constraints Minimizing operating expenditures for a manufacturing system featuring quality reassurances, probabilistic failures, overtime, and outsourcing Composite heuristics and water wave optimality algorithms for tri-criteria multiple job classes and customer order scheduling on a single machine Investigating the collective impact of postponement, scrap, and external suppliers on multiproduct replenishing decision
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1